LJK Divinity Phase I is a RERA-registered residential project by LJK Construction India Private Limited in Bhuhera, Dharsaniya & Sarthara, Barabanki (RERA ID UPRERAPRJ440117). Registered with a completion deadline of 8 Apr 2031.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ440117 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 25 May 2026 |
| Project duration | 59 months |
| Address | Village Dharsaniya Khasra No 206, 213, 216, 223, 226, 231, 232, 233, 188 MI, 189, 190, 192, 219MI, 228MI & Village Bhuhera Khasra No.425, 426, 424 MI & Village Sarthana Khasra No- 578, 579, 580, 586, 587, 588, 589, 620, 621, 622, 624, 625 Ayodhya Road Barabanki., Bhuhera, Dharsaniya & Sarthara, Nawabganj, Barabanki |
| Tehsil | Nawabganj |
| Applicant type | Company |
| Applicant address | 7th FLOOR ELDECO CORPORATE CHAMBER 2 VIBHUTI KHAND GOMTI NAGAR 2, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
193/2025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 Sept 2026 |
| Original completion | 8 Apr 2031 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹3,02,000 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation shall be done with RCC poles for Blocks and Plots |
| 2 | Boundary Wall A 2.4 mt high permanent boundary wall is proposed to be consructed to enclose the site. A well designed gate complex shall be part of it. |
| 3 | Road Work With 18 mt. entrance road, network of 12.00 and 9.00 mt. wide RCC road is proposed to be constructed as per CPWD norms. |
| 4 | Footpaths 900 to 1200 mm. wide paved area shall run on both side of the roads as footpath.Grass pevers will be fixed on Footpath |
| 5 | Water Supply Including Drinking Water Facilities We will provide Two nos. of pump to fill up UG tank with 430 LKD to supply drinking water to the whole township. Make of pumps and pipes shall be as per the standard good quality specifications. |
| 6 | Sewer System A well designed sewerage system is proposed to be laid to carry sewage/soil water up to STP of 390 KLD capacity. All the standard quality material shall be used to match CPWD Norms. |
| 7 | Drain Storm water from Roads and other landscape area shall be connected to the Storm water drain channel which shall lead to Rain water harvesting Pits to recharge the Ground water. |
| 8 | Parks Marked green areas shall be developed as theme parks with facilities for elderly, children and residents in general. Low height trees, shrubs and grass carpet shall be common to all the green spaces. |
| 9 | Tree Planting All the roads shall be lined with 4.5 to 6 mt. high trees(Plumeria Alba etc.) at close recommended intervals. |
| 10 | Design For Electric Supply Including Street Lighting We will design & implement the system as per local electricity Board and will consider centralized 2 Transformer With 22000 KVA capacity, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. |
| 11 | Community Buildings A club building with basic facilities is proposed to be constructed on the marked area. |
| 12 | Treatment and Disposal System of Sewage and Sullage water A well designed sewerage system is proposed to be laid to carry sewage/soil water up to STP of required capacity. All the standard quality material shall be used to match CPWD Norms. |
| 13 | Solid Waste Management And Disposal System There is a proper garbage collection area maked for garbage disposal. Collection shall be lined up with the local municipal authorities. |
| 14 | Water Conservation System Apart from rainwater harvesting, treated water shall be used for irrigation purposes resulting in zero wastage. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Amarnath Pandey | UPRERAAGT22741 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 8 Apr 2031.
Sanctioned by Any Other Competent Authority · 59,319 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 193/2025 | 9 Apr 2026 | 8 Apr 2031 | 8 Apr 2034 | 8 Apr 2031 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
55 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 425 | 9200 | Khasra |
| 426 | 2340 | Khasra |
| 188 MIN | 520 | Khasra |
| 206 | 3800 | Khasra |
| 208 | 3400 | Khasra |
| 209 | 955 | Khasra |
| 210 | 2580 | Khasra |
| 213 | 680 | Khasra |
| 216 | 3720 | Khasra |
| 219 MIN | 6680 | Khasra |
| 220 | 1330 | Khasra |
| 221 | 1110 | Khasra |
| 223 | 3600 | Khasra |
| 224 | 3320 | Khasra |
| 225 | 3200 | Khasra |
| 226 | 3180 | Khasra |
| 228 MIN | 1770 | Khasra |
| 228 MIN | 9950 | Khasra |
| 231 | 680 | Khasra |
| 232 | 1350 | Khasra |
| 233 | 680 | Khasra |
| 247 | 4180 | Khasra |
| 577 | 1140 | Khasra |
| 578 | 1340 | Khasra |
| 579 | 2520 | Khasra |
| 580 | 1420 | Khasra |
| 587 | 5320 | Khasra |
| 588 | 5470 | Khasra |
| 589 | 410 | Khasra |
| 620 | 1137.5 | Khasra |
| 620 | 3412 | Khasra |
| 621 | 2275 | Khasra |
| 621 | 2275 | Khasra |
| 622 | 110 | Khasra |
| 624 | 5820 | Khasra |
| 625 | 1980 | Khasra |
| 189 | 70 | Khasra |
| 190 | 410 | Khasra |
| 192 | 1420 | Khasra |
| 586 | 400 | Khasra |
| 424 MIN | 560 | Khasra |
| Sale deed · 5004 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5671 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5003 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2157 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17005 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1438 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1442 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1440 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1437 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1434 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 13871 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2156 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1436 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5674 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21395 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3038 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3040 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21406 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5670 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21405 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3034 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3037 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21394 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1435 chain deed The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 13871 chain deed The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15624 (chain deed) The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2602 Chain Deed The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 13871 Chain Deed The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Land Exchange Khasra 189,190 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Land Exchange Khasra 586 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Highlighted Khatauni An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Certified Khatauni An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Mutation and 143 Orders An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · CONSORTIUM An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 424(Min) Khasra No. An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · LAND CHART The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · ELECTRICITY SUPPLY PLAN LJK The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Affidavit for GS Land An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Point wise reply to queries for RERA Registration LJK Divinity Phase-1 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · CONSORTIUM AMENDMENT DEED (112 ) The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Jun 2026 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 17 Jun 2026 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 17 Jun 2026 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 17 Jun 2026 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Jun 2026 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 17 Jun 2026 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Jun 2026 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 17 Jun 2026 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 17 Jun 2026 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Jun 2026 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Jun 2026 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 17 Jun 2026 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 22 Aug 2026 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 17 Jun 2026 ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | LJK Construction India Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM219774 |
| PAN | AAGCM9938C |
| CIN / TAN | U45400UP2010PTC075237 |
| Name of chairman | ARPIT RASTOGI |
| Registered address | 7th FLOOR ELDECO CORPORATE CHAMBER 2 VIBHUTI KHAND GOMTI NAGAR 2, Lucknow |
| RERA contact | |
| Registered since | 2023 |
| Legal name | JADE NIRMAN PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Cabin No.1, Unit No. -1102, 11th Floor, Eldeco Corporate Chamber-II, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, 226010 |
| RERA contact |
| Legal name | PRATHA CONSTRUCTIONS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Cabin No.1, Unit No. -1102, 11th Floor, Eldeco Corporate Chamber-II, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, 226010 |
| RERA contact |
| Legal name | STANCE CONSTRUCTIONS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Cabin No.1, Unit No. -1102, 11th Floor, Eldeco Corporate Chamber-II, Vibhuti Khand, Gomti Nagar, Lucknow, Uttar Pradesh, India, 226010 |
| RERA contact |
Nearby projects
Barabanki
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | LJKCIPL COLL A/C FOR LJK DIVINITY PHASE IBankSTATE BANK OF INDIABranchSAFEDABAD BRANCHBranch addressSAFEDABAD BRANCH, TEHSIL NAWABGANJ, BARABANKI - 225003Branch districtBarabanki, Uttar PradeshA/C no.IFSCSBIN0014445Branch emailsbi.14445@sbi.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | LJKCIPL SEP A/C FOR LJK DIVINITY PHASE IBankSTATE BANK OF INDIABranchSAFEDABAD BRANCHBranch addressSAFEDABAD BRANCH, TEHSIL NAWABGANJ, BARABANKI - 225003Branch districtBarabanki, Uttar PradeshA/C no.IFSCSBIN0014445 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | LJKCIPL TRANS A/C FOR LJK DIVINITY PHASE IBankSTATE BANK OF INDIABranchSAFEDABAD BRANCHBranch addressSAFEDABAD BRANCH, TEHSIL NAWABGANJ, BARABANKI - 225003Branch districtBarabanki, Uttar PradeshA/C no.IFSCSBIN0014445 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
3 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about LJK Divinity Phase I
Is LJK Divinity Phase I RERA registered?
Yes. LJK Divinity Phase I is registered with UPRERA under registration number UPRERAPRJ440117, registered on 10 Sept 2026. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for LJK Divinity Phase I?
The completion date filed with UPRERA is 8 Apr 2031. No completion certificate is on record yet.
Who is the builder of LJK Divinity Phase I?
LJK Construction India Private Limited is the promoter entity that filed LJK Divinity Phase I with UPRERA (promoter RERA ID UPRERAPRM219774). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does LJK Divinity Phase I have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is LJK Divinity Phase I located?
LJK Divinity Phase I is registered in Bhuhera, Dharsaniya & Sarthara, Barabanki, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗