Suncity is a RERA-registered residential project by Omega Builders in Barabanki (RERA ID UPRERAPRJ498190). Registered with a completion deadline of 31 Mar 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ498190 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 1 Apr 2021 |
| Project duration | 12 months |
| Address | Nawabganj, Barabanki |
| Tehsil | Nawabganj |
| Applicant type | Partnership Firm |
| Applicant address | 4/169, Vishal Khand, Gomti Nagar, Uttar Pradesh, 226010 LUCKNOW, |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1805/ Map/ Zi. Pa./ 2018-19
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 4 Jun 2021 |
| Original completion | 31 Mar 2022 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 25 Mar 2022 |
| Registration fee | ₹68,500 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots THE PLOTS WILL BE WELL DEMARCATED BY PLACING IRON ANGELS ON ALL FOUR CORNERS OF EACH PLOT SO THAT THEY CAN BE EASILY IDENTIFIED AND THAT A SIGN BOARD WITH THE PLOT NUMBER SHALL BE PUT UP ON THE FRONT OF EACH PLOT WITH THE DIMENSIONS AREA AND SIZE. |
| 2 | Boundary Wall BOUNDARY WALL WILL BE PROVIDED WITH BRICK WORK UPTO 1.2M ALONG WITH M.S GRILL UPTO 0.6M HT BIFURCATING THE PHASE II ONLY NOT ON ANY OTHER SIDE OF THE PLOT. |
| 3 | Road Work 12MTS ROAD WITH CENTRAL BITUMIN FINISH AND SOFT PAVEMENTS ON BOTH SIDES OF ROAD SHALL MADE ON EASTERN SIDE 18MTR WIDE ROAD WITH CENTRAL BITUMIN FINISHED AND SOFT PAVEMENTS ON BOTH SIDES SHALL BE MADE ON NORTH SIDE. |
| 4 | Footpaths THERE WILL BE FOOTPATH ALONG BOTH THE ROADS. |
| 5 | Water Supply Including Drinking Water Facilities WATER SUPPLY TO INDIVIDUAL PLOT WILL BE THROUGH PROPOSED 80MM. |
| 6 | Sewer System 250MM PIPE WITH CHAMBER AT JUNCTION OF TWO PLOTS IS TO BE PROVIDED. THIS SEWER LINE SHALL BE CONNECTED WITH THE EXISTING MUNICIPAL SEWAGE LINE. |
| 7 | Drain DRAIN ALONG THE MAIN ROAD SHALL BE PROVIDED WITH PROPER SLOPE. |
| 8 | Parks PARK SHALL BE DEVELOPED WITH STRUCTURED GREEN AREA. |
| 9 | Tree Planting TREE ALONG THE ROAD AND ONE TREE IN THE FRONT SIDE OF EACH PLOT SHALL BE PLANTED. |
| 10 | Design For Electric Supply Including Street Lighting ELECTRICITY POLES WITH LT CONNECTION AND STREET LIGHT SHALL BE ERRECTED ALONG THE ROAD SO THAT PLOT HOLDER CAN GET EASY CONNECTION. |
| 11 | Community Buildings A CLUB IS PROVIDED IN THE PROJECT. |
| 12 | Treatment and Disposal System of Sewage and Sullage water NA |
| 13 | Solid Waste Management And Disposal System NA |
| 14 | Water Conservation System PROPER GUIDELINES WILL BE FOLLOWED FOR CONSERVATION OF NATURAL WATER. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services PROPER PROVISION FOR SOCIAL INFRA AND PUBLIC AMENITIES PROVIDED. |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 26 Feb 2024.
Sanctioned by Any Other Competent Authority · 12,665 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1805/ Map/ Zi. Pa./ 2018-19 | 27 Feb 2019 | 26 Feb 2024 | 26 Feb 2026 | 31 Mar 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 255, 256 | 12664.66 | Khasra |
| Sale deed · 7202/14 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6304/14 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 6303 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 3 Jun 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 16 Apr 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 16 Apr 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 16 Apr 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 May 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 May 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 May 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 May 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Apr 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 3 Jun 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 23 Apr 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 2 Jun 2021 ↗ |
Quarterly progress reports
4 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
4 quarterly progress reports are on file with UPRERA, covering 2021-Q1 to 2021-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omega Builders |
| Role | Promoter · current |
| RERA ID | UPRERAPRM130424 |
| PAN | AADFO3984A |
| CIN / TAN | LKNO06101E |
| Registered address | 4/169, Vishal Khand, Gomti Nagar, Uttar Pradesh, 226010 LUCKNOW, |
| RERA contact | |
| Registered since | 2020 |
Nearby projects
Barabanki
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | OMEGA BUILDERS- SEPARATE BANK ACCOUNT FOR SUNCITYBankAXIS BANK LTDBranchGRAM OBRI, BARABANKIA/C no.IFSCUTIB0000743 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Suncity
Is Suncity RERA registered?
Yes. Suncity is registered with UPRERA under registration number UPRERAPRJ498190, registered on 4 Jun 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Suncity been completed?
UPRERA still lists Suncity as Registered, so it is not shown as completed here. A completion certificate dated 25 Mar 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Suncity?
Omega Builders is the promoter entity that filed Suncity with UPRERA (promoter RERA ID UPRERAPRM130424). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Suncity have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Suncity located?
Suncity is registered in Barabanki, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗