TRG THE MALL is a RERA-registered commercial project by TRISOL RED DEVELOPERS LLP in VILLAGE DUNDAHERA, GHAZIABAD, Ghaziabad (RERA ID UPRERAPRJ378928). Registered with a completion deadline of 31 Jan 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ378928 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 May 2025 |
| Project duration | 57 months |
| Address | KHASRA NO. 77 MI, VILLAGE DUNDAHERA, GHAZIABAD, Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Limited Liability Partnership (LLP) |
| Applicant address | B-92, SECTOR-63, NOIDA 201301 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
COMMERCIAL BUILDING/08522/GDA/BP/24-25/0100/29012025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 May 2025 |
| Original completion | 31 Jan 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹74,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP398 63%
- OTHER233 37%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 398 | 3-136 |
| OTHER | 233 | 2-9 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| TRG THE MALL · SHOP, OTHER | 4 | 631 | 2-136 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots SOUTH SIDE- 7.12 MTR., 6.23 , 7.96 , 1.86, 12.18, 10.77, 11.82, 10.68 MTR.
WEST SIDE - 131.00, 13.68 MTR.
NORTH SIDE - 6.04, 50.09 MTR.
EAST SIDE - 15.90, 1.29, 29.39, 48.82, 18.63 MTR. |
| 2 | Boundary Wall APPROXIMATLY 200 MT. LONG BOUNDARY WALL TO BE CONSTRUCTED IN RCC/BRICK WORK AS PER STRUCTURE DESIGN. |
| 3 | Road Work INTERNAL ROAD TO BE DEVELOPED IN BITUMEN/INTERLOCKING BLOCKS/TRIMIX AS PER SPECIFICATION. TOTAL ROAD AREA WILL BE 1300 SQM. |
| 4 | Footpaths FOOTPATHS TO BE CONSTRUCTED FOR PEDASTRAINS AS PER NECESSARY GUIDELINES. APPROX. AREA OF FOOTPATH WILL BE 260 SQM. |
| 5 | Water Supply Including Drinking Water Facilities NECESSARY WATER SUPPLY FACILITY SHALL BE PROVIDED AS PER CALCUALATION BASD UPON THE NBC AND POLLUTION NOC OBTAINED FROM POLLUTION CONTROL BOARD.H OWEVER OVERHEAD WATER TANKS AND UNDER GROUND WATER TANKS SHALL BE DESIGNED ON THE PER PERSON WATER REQUIREMENT. i.e. 45 LTR PER PERSON. (DONMESTIC +FLUSHING) |
| 6 | Sewer System SEWERAGE SYSTEM SHALL BE PROVIDED BASED UPON THE CALCULATION OF DISCHARGE OF SOIL AND WASTE PRODUCT GENERATION SHALL BE TREATED IN STP AND SURPLUS TO BE DISCHARGED IN THE MUNCIPAL SEWER. AVG .DISCHARGE 15KLD. |
| 7 | Drain DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF AVERAGE RAIN FALL. i.e. 45 mm/hr. |
| 8 | Parks 10 PERCENT GREEN AREA TO BE PROVIDED WITH OUTDOOR AMENITIES OF PLAY AREA. PROPOSED AREA FOR GRREN IS 700 SQM. |
| 9 | Tree Planting TREE PLANTATION WITH EVERGREEN AND SEASONAL CATEGORY ALONG WITH THE BOUNDARY WALL AND IN THE LANDSCAPE AREA TO BE DEVELOPED. |
| 10 | Design For Electric Supply Including Street Lighting ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION TOTAL LOAD IS EVALUATED APPROXIMATELY 2000 KVA., provided with TWO TRANSFOREMERS OF 1000 KVA EACH AND 2 DG OF 750KVA EACH. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP SHALL BE PROVIDED OF 50 KL IS PROPOSED HOW EVER SHALL BE DESIGNED ACCORDING TO THE REQUIREMENT FURTHER . |
| 13 | Solid Waste Management And Disposal System ORGANIC WASTE CONVERTER SHALL BE PROVIDED IN THE BUILDING WITH TRASH SEGREGATION MECHANISM . AND FURTHER DECOMPOSE THIS INTO MICRO PARTICLE , MAY BE UTILIZED FOR FERTILIZERS. |
| 14 | Water Conservation System RAIN WATER HARVESTING SYSTEM . 2 NOS. OF RECHARGE WELL ARE PROVIDED IN THE DEVELOPMENT SCHEME. |
| 15 | Energy Management System Including Use of Renewable Energy VFD IN PUMP ROOM TO SAVE THE ENERGY BASED UPON AUTO STRAT STOP FUNCTION TO REDUCE THE OVERALL POWER CONSUMPTION. SOLAR CELLS ARE PROPOSED ON THE ROOF TOP TO PRODUCE THE ELECTRICITY FOR WATER HEATING AND OTHER NECCESSARY UTILIZATIONS. |
| 16 | Fire Protection And Fire Safety System FIRE PROTECTION SYSTEM IS PROPOSED IN THE BUILDING WHICH COMPRISES UNDERGROUND WATER TANK WITH PUMP ROOM, FIRE SHAFT, HOSEREEL AND OTHER FIRE FIGHTING EQUIPMENTS. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services SINCE PROPOSED BUILDING IS COMMERCIAL PROJECT, ALL THE BASIC PUBLIC AMENITIES SHALL BE PROVIDED IN THE BUILDING SUCH AS FIRST AID FACILITY, REST ROOMS, LOBBIES ETC. |
| 18 | Emergency Evacuation Services ACCORDING TO THE NBC , EMERGENCY EVACUTION ROUTE ARE PLANNED IN THE BUILDING . ALSO ADEQUATE NUMBER OF STAIRCASE ARE PROVIDED KEEPING EMERGENCY SITUATION IN MIND. |
| 19 | Other Miscellaneous Work NA |
Registered agents
4 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Anmol kumar | UPRERAAGT25465 |
| 2 | PROPZONE INFRATECH | UPRERAAGT10285 |
| 3 | Trisol RED Infraventures Pvt Ltd | UPRERAAGT11579 |
| 4 | VIKAS AGARWAL | UPRERAAGT11281 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Feb 2030.
Sanctioned by Ghaziabad Development Authority · 6,378 sqm of land · an approved plan of 1 block and 631 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| COMMERCIAL BUILDING/08522/GDA/BP/24-25/0100/29012025 | 10 Feb 2025 | 9 Feb 2030 | 9 Feb 2033 | 31 Jan 2030 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 77 mi | 6378 | Khasra |
| Registry document · 3047 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Imposed Khasra An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 6011 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 31 Mar 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 18 Mar 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Apr 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 May 2025 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 18 Mar 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 26 Apr 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 26 Apr 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 26 Apr 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 18 Mar 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Apr 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Mar 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Mar 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Mar 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 25 Apr 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 18 Mar 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 7.83% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 6.08% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 8.61% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 12.81% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | TRISOL RED DEVELOPERS LLP |
| Role | Promoter · current |
| RERA ID | UPRERAPRM350422 |
| PAN | AAUFT5450F |
| CIN / TAN | MRTT05157F |
| Registered address | B-92, SECTOR-63, NOIDA 201301 |
| RERA contact | |
| Registered since | 2025 |
| Legal name | ASHOK KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-63, SECTOR-9, VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | CHATARPAL |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-66, SECTOR-09, VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | DEEWAN CHAND |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-63, SECTOR-9, NEAR VIJAY NAGAR POLICE STATION, VIJAY NAGAR, GHAZIABAD-201001 |
| RERA contact |
| Legal name | NETRAM |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 210, GALI NO-8, AMBEDKAR NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | RAJKALI |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 65, SECTOR-9, VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | RAVINDER KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-65, NEW VIJAY NAGAR, SECTOR-9, GHAZIABAD 201009 |
| RERA contact |
| Legal name | SOHAN PAL SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-64, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | SURAJ PRAKASH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-84, SECTOR-9, VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | TEK CHAND |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-62, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | VIRENDER KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-65, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | YASHVIR SINGH |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-84, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009 |
| RERA contact |
| Legal name | DEEPAK KUMAR |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | H-65, NEW VIJAY NAGAR, SECTOR-9, GHAZIABAD |
| RERA contact |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Trisol Red Developers LLP Collection account for TRG THE MALLBankICICI BANKBranchINDIRAPURAMBranch addressPLOT NO. -03, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPUAMBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718Branch emailkumar.mithlesh@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Trisol Red Developers LLP Separate Account for TRG THE MALLBankICICI BANKBranchINDIRAPURAM GHAZIABADBranch addressPLOT NO. 3, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPURAMBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC00007148 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Trisol Red Developers LLP Transaction Account for TRG THE MALLBankICICI BANKBranchINDIRAPURAM, GHAZIABADBranch addressPLOT NO. 03, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPURAM, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about TRG THE MALL
Is TRG THE MALL RERA registered?
Yes. TRG THE MALL is registered with UPRERA under registration number UPRERAPRJ378928, registered on 26 May 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for TRG THE MALL?
The completion date filed with UPRERA is 31 Jan 2030. No completion certificate is on record yet.
Who is the builder of TRG THE MALL?
TRISOL RED DEVELOPERS LLP is the promoter entity that filed TRG THE MALL with UPRERA (promoter RERA ID UPRERAPRM350422). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does TRG THE MALL have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is TRG THE MALL located?
TRG THE MALL is registered in VILLAGE DUNDAHERA, GHAZIABAD, Ghaziabad, as filed with UPRERA.
What configurations are available in TRG THE MALL?
The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in TRG THE MALL?
The approved unit plan filed with UPRERA runs from 2 to 136 m² of carpet area (about 17 to 1,461 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in TRG THE MALL?
The approved unit plan describes 1 block and 631 units of which 233 are homes and 398 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is TRG THE MALL?
About 400 units per acre: 631 planned units across 1.58 acres (6,378 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗