Jade County Phase-1

UPRERARegistered

Jade County Phase-1 is a RERA-registered residential project by Themecounty Private Limited in Sector-8, Wave City, near NH-24 Ghaziabad, Tehsil Dadri, Gautam Buddha Nagar, Gautam Budh Nagar (RERA ID UPRERAPRJ267958). Registered with a completion deadline of 27 Mar 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'25
0%Q3'25
0%Q4'25
1%Q1'26
3%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ267958
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 May 2025
Project duration59 months
AddressPlot No. GH-10, Cherrywood Enclave, Sector-8, Wave City, near NH-24 Ghaziabad, Tehsil Dadri, District-Gautam Buddha Nagar, Uttar Pradesh., Sector-8, Wave City, near NH-24 Ghaziabad, Tehsil Dadri, Gautam Buddha Nagar, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant address8th Floor, Plot No. 15, Sector 135, Nagla Charandas, Gautam Buddha Nagar, Dadri, Uttar Pradesh, India, 201305
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    GDA/BP/24-25/1602

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Jun 2025
Original completion27 Mar 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,66,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors629 · 6 · 32 (units from plan)
Homes · commercial units604 · 25 (shops and offices filed in the same plan)
  • 4 BHK484 77%
  • 3 BHK120 19%
  • SHOP25 4%
ConfigurationUnitsCarpet area
4 BHK484150-189
3 BHK120121
SHOP2514-15
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Commercial · SHOP12514-15
Tower B2 · 4 BHK29116189
Tower C1 · 4 BHK30120150
Tower C2 · 4 BHK31124150
Tower C3 · 4 BHK31124150
Tower D1 · 3 BHK30120121
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar. Vishal Sharma
License CA/1998/23261
Confluence Consultancy Services, F-1, First Floor, Mira Corporate Suites, Ishwar Nagar, New Delhi, PIN-110065
Engineer
Dr. Vinod Kumar Jain
Vinitech Consultants, C-35, Pamposh Enclave, GK-1, New Delhi, PIN-110048
Contractor
Mr. Ashish Bhartia
County Estate Developers LLP, 8th Floor, Plot No. 15, Sector-135, Noida, Gautam Buddha Nagar, PIN-201301
Sr.Development work declared to RERA
1Demarcation of Plots
PLOT AREA 53639.49 SQM ( ATTACH LAYOUT PLAN ) NORTH - OTHER PROPOERTY EAST - 56.0 M WIDE ROAD SOUTH - 46.0 M WIDE ROAD WEST - 62.0 M WIDE ROAD
2Boundary Wall
COMBINATION OF M.S RALING AND R.C.C WALL
3Road Work
YES, CONCRETE ROAD WITH KERB STONE ON EDGE
4Footpaths
YES, AS PER LANDSCAPE CONSULTANT DESIGN
5Water Supply Including Drinking Water Facilities
Yes, municipal Water Supply will be collected in underground water reservoirs and through pumps Terrace Tanks will be filled.
6Sewer System
YES, sewage collected through system of DWC hume pipe with manhole, chambers and collection chambers will get treated in STP plant and after treatment will be connected with municipal Sewer system.
7Drain
YES, Terrace storm water will get collected in R.W.H pit for Ground water recharge.
8Parks
YES, as per landscape consultant design with plants, waterbodies and shrubs.
9Tree Planting
YES, AS PER LANDSCAPE CONSULTANT DESIGN.
10Design For Electric Supply Including Street Lighting
Yes, Electric will be Supplied from state electricity board. V.C.B. Room, L. T. room and Transformers of mentioned capacity (4 nos. of 2000 KVA for Residential and 1-2000 KVA for common services ), will be provided in the whole Project.
11Community Buildings
YES, provided with facility like banquet, swimming pool, gym, yoga, and sports hall etc.
12Treatment and Disposal System of Sewage and Sullage water
Sewage will be treated in STP and excess treated water will be discharged in municipal drain after approval.
13Solid Waste Management And Disposal System
YES , solid waste will be managed by installing organic waste converter , segregation of waste at household level.
14Water Conservation System
YES, through a network of R .W.H pit, and using grey water/ treated water in flushing , irrigation etc.
15Energy Management System Including Use of Renewable Energy
YES, SOLAR PV panel will be installed.
16Fire Protection And Fire Safety System
MSMO pumps 2850 LPM Electrical 2 Nos. MSMO pumps 2850 LPM Diesel 2 Nos. MSMO Jockey 180 LPM Electrical 2 Nos. Water Curtain 9000 LPM Electrical 1 No. Sprinkler in basement and tower yard hydrants. Automatic fire detection and alarm system, mechanical ventilation with axial fans and jet fans CO sensors etc.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Sanitary facilities provided on the ground floor of every Tower. Sports facility provided. Community hall is provided.
18Emergency Evacuation Services
Yes, Refuge Area provided at every Blocks, along with fire tender path around each tower. TOWER A - 16th and 24th Floor TOWER B1 , B2 and 4 - 17th and 26th Floor TOWER C1 , C2 , C3 - 17th and 26th Floor TOWER D1 , D2 And D3 - 17th and 26th Floor (In addition to the main staircase, fire staircase and Balconies) Along with fire tender path also provided around each tower.
19Other Miscellaneous Work
Guard Room , Entrance and Exit gates, Maintenance Room, Commercial Facilities , CCTV, Video Conferencing , Calling facility and Security Guards for proper watch and ward.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 28 Mar 2030.

Sanctioned by Ghaziabad Development Authority · 32,292 sqm of land · an approved plan of 6 blocks and 629 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
GDA/BP/24-25/16024 Apr 202528 Mar 203028 Mar 203327 Mar 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. GH-10 admeasuring 53,939.49 square meters falling in the developed Cherrywood Enclave, Sector-8, Wave City, situated on NH 24, near Ghaziabad, Tehsil Dadri, Distt. Gautam Buddha Nagar, Uttar Pradesh53939.49Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 66411
The registered deed by which the promoter bought the land.
PDF ↗
Allotment letter from the authority · 12.12.2024
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New24 Apr 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 Apr 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New15 Apr 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New15 Apr 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New15 Apr 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New15 Apr 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New24 Apr 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New15 Apr 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New15 Apr 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New12 May 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Apr 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New15 Apr 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New15 Apr 2025 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.

QuarterConstructionCertificates
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q30%CA ↗ · Arch ↗ · Eng ↗
2025-Q41%CA ↗ · Arch ↗ · Eng ↗
2026-Q13%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameThemecounty Private Limited
RolePromoter · current
RERA IDUPRERAPRM206951
PANAAJCT5443N
CIN / TANMRTT04649B
Name of chairmanMr. Puspahas Agarwal
Registered address8th Floor, Plot No. 15, Sector 135, Nagla Charandas, Gautam Buddha Nagar, Dadri, Uttar Pradesh, India, 201305
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Themecounty Private Limited Collection Account for Jade County Phase-1BankKotak Mahindra Bank Ltd.BranchNoida SEC BranchBranch addressUGF Unit No. 15, 16, 17 and 18, Paramount Flora Ville, Sector 137, Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201305Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0005040Branch emailuwais.rahman@kotak.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Themecounty Private Limited Separate Bank Account for Jade County Phase-1BankKotak Mahindra Bank Ltd.BranchNoida SEC BranchBranch addressUGF Unit No. 15, 16, 17 and 18, Paramount Flora Ville, Sector-137, Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201305Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0005040
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Themecounty Private Limited RERA Transaction Account for Jade County Phase-1BankKotak Mahindra Bank Ltd.BranchNoida SEC BranchBranch addressUGF Unit No. 15, 16, 17 and 18, Paramount Flora Ville, Sector-137, Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201305Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCKKBK0005040
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 17
Proforma of Agreement for Sale
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 16
ENGINEERS CERTIFICATE
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 15
ARCHITECT CERTIFICATE
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 14
CA CERTIFICATE
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 13
Affidavit (Form-B)
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 12
Development Work Plan
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 11
Electricity Supply Plan
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 10
Water Supply Plan
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 9
Waste Disposal Plan
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 8
Proforma of Conveyance Deed
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 7
Proforma of Allotment Letter
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 6
Proforma of Application Form
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 5
Other Plan(If Any)
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 4
Commencement Certificate
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 3
Details of Encumbrances
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 2
Other
newly filed with RERA
1 Sept 2026
Filed document
viewprojects · 1
Proforma of Completion Certificate(Occupancy)
newly filed with RERA
1 Sept 2026
Filed document
summary · 20
Commencement Certificate
no longer on the record
1 Sept 2026
Filed document
summary · 19
Proforma of Application Form
no longer on the record
1 Sept 2026
Filed document
summary · 18
Proforma of Allotment Letter
no longer on the record
1 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Jade County Phase-1

Is Jade County Phase-1 RERA registered?

Yes. Jade County Phase-1 is registered with UPRERA under registration number UPRERAPRJ267958, registered on 3 Jun 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Jade County Phase-1?

The completion date filed with UPRERA is 27 Mar 2030. No completion certificate is on record yet.

Who is the builder of Jade County Phase-1?

Themecounty Private Limited is the promoter entity that filed Jade County Phase-1 with UPRERA (promoter RERA ID UPRERAPRM206951). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Jade County Phase-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Jade County Phase-1 located?

Jade County Phase-1 is registered in Sector-8, Wave City, near NH-24 Ghaziabad, Tehsil Dadri, Gautam Buddha Nagar, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Jade County Phase-1?

The unit plan filed with UPRERA lists 4 BHK, 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Jade County Phase-1?

The approved unit plan filed with UPRERA runs from 14 to 189 m² of carpet area (about 156 to 2,038 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Jade County Phase-1?

The approved unit plan describes 6 blocks and 629 units of which 604 are homes and 25 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Jade County Phase-1?

About 79 units per acre: 629 planned units across 7.98 acres (32,292 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗