Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ2570
Project categoryResidential
Registration typeNew
RERA statusCompleted
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Sept 2017
Project duration45 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Registered with RERA

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Permit revalidated

    256/GH-07 MANCHITR/JOAN-5/16

  4. Building permit sanctioned

    256/GH-07 MANCHITR/JOAN-5/16

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Completed.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion30 Nov 2019
Revised completion29 Nov 2020
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary1 Sept 2021
Registration fee₹36,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors310 · 2 · 15 (units from plan)
Homes · commercial units296 · 14 (shops and offices filed in the same plan)
  • 2 BHK206 66%
  • 1 BHK90 29%
  • SHOP14 5%
ConfigurationUnitsCarpet area
2 BHK20637-48
1 BHK9024
SHOP1410-15
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER - A1 · 2 BHK, SHOP1519010-48
TOWER - B1 · 2 BHK, 1 BHK1512024-37
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Niraj Kumar Nanda
License CA/2009/46122
Pocket 07 KV sec. 82 Noida- 201304
Engineer
NNC Design International
NNC Design International G-70, 2nd Floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, Okhla, New Delhi-110025
Contractor
Infra 13
Mezzanine floor , M4 South extension , Part-II , New Delhi – 110049
Sr.Development work declared to RERA
1Demarcation of Plots
As per Approved Layout
2Boundary Wall
As per Sanction Plan
3Road Work
Roads as per IRC Norms
4Footpaths
As per IRC Norms
5Water Supply Including Drinking Water Facilities
As per CPHEEO Manual on Water Supply and Treatment
6Sewer System
As per Manual On Sewerage And Sewage Treatment CPHEEO
7Drain
As per guidelines recommended in CPHEEO manual on Sewerage and Sewage Treatment or other relevant codes
8Parks
Provision as per approved Layout and local regulations
9Tree Planting
As per norms
10Design For Electric Supply Including Street Lighting
Designed as per UPPCL guidelines
11Community Buildings
Provision as per approved Layout and local regulations
12Treatment and Disposal System of Sewage and Sullage water
As per Manual On Sewerage And Sewage Treatment CPHEEO
13Solid Waste Management And Disposal System
As per Manual on Solid Waste Management Systems (CPHEEO-2000)
14Water Conservation System
Rain water harvesting and recycling as per EIA provisions
15Energy Management System Including Use of Renewable Energy
As per EIA Provisions
16Fire Protection And Fire Safety System
As per NBC
17Social Infrastructure And Other Public Amenities Including Public Health Services
Provision as per approved Layout and local regulations
18Emergency Evacuation Services
As per NBC
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1SMC Real Estate Advisors Private LimitedUPRERAAGT10113
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 17 Oct 2022. 1 of them carries a revalidation.

Sanctioned by Ghaziabad Development Authority · 6,239 sqm of land · an approved plan of 2 blocks and 310 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
Applied For17 Oct 2022—29 Nov 2020—
256/GH-07 MANCHITR/JOAN-5/1617 Oct 201717 Oct 202216 Oct 202528 May 202117 Oct 2017
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Nov 2020.

#Granted fromExtended uptoNote
130 Nov 201929 Nov 2020—

Land & documents

32 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
120750.5123—
121198.5736—
122198.8813—
1231015.8252—
3524028.7893—
11947.1083—
11947.1083Khasra
122198.8813Khasra
120750.5123Khasra
121198.5736Khasra
1231015.8252Khasra
3524028.7893Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

6 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 12 Sept 2006.

Registry no.DateTypeArea
281218 Jun 2010self—
63344 Oct 2011self—
769212 Sept 2006self—
281218 Jun 2010self—
63344 Oct 2011self—
632119 Nov 2008self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1416-1421
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1416-1421
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Lease deed · 2812
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 6334
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 2812
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 6334
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New12 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New12 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New12 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New3 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New12 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New28 May 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 May 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
Old26 Oct 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old26 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old26 Oct 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old26 Oct 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old26 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old26 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old26 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterprovision for portable water supply
Fire safety (as filed with RERA)Adequate Measures as per fire norms
Health serviceAdequate facility as required
Renewable energyAdequate measures shall be taken as per EIA provision

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameUppal Chadha Hi-Tech Developers Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM5538
PANAAACU7200M
CIN / TANU45201DL2004PTC128784
Registered addressM-4 Mezzanine Floor, South Extension Part II, New Delhi, Delhi 110049
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Uppal Chadha Hi-Tech Developers Pvt. LtdBankYes BankBranchYes Bank Nehru Place,NDA/C no.IFSCYESB0000235
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

3 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)1056 (Under Registration - 1 ) → 1056 (Under Registration - 0 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 0 ) → 1056 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)1055 (Under Registration - 1 ) → 1055 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SWAMANORATH

Is SWAMANORATH RERA registered?

Yes. SWAMANORATH is registered with UPRERA under registration number UPRERAPRJ2570, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has SWAMANORATH been completed?

UPRERA lists SWAMANORATH as completed, with a completion certificate dated 1 Sept 2021, against a filed deadline of 29 Nov 2020.

Who is the builder of SWAMANORATH?

Uppal Chadha Hi-Tech Developers Pvt. Ltd. is the promoter entity that filed SWAMANORATH with UPRERA (promoter RERA ID UPRERAPRM5538). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SWAMANORATH more time to complete?

UPRERA's record carries 1 completion extension for SWAMANORATH, the latest running to 29 Nov 2020. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SWAMANORATH have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SWAMANORATH located?

SWAMANORATH is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in SWAMANORATH?

The unit plan filed with UPRERA lists 2 BHK, 1 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SWAMANORATH?

The approved unit plan filed with UPRERA runs from 10 to 48 m² of carpet area (about 106 to 521 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SWAMANORATH?

The approved unit plan describes 2 blocks and 310 units of which 296 are homes and 14 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SWAMANORATH?

About 201 units per acre: 310 planned units across 1.54 acres (6,239 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗