MAHAGUN MYWOODS is a RERA-registered residential project by MAHAGUN (INDIA) PVT. LTD. in Gautam Budh Nagar (RERA ID UPRERAPRJ3330). Registered with a completion deadline of 28 Sept 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3330 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Apr 2011 |
| Original start | 1 Apr 2011 |
| Project duration | 150 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | A-19, Sector-63, Noida, Uttar Pradesh-201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
PLG(BP)2572/7667
2 building permits sanctioned
Registered with RERA
3 completion certificates filed
Extension granted (2)
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Jul 2017 |
| Original completion | 30 Jun 2021 |
| Revised completion | 28 Sept 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 4 Apr 2019 |
| Registration fee | ₹7,34,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK2,026 32%
- 3 BHK2,006 32%
- OTHER1,875 30%
- 4 BHK230 4%
- SHOP140 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 2,006 | 67-108 |
| 2 BHK | 2,026 | 50-97 |
| OTHER | 1,875 | 53-74 |
| SHOP | 140 | 14-72 |
| 4 BHK | 230 | 113-125 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| ALPINE (7C1) · OTHER, 3 BHK, 2 BHK | 23 | 179 | 53-97 |
| ASPEN (11A6) · OTHER, 3 BHK, 4 BHK | 26 | 203 | 74-125 |
| Axle wood (30) · OTHER, 3 BHK, 2 BHK | 28 | 226 | 55-67 |
| CAMPHOR (5A5) · 2 BHK, OTHER | 23 | 136 | 53-70 |
| CHESTNUT (10H) · OTHER, 2 BHK, 3 BHK | 26 | 203 | 64-108 |
| Cinnamon(26) · 2 BHK, 3 BHK | 28 | 222 | 55-70 |
| Coral wood (28) · OTHER, 3 BHK, 2 BHK | 28 | 220 | 55-67 |
| DURIAN (18E) · 4 BHK, 3 BHK, OTHER | 22 | 172 | 70-113 |
| EBONY (6F2) · 2 BHK, OTHER, 3 BHK, 4 BHK | 23 | 184 | 53-113 |
| Fiddle wood (29) · 3 BHK, 2 BHK, OTHER | 28 | 222 | 55-67 |
| Hazel wood (4F1) · 2 BHK, OTHER, 3 BHK | 23 | 182 | 57-97 |
| LIME WOOD (12H) · 2 BHK, OTHER, 3 BHK | 26 | 206 | 64-88 |
| Laurel (27) · 2 BHK, 3 BHK | 28 | 219 | 55-70 |
| MAHOGANY (3B) · OTHER, 2 BHK, 3 BHK | 26 | 177 | 57-97 |
| MANGOLIA (2A3) · OTHER, 2 BHK, 3 BHK | 26 | 184 | 57-87 |
| MARVELLA (14H) (15A7) (23H) · OTHER, 2 BHK, 3 BHK | 28 | 655 | 55-67 |
| Mangrove (24) · 2 BHK, 3 BHK | 28 | 222 | 55-70 |
| Maverick (T-31 and T-32) · 2 BHK, OTHER | 24 | 488 | 50-68 |
| Mulberry (25) · 2 BHK, 3 BHK | 28 | 222 | 55-70 |
| OAK WOOD (19D) · OTHER, 2 BHK, 3 BHK | 26 | 182 | 57-97 |
| PALM (9C2) · 3 BHK, 4 BHK, 2 BHK, OTHER | 23 | 179 | 57-113 |
| PINE (16E) · 4 BHK, 3 BHK, OTHER | 22 | 171 | 70-113 |
| RED WOOD (8A2) · OTHER, 3 BHK, 2 BHK | 23 | 179 | 53-87 |
| ROSE WOOD (20A) · OTHER, 2 BHK, 3 BHK | 26 | 182 | 57-87 |
| SAL WOOD (1B) · OTHER, 2 BHK, 3 BHK | 26 | 182 | 57-97 |
| SANDAL WOOD (21A) · OTHER, 2 BHK, 3 BHK | 26 | 182 | 57-87 |
| TEAK WOOD (22D) · OTHER, 2 BHK, 3 BHK | 26 | 178 | 57-97 |
| WALNUT (17A4) · OTHER, 3 BHK | 22 | 180 | 70-87 |
| commecial (Mywoods mart) · SHOP | 4 | 140 | 14-72 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots North side – others property, east side – others property, west side – others property, south side – road |
| 2 | Boundary Wall Boundary wall – combination of RCC and MS railing |
| 3 | Road Work All internal roads in concrete paver blocks |
| 4 | Footpaths Footpath in stone, stamp concrete and grass |
| 5 | Water Supply Including Drinking Water Facilities Water treatment plant is provided for portable water |
| 6 | Sewer System Sewer line with required slope and adequate manholes |
| 7 | Drain Adequate catch basin and manholes are provided for surface drain |
| 8 | Parks Green area is provided |
| 9 | Tree Planting Variety of trees and shrubs are planted |
| 10 | Design For Electric Supply Including Street Lighting Sufficient lighting as per service and landscape consultant |
| 11 | Community Buildings Community buildings with various amenities are provided |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP based on MBBR technology |
| 13 | Solid Waste Management And Disposal System Provided as per authority norms |
| 14 | Water Conservation System Rain water harvesting as per authority norms |
| 15 | Energy Management System Including Use of Renewable Energy LED lighting and solar water heaters and provided as per norms |
| 16 | Fire Protection And Fire Safety System Fire sprinklers, smoke detectors, FHC with pumps are provided as per norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Facility office, water treatment plants, STP |
| 18 | Emergency Evacuation Services Fire staircase in each tower/blocks and non tower area is provided |
| 19 | Other Miscellaneous Work Jogging tracks, children play area, tennis courts |
Registered agents
6 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 3 | FINDMYPROPERTY PRIVATE LIMITED | UPRERAAGT11867 |
| 4 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
| 5 | RELIOBRIX CONSULTING PRIVATE LIMITED | UPRERAAGT10049 |
| 6 | Rohit Jain | UPRERAAGT13465 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 18 Oct 2021. 1 of them carries a revalidation.
Sanctioned by Greater Noida Authority · 1,45,738 sqm of land · an approved plan of 29 blocks and 6277 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG(BP)2572/7667 | 19 Oct 2016 | 18 Oct 2021 | — | 30 Jun 2021 | — | |
| PLG(BP)2572/7667 | 19 Oct 2016 | 18 Oct 2021 | 17 Oct 2024 | 30 Jun 2021 | 19 Oct 2016 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Sept 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2021 | 28 Sept 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2021 | 29 Dec 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 3 | 29 Dec 2021 | 28 Sept 2023 | — |
Land & documents
26 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-04, Sector-16C, Greater Noida West | 1,45,737.80 | Plot |
| Registry document · Regn. No. 23759, Book 1, Zild 7591, Page 187-222 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Regn. No. 23759, Book 1, Zild 7591, Page 187-222 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Regn. No. 23759, Book 1, Zild 7591, Page 187-222 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Regn. No. 36, Book 4, Zild 351, Page 109-118 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 4 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 2 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Jul 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 4 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 4 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 4 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 1 Jun 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 1 Jun 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 15 Jan 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 15 Jan 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 15 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 15 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 15 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 15 Jan 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 15 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 15 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 15 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 15 Jan 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 15 Jan 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 15 Jan 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Renewable energy | PARTIAL |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
16 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MAHAGUN (INDIA) PVT. LTD. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4786 |
| PAN | AAACM6572A |
| CIN / TAN | U74899DL1995PTC072752 |
| Name of chairman | MR. AMIT JAIN,C-215, VIVEK VIHAR, DELHI-110095 |
| Registered address | A-19, Sector-63, Noida, Uttar Pradesh-201301 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | MIPL-MYWOODS RERA PROJECT ESCROWBankHDFC BANKBranchVAISHALI, GHAZIABADA/C no.IFSCHDFC0000422 |
What has changed on this record
11 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 374 (Under Registration - 4 ) → 374 (Under Registration - 3 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 373 (Under Registration - 3 ) → 374 (Under Registration - 4 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 373 (Under Registration - 4 ) → 373 (Under Registration - 3 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 372 (Under Registration - 5 ) → 373 (Under Registration - 4 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 372 (Under Registration - 6 ) → 372 (Under Registration - 5 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 370 (Under Registration - 4 ) → 372 (Under Registration - 6 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 369 (Under Registration - 3 ) → 370 (Under Registration - 4 ) changed in Estanzo’s record | 11 Sept 2026 |
| Revised completion date on file | 2021-12-29 → 2023-09-28 changed in Estanzo’s record | 3 Sept 2026 |
| Completion extension no. 3 | extension 3 to 2023-09-28 newly filed with RERA | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 369 (Under Registration - 4 ) → 369 (Under Registration - 3 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 368 (Under Registration - 3 ) → 369 (Under Registration - 4 ) changed in Estanzo’s record | 10 Aug 2026 |
| Revised completion date on file | changed in Estanzo’s record · 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 9 movements on record |
Common questions about MAHAGUN MYWOODS
Is MAHAGUN MYWOODS RERA registered?
Yes. MAHAGUN MYWOODS is registered with UPRERA under registration number UPRERAPRJ3330, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has MAHAGUN MYWOODS been completed?
UPRERA still lists MAHAGUN MYWOODS as Registered, so it is not shown as completed here. A completion certificate dated 4 Apr 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of MAHAGUN MYWOODS?
MAHAGUN (INDIA) PVT. LTD. is the promoter entity that filed MAHAGUN MYWOODS with UPRERA (promoter RERA ID UPRERAPRM4786). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted MAHAGUN MYWOODS more time to complete?
UPRERA's record carries 3 completion extensions for MAHAGUN MYWOODS, the latest running to 28 Sept 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does MAHAGUN MYWOODS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is MAHAGUN MYWOODS located?
MAHAGUN MYWOODS is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in MAHAGUN MYWOODS?
The unit plan filed with UPRERA lists 3 BHK, 2 BHK, OTHER, SHOP and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in MAHAGUN MYWOODS?
The approved unit plan filed with UPRERA runs from 14 to 125 m² of carpet area (about 155 to 1,350 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in MAHAGUN MYWOODS?
The approved unit plan describes 29 blocks and 6,277 units of which 6,137 are homes and 140 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is MAHAGUN MYWOODS?
About 174 units per acre: 6,277 planned units across 36.01 acres (1,45,738 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗