IMPERIAL COURTYARD

UPRERARegistered

IMPERIAL COURTYARD is a RERA-registered residential project by ARIES INFRAVENTURES in KAZIPUR, Meerut (RERA ID UPRERAPRJ324458). Registered with a completion deadline of 29 Aug 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
8.81%Q2'25
17.66%Q3'25
37.52%Q4'25
50.48%Q1'26
58.88%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ324458
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start1 Nov 2024
Project duration58 months
AddressKHASARA NO. 60, VILL KAZIPUR, MEERUT -250004, KAZIPUR, Meerut, Meerut
TehsilMeerut
Applicant typePartnership Firm
Applicant addressARIES INFRAVENTURES FLAT NO. 105, AKANSHA HEIGHTS, NH-58 ROORKEE BYPASS, MODIPURAM MEERUT-250110
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MDA/BP/23-24/1203

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered29 Jan 2025
Original completion29 Aug 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹77,500
Sanctioning authorityMeerut Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors286 · 2 · 13 (units from plan)
  • 3 BHK154 54%
  • 2 BHK132 46%
ConfigurationUnitsCarpet area
3 BHK154104-207
2 BHK13282-166
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 3 BHK, 2 BHK, SHOP1313283-207
2 · 3 BHK, 2 BHK1215482-207
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ARCHITECT ATELIER
License CA/2000/26549
H.NO. 24, VANSHIKA GREENS , NEAR HELIPAD , SAHASTRADHARA ROAD, DEHRADUN
Engineer
CONVICTION DESIGNS
B-19, BASEMENT, DHARAM PALACE, OPP. GIC COLLEGE, MEERUT
Contractor
M.T. MALIK BUILDING CONSTRUCTION COMPANY
H.NO.12, Mohalla Ghosiyan, Sardhana , Meerut , U.P - 250342
Sr.Development work declared to RERA
1Demarcation of Plots
Boundary wall will be made as per approved drawing. All units will be clearly marked.
2Boundary Wall
Boundary wall of project will be made by fine quality of bricks with plaster on it with standard ratios. Attractive design with lighting will be provided and safety measures will be considered as per standards.
3Road Work
Attractive road work will be done in our project not only to serve functional purpose but also enhance the overall appeal and livability of the community. We will use high quality of cobblestone, interlocking pavers or patterned concrete to create visually appealing road surface and pathways. Integrated decorative bollards, planters along the road for added charm and usability will be provided.
4Footpaths
We will provide wide, well laid pedestrian paths and cycling lanes with textured surface for comfort and safety .
5Water Supply Including Drinking Water Facilities
A reliable and high quality water supply system will be installed as it is essential for ensuring the comfort and well-being of residents of our project. Borewell system for ground water extraction to ensure an uninterrupted water supply will be installed. Large water tanks will be constructed on rooftops to store and distribute water evenly across all units in the project. Automated system for monitoring water levels in water tank will be installed.
6Sewer System
A well planned sewer system will be installed for maintaining hygiene and preventing health hazards. we will arrange for laying an extensive network of underground sewer pipes to collect and transport wastewater from individual units and common areas. We will use durable and corrosion-resistant material to minimize maintenance needs and extend the lifespan of the system. Strategically placed manholes and inspection chambers will be provided for easy access, maintenance and cleaning of the sewer network.
7Drain
A well designed drainage system for preventing water accumulation and ensuring the safety and comfort of residents will be provided. We will construct road and pathways with gentle slops to facilitate the natural flow of rainwater towards designated drains. We will provide surface drains along walkways, parking area and driveways to collect and direct water to the main drainage system. Installation of durable gutters and downspouts to guide rainwater from rooftops to the ground or into rainy water harvesting systems will be done.
8Parks
we will arrange for wide open green areas for relaxation or community events. We will use local plants species for sustainable, low maintenance landscaping that attracts birds and support biodiversity. Smooth and well maintained paths for walking and jogging will be provided.
9Tree Planting
Attractive tree plantation will be done for beautiful environment and numerous ecological, social and health benefits. Prioritize indigenous species that are well adapted to the local climate, require less maintenance will be provides. We will plant trees that are known for high oxygen output and air purifying qualities such as ficus or peepal, can contribute to healthier air.
10Design For Electric Supply Including Street Lighting
An efficient and reliable electric supply, coupled with well designed street lighting is essential for the safety, comfort and convenience of the residents will be provided. A reliable panel system within the project to ensure consistent and sufficient power distribution to all units and common area will be provided. High capicity generators to uninterrupted power during outages, especially for essential services such as elevators, water pumps and security system will be provided.
11Community Buildings
A beautiful community hall will be provided for gathering of residents for miscellaneous meetings and celebrations.
12Treatment and Disposal System of Sewage and Sullage water
Provisions are made for treatment and disposal of sewage and sullage water of building with careful planning and integration with sustainable practices to manage high volume of wastewater generated. We will provide dedicated piping system to separate blackwater (sewage of toilets ) and greywater 9Sullage from showers , sinks and washing machines) for more efficient disposal.
13Solid Waste Management And Disposal System
Provisions for solid waste management to maintaining cleanliness, ensuring public health and supporting environmental sustainability will be done. Effective system that incorporate waste segregation , collection , treatment and final disposal will be installed.
14Water Conservation System
We will install rainwater harvesting system that collect rainwater from rooftops and channel it to underground storage tanks or recharge pits. Water - saving faucets and showerheads will be use to reduce water usage without compromising pressure.
15Energy Management System Including Use of Renewable Energy
An effective energy management system focuses on optimize energy consumption , reducing cost, and incorporating renewable energy solution for sustainability will be implemented. We will install PV panels on rooftops or available open areas to harness solar energy that can be used for common area lighting stc.
16Fire Protection And Fire Safety System
Fire protection system will be installed. Fire alarm panels and integrate detectors with a centralized fire alarm panel, fire hose reels and hydrants, fire extinguishers for quick identification and response in case of a fire will be installed. We will ensure that fire trucks and emergency vehicles have clear access to the building and fire hydrants at all time.
17Social Infrastructure And Other Public Amenities Including Public Health Services
We will establish a community hall where residents can host events, meeting and social gathering . We will create well maintained play area for children.
18Emergency Evacuation Services
We will ensure to provide a detailed plan outlining escape routes, safety assembly points and emergency contacts , properly marked exit routes, fire extinguishers. Generators or battery system for lights and emergency devices will also be installed.
19Other Miscellaneous Work
All other necessary works and facility for residents will be provided.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 29 Aug 2029.

Sanctioned by Meerut Development Authority · 14,426 sqm of land · an approved plan of 2 blocks and 286 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MDA/BP/23-24/120331 Jul 202429 Aug 202929 Aug 203229 Aug 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
6013426Khasra
601000Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 15186
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8542
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Nov 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New12 Nov 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New12 Nov 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New12 Nov 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New12 Nov 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Jan 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New12 Nov 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Dec 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 Dec 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New28 Dec 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New12 Nov 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New12 Nov 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New12 Nov 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New2 Dec 2024 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q1.

QuarterConstructionCertificates
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q18.81%CA ↗ · Arch ↗ · Eng ↗
2025-Q217.66%CA ↗ · Arch ↗ · Eng ↗
2025-Q337.52%CA ↗ · Arch ↗ · Eng ↗
2025-Q450.48%CA ↗ · Arch ↗ · Eng ↗
2026-Q158.88%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameARIES INFRAVENTURES
RolePromoter · current
RERA IDUPRERAPRM197721
PANABPFA2927A
CIN / TANMRTA18729E
Registered addressARIES INFRAVENTURES FLAT NO. 105, AKANSHA HEIGHTS, NH-58 ROORKEE BYPASS, MODIPURAM MEERUT-250110
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ARIES INFRAVENTURES RERA COLLECTION ACCOUNT FOR IMPERIAL COURTYARDBankPUNJAB NATIONAL BANKBranchJAGRITI VIHAR MEERUTBranch addressJAGRITI VIHAR MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCPUNB0400700Branch emailbo4007@pnb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ARIES INFRAVENTURES RERA SEPARATE ACCOUNT FOR IMPERIAL COURTYARDBankPUNJAB NATIONAL BANKBranchJAGRITI VIHARBranch addressJAGRITI VIHAR MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCPUNB0400700
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ARIES INFRAVENTURES RERA TRANSACTION ACCOUNT IMPERIAL COURTYARDBankPUNJAB NATIONAL BANKBranchJAGRITI VIHARBranch addressJAGRITI VIHAR MEERUTBranch districtMeerut, Uttar PradeshA/C no.IFSCPUNB0400700
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Default-on-QPR flagtrue → false
changed in Estanzo’s record
23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about IMPERIAL COURTYARD

Is IMPERIAL COURTYARD RERA registered?

Yes. IMPERIAL COURTYARD is registered with UPRERA under registration number UPRERAPRJ324458, registered on 29 Jan 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for IMPERIAL COURTYARD?

The completion date filed with UPRERA is 29 Aug 2029. No completion certificate is on record yet.

Who is the builder of IMPERIAL COURTYARD?

ARIES INFRAVENTURES is the promoter entity that filed IMPERIAL COURTYARD with UPRERA (promoter RERA ID UPRERAPRM197721). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does IMPERIAL COURTYARD have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is IMPERIAL COURTYARD located?

IMPERIAL COURTYARD is registered in KAZIPUR, Meerut, as filed with UPRERA.

What configurations are available in IMPERIAL COURTYARD?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in IMPERIAL COURTYARD?

The approved unit plan filed with UPRERA runs from 82 to 207 m² of carpet area (about 887 to 2,230 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in IMPERIAL COURTYARD?

The approved unit plan describes 2 blocks and 286 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is IMPERIAL COURTYARD?

About 80 units per acre: 286 planned units across 3.56 acres (14,426 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗