Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut

UPRERARegistered

Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Meerut (RERA ID UPRERAPRJ321319). Registered with a completion deadline of 26 Jan 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ321319
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start30 Apr 2019
Project duration57 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    407

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

  7. to

    Extension granted

  8. Completion certificate filed

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Feb 2019
Original completion29 Oct 2021
Revised completion26 Jan 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Aug 2023
Registration fee₹26,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors480 · 1 · 7 (units from plan)
ConfigurationUnitsCarpet area
1 BHK48023
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
PMAY · 1 BHK748023
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Sh. Shyam Jatan Yadav
License UPAVP
Office complex Sector-9 Shastri Nagar Meerut
Engineer
Sh. Sanjay Jayaswal
11/165 Vasundhra Colony Ghaziabad
Contractor
Should be Filled after approval of Tender
Should be Filled after approval of Tender
Sr.Development work declared to RERA
1Demarcation of Plots
Jagriti Vihar (Ext.) Scheme No 11, Meerut well Planned Scheme, The Pocket of these houses is well demarcated
2Boundary Wall
Not Applicable
3Road Work
Trunk Roads are constructed, only Bitumen work are Remained. We are planning for Internal Roads.
4Footpaths
Not Applicable
5Water Supply Including Drinking Water Facilities
Drinking Water Facility is available in Sector. OHT had been constructed. Trunk water supply line had been already laid.
6Sewer System
Trunk Sewer line has been already laid.
7Drain
Trunk Drains along Trunk Roads has been constructed.
8Parks
Not Applicable
9Tree Planting
Plantation had been made along the trunk roads.
10Design For Electric Supply Including Street Lighting
Jagriti Vihar (Ext.) Scheme No 11, Meerut is a well Planned Scheme. Electric pole and Street lights along trunk roads had been fixed already.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
S.T.P had been constructed and functioning properly disposal of sewage and sullage shall be made through S.T.P.
13Solid Waste Management And Disposal System
Solid waste shall be collected door to door and disposed of by the nagar nigam meerut after the handing over the project.
14Water Conservation System
Not Applicable
15Energy Management System Including Use of Renewable Energy
We are construed houses which are energy efficient.
16Fire Protection And Fire Safety System
Fire hydrant are provided in trunk roads.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Jagriti Vihar (Ext.) Scheme No 11, Meerut is a well Planned Scheme. We are providing different type of facilities for E.W.S., L.I.G., M.I.G. and H.I.G. Houses and other public Amenities.
18Emergency Evacuation Services
Not Applicable
19Other Miscellaneous Work
Jagriti Vihar (Ext.) Scheme No 11, Meerut is a well Planned and vast scheme in meerut. We are providing all Important facilities like roads, water supply, sewer system, electric supply, community center, school, college and convenient shopping center etc.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 12 Aug 2023.

Sanctioned by U.P. Awas Evam Vikas Parishad · 4,132 sqm of land · an approved plan of 1 block and 480 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
40713 Aug 201812 Aug 202312 Aug 202329 Oct 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 26 Jan 2024.

#Granted fromExtended uptoNote
129 Oct 202128 Apr 2022Six months extension in view of force majeure caused by covid-19 pandemic
228 Apr 202227 Apr 2023—
327 Apr 202326 Jan 2024—

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
73 Kajipur, 309 Saraikaji4132Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 1398
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Feb 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Feb 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Feb 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Feb 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Feb 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Feb 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Feb 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Feb 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New11 Feb 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New12 Feb 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New12 Feb 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New12 Feb 2019 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Executive Engineer Construction Division six MeerutBankH.D.F.C.BranchGarh Road MeerutA/C no.IFSCHDFC0001911
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut

Is Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut RERA registered?

Yes. Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut is registered with UPRERA under registration number UPRERAPRJ321319, registered on 20 Feb 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut been completed?

UPRERA still lists Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut as Registered, so it is not shown as completed here. A completion certificate dated 29 Aug 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut more time to complete?

UPRERA's record carries 3 completion extensions for Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut, the latest running to 26 Jan 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut located?

Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut is registered in Meerut, as filed with UPRERA.

What configurations are available in Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut?

The approved unit plan describes 1 block and 480 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 480 nos EWS Houses ( G+3) under Pradhan Mantri Avas Yojna at Sec-2 Jagriti Vihar (Ext.) Yojna No-11, Meerut?

About 470 units per acre: 480 planned units across 1.02 acres (4,132 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗