Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3330
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Apr 2011
Original start1 Apr 2011
Project duration150 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressA-19, Sector-63, Noida, Uttar Pradesh-201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Permit revalidated

    PLG(BP)2572/7667

  3. 2 building permits sanctioned

  4. Registered with RERA

  5. 3 completion certificates filed

  6. Extension granted (2)

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

  11. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2017
Original completion30 Jun 2021
Revised completion28 Sept 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary4 Apr 2019
Registration fee₹7,34,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors6,277 · 29 · 32 (units from plan)
Homes · commercial units6,137 · 140 (shops and offices filed in the same plan)
  • 2 BHK2,026 32%
  • 3 BHK2,006 32%
  • OTHER1,875 30%
  • 4 BHK230 4%
  • SHOP140 2%
ConfigurationUnitsCarpet area
3 BHK2,00667-108
2 BHK2,02650-97
OTHER1,87553-74
SHOP14014-72
4 BHK230113-125
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
ALPINE (7C1) · OTHER, 3 BHK, 2 BHK2317953-97
ASPEN (11A6) · OTHER, 3 BHK, 4 BHK2620374-125
Axle wood (30) · OTHER, 3 BHK, 2 BHK2822655-67
CAMPHOR (5A5) · 2 BHK, OTHER2313653-70
CHESTNUT (10H) · OTHER, 2 BHK, 3 BHK2620364-108
Cinnamon(26) · 2 BHK, 3 BHK2822255-70
Coral wood (28) · OTHER, 3 BHK, 2 BHK2822055-67
DURIAN (18E) · 4 BHK, 3 BHK, OTHER2217270-113
EBONY (6F2) · 2 BHK, OTHER, 3 BHK, 4 BHK2318453-113
Fiddle wood (29) · 3 BHK, 2 BHK, OTHER2822255-67
Hazel wood (4F1) · 2 BHK, OTHER, 3 BHK2318257-97
LIME WOOD (12H) · 2 BHK, OTHER, 3 BHK2620664-88
Laurel (27) · 2 BHK, 3 BHK2821955-70
MAHOGANY (3B) · OTHER, 2 BHK, 3 BHK2617757-97
MANGOLIA (2A3) · OTHER, 2 BHK, 3 BHK2618457-87
MARVELLA (14H) (15A7) (23H) · OTHER, 2 BHK, 3 BHK2865555-67
Mangrove (24) · 2 BHK, 3 BHK2822255-70
Maverick (T-31 and T-32) · 2 BHK, OTHER2448850-68
Mulberry (25) · 2 BHK, 3 BHK2822255-70
OAK WOOD (19D) · OTHER, 2 BHK, 3 BHK2618257-97
PALM (9C2) · 3 BHK, 4 BHK, 2 BHK, OTHER2317957-113
PINE (16E) · 4 BHK, 3 BHK, OTHER2217170-113
RED WOOD (8A2) · OTHER, 3 BHK, 2 BHK2317953-87
ROSE WOOD (20A) · OTHER, 2 BHK, 3 BHK2618257-87
SAL WOOD (1B) · OTHER, 2 BHK, 3 BHK2618257-97
SANDAL WOOD (21A) · OTHER, 2 BHK, 3 BHK2618257-87
TEAK WOOD (22D) · OTHER, 2 BHK, 3 BHK2617857-97
WALNUT (17A4) · OTHER, 3 BHK2218070-87
commecial (Mywoods mart) · SHOP414014-72
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 274.58 m² for a SHOP, far outside the rest of that type, so the ranges above leave it out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
GIAN.P.MATHUR
License CA/80/5769
C55 EAST OF KAILASH, NEW DELHI-110065
Engineer
Optimum Design Pvt. Ltd. & Chordia Tech.
OPTIMUM DESIGN-B-24, Sector 67, Noida-201301 & I-1738, LGF, CR Park, N.delhi-19
Contractor
B.L. GUPTA Construction Company
IIA, 21, FEROZE GANDHI ROAD, LAJPAT NAGAR, NEW DELHI-110024
Sr.Development work declared to RERA
1Demarcation of Plots
North side – others property, east side – others property, west side – others property, south side – road
2Boundary Wall
Boundary wall – combination of RCC and MS railing
3Road Work
All internal roads in concrete paver blocks
4Footpaths
Footpath in stone, stamp concrete and grass
5Water Supply Including Drinking Water Facilities
Water treatment plant is provided for portable water
6Sewer System
Sewer line with required slope and adequate manholes
7Drain
Adequate catch basin and manholes are provided for surface drain
8Parks
Green area is provided
9Tree Planting
Variety of trees and shrubs are planted
10Design For Electric Supply Including Street Lighting
Sufficient lighting as per service and landscape consultant
11Community Buildings
Community buildings with various amenities are provided
12Treatment and Disposal System of Sewage and Sullage water
STP based on MBBR technology
13Solid Waste Management And Disposal System
Provided as per authority norms
14Water Conservation System
Rain water harvesting as per authority norms
15Energy Management System Including Use of Renewable Energy
LED lighting and solar water heaters and provided as per norms
16Fire Protection And Fire Safety System
Fire sprinklers, smoke detectors, FHC with pumps are provided as per norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Facility office, water treatment plants, STP
18Emergency Evacuation Services
Fire staircase in each tower/blocks and non tower area is provided
19Other Miscellaneous Work
Jogging tracks, children play area, tennis courts
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

6 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
4INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
5RELIOBRIX CONSULTING PRIVATE LIMITEDUPRERAAGT10049
6Rohit JainUPRERAAGT13465
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 18 Oct 2021. 1 of them carries a revalidation.

Sanctioned by Greater Noida Authority · 1,45,738 sqm of land · an approved plan of 29 blocks and 6277 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG(BP)2572/766719 Oct 201618 Oct 2021—30 Jun 2021—
PLG(BP)2572/766719 Oct 201618 Oct 202117 Oct 202430 Jun 202119 Oct 2016
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 28 Sept 2023.

#Granted fromExtended uptoNote
130 Jun 202128 Sept 2023Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202129 Dec 2021Six months extension in view of force majeure caused by covid-19 pandemic
329 Dec 202128 Sept 2023—

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-04, Sector-16C, Greater Noida West1,45,737.80Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Regn. No. 23759, Book 1, Zild 7591, Page 187-222
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Regn. No. 23759, Book 1, Zild 7591, Page 187-222
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Regn. No. 23759, Book 1, Zild 7591, Page 187-222
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Regn. No. 36, Book 4, Zild 351, Page 109-118
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New4 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New4 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New4 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Jun 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New1 Jun 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old15 Jan 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old15 Jan 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old15 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old15 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old15 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old15 Jan 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Jan 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old15 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Renewable energyPARTIAL

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMAHAGUN (INDIA) PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM4786
PANAAACM6572A
CIN / TANU74899DL1995PTC072752
Name of chairmanMR. AMIT JAIN,C-215, VIVEK VIHAR, DELHI-110095
Registered addressA-19, Sector-63, Noida, Uttar Pradesh-201301
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
MIPL-MYWOODS RERA PROJECT ESCROWBankHDFC BANKBranchVAISHALI, GHAZIABADA/C no.IFSCHDFC0000422
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

11 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)374 (Under Registration - 4 ) → 374 (Under Registration - 3 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)373 (Under Registration - 3 ) → 374 (Under Registration - 4 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)373 (Under Registration - 4 ) → 373 (Under Registration - 3 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)372 (Under Registration - 5 ) → 373 (Under Registration - 4 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)372 (Under Registration - 6 ) → 372 (Under Registration - 5 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)370 (Under Registration - 4 ) → 372 (Under Registration - 6 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)369 (Under Registration - 3 ) → 370 (Under Registration - 4 )
changed in Estanzo’s record
11 Sept 2026
Revised completion date on file2021-12-29 → 2023-09-28
changed in Estanzo’s record
3 Sept 2026
Completion extension
no. 3
extension 3 to 2023-09-28
newly filed with RERA
3 Sept 2026
Promoter’s complaints tally (all their projects)369 (Under Registration - 4 ) → 369 (Under Registration - 3 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)368 (Under Registration - 3 ) → 369 (Under Registration - 4 )
changed in Estanzo’s record
10 Aug 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 3 Sept 2026
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 9 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about MAHAGUN MYWOODS

Is MAHAGUN MYWOODS RERA registered?

Yes. MAHAGUN MYWOODS is registered with UPRERA under registration number UPRERAPRJ3330, registered on 28 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has MAHAGUN MYWOODS been completed?

UPRERA still lists MAHAGUN MYWOODS as Registered, so it is not shown as completed here. A completion certificate dated 4 Apr 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of MAHAGUN MYWOODS?

MAHAGUN (INDIA) PVT. LTD. is the promoter entity that filed MAHAGUN MYWOODS with UPRERA (promoter RERA ID UPRERAPRM4786). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted MAHAGUN MYWOODS more time to complete?

UPRERA's record carries 3 completion extensions for MAHAGUN MYWOODS, the latest running to 28 Sept 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does MAHAGUN MYWOODS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MAHAGUN MYWOODS located?

MAHAGUN MYWOODS is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in MAHAGUN MYWOODS?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, OTHER, SHOP and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MAHAGUN MYWOODS?

The approved unit plan filed with UPRERA runs from 14 to 125 m² of carpet area (about 155 to 1,350 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MAHAGUN MYWOODS?

The approved unit plan describes 29 blocks and 6,277 units of which 6,137 are homes and 140 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MAHAGUN MYWOODS?

About 174 units per acre: 6,277 planned units across 36.01 acres (1,45,738 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗