Iris Garden

UPRERARegistered

Iris Garden is a RERA-registered residential project by Ansal Landmark Townships Pvt. Ltd. in Meerut (RERA ID UPRERAPRJ5475). Registered with a completion deadline of 29 Dec 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5475
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start15 Sept 2010
Original start15 Sept 2010
Project duration148 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typeCompany
Applicant address115 Ansal Bhawan 16 Kasturba Gandhi Marg, New Delhi- 100001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    475/14

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion30 Jun 2022
Revised completion29 Dec 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,26,000
Sanctioning authorityMeerut Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors206 · 5 · 10 (units from plan)
ConfigurationUnitsCarpet area
OTHER206160-261
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A1 · OTHER1039170-261
A2 · OTHER1048261
B1 · OTHER1039170
C1 · OTHER1040160
C2 · OTHER1040160
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ANIL TYAGI
License CA/92/15029
112 ANSAL BHAWAN ,16 KG MARG, C P NEW DELHI
Engineer
JUNEJA TECHNO CONSULTANT PVT. LTD
5 A ,DDA FLATS,SARAI JULIANA ,New Delhi
Contractor
ALORA LANDMARK PVT. LTD.
Sr.Development work declared to RERA
1Demarcation of Plots
COMPLETE
2Boundary Wall
INPROGRESS
3Road Work
INPROGRESS
4Footpaths
NO PROGRESS
5Water Supply Including Drinking Water Facilities
INPROGRESS
6Sewer System
INPROGRESS
7Drain
INPROGRESS
8Parks
NO PROGRESS
9Tree Planting
NO PROGRESS
10Design For Electric Supply Including Street Lighting
AVAILABLE
11Community Buildings
INPROGRESS
12Treatment and Disposal System of Sewage and Sullage water
TO BE PROVIDED BY MEERUT DEVELOPMENT AUTHORITY
13Solid Waste Management And Disposal System
SHALL BE PROVIDED
14Water Conservation System
YET TO START
15Energy Management System Including Use of Renewable Energy
SHALL BE PROVIDED
16Fire Protection And Fire Safety System
PROVISIONAL NOC OBTAINED FROM JOINT DIRECTOR FIRE SERVICES
17Social Infrastructure And Other Public Amenities Including Public Health Services
SHALL BE PROVIDED
18Emergency Evacuation Services
AVAILABLE
19Other Miscellaneous Work
SHALL BE PROVIDED
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 21 Dec 2020.

Sanctioned by Meerut Development Authority · 24,122 sqm of land · an approved plan of 5 blocks and 206 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
475/1422 Dec 201521 Dec 202021 Dec 202330 Jun 2022
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Dec 2022.

#Granted fromExtended uptoNote
130 Jun 202229 Dec 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

2 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Sec-3 Sushant City24122—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 10 Jul 2006.

Registry no.DateTypeArea
744610 Jul 2006self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 7446
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New9 Jun 2020 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)Yes
Health serviceAll the drainage and sewage disposals have been made in the trunk sewer /drain line of MDA
Renewable energyYes
Other facilitiesWe are providing club and shop

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2020-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAnsal Landmark Townships Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM10541
PANAAECA8892P
CIN / TANU45201DL2004PTC129188
Name of chairman1. Naresh Kumar Ghai 2. Rajeev Kumar Nair 3. Aja
Registered address115 Ansal Bhawan 16 Kasturba Gandhi Marg, New Delhi- 100001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Meerut

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Iris Garden -Ansal Landmark -Collection AccountBankICICI BANK LTDBranchNEW DELHI - CONNAUGHT PLACE - IIA/C no.IFSCICIC0000343
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)179 (Under Registration - 1 ) → 180 (Under Registration - 2 )
changed in Estanzo’s record
31 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 31 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Iris Garden

Is Iris Garden RERA registered?

Yes. Iris Garden is registered with UPRERA under registration number UPRERAPRJ5475, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Iris Garden?

The completion date filed with UPRERA is 29 Dec 2022. No completion certificate is on record yet.

Who is the builder of Iris Garden?

Ansal Landmark Townships Pvt. Ltd. is the promoter entity that filed Iris Garden with UPRERA (promoter RERA ID UPRERAPRM10541). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Iris Garden show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Iris Garden more time to complete?

UPRERA's record carries 1 completion extension for Iris Garden, the latest running to 29 Dec 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Iris Garden have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Iris Garden located?

Iris Garden is registered in Meerut, as filed with UPRERA.

What configurations are available in Iris Garden?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Iris Garden?

The approved unit plan filed with UPRERA runs from 160 to 261 m² of carpet area (about 1,721 to 2,814 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Iris Garden?

The approved unit plan describes 5 blocks and 206 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Iris Garden?

About 35 units per acre: 206 planned units across 5.96 acres (24,122 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗