TRG THE MALL

UPRERARegistered

TRG THE MALL is a RERA-registered commercial project by TRISOL RED DEVELOPERS LLP in VILLAGE DUNDAHERA, GHAZIABAD, Ghaziabad (RERA ID UPRERAPRJ378928). Registered with a completion deadline of 31 Jan 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'25
7.83%Q3'25
6.08%Q4'25
8.61%Q1'26
12.81%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ378928
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 May 2025
Project duration57 months
AddressKHASRA NO. 77 MI, VILLAGE DUNDAHERA, GHAZIABAD, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeLimited Liability Partnership (LLP)
Applicant addressB-92, SECTOR-63, NOIDA 201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    COMMERCIAL BUILDING/08522/GDA/BP/24-25/0100/29012025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 May 2025
Original completion31 Jan 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹74,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors631 · 1 · 4 (units from plan)
Homes · commercial units233 · 398 (shops and offices filed in the same plan)
  • SHOP398 63%
  • OTHER233 37%
ConfigurationUnitsCarpet area
SHOP3983-136
OTHER2332-9
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TRG THE MALL · SHOP, OTHER46312-136
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 55.52 m² for a OTHER, 46.14 m² for a OTHER, 66.61 m² for a OTHER, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
RAHUL GUPTA
License CA/2010/48921
D-1, SECTOR-07, NOIDA
Engineer
YG CONSULTING ENGINEERS
INDIRAPURAM, GHAZIABAD
Contractor
GAURAV HOMES
D-1, SECTOR-07, NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
SOUTH SIDE- 7.12 MTR., 6.23 , 7.96 , 1.86, 12.18, 10.77, 11.82, 10.68 MTR. WEST SIDE - 131.00, 13.68 MTR. NORTH SIDE - 6.04, 50.09 MTR. EAST SIDE - 15.90, 1.29, 29.39, 48.82, 18.63 MTR.
2Boundary Wall
APPROXIMATLY 200 MT. LONG BOUNDARY WALL TO BE CONSTRUCTED IN RCC/BRICK WORK AS PER STRUCTURE DESIGN.
3Road Work
INTERNAL ROAD TO BE DEVELOPED IN BITUMEN/INTERLOCKING BLOCKS/TRIMIX AS PER SPECIFICATION. TOTAL ROAD AREA WILL BE 1300 SQM.
4Footpaths
FOOTPATHS TO BE CONSTRUCTED FOR PEDASTRAINS AS PER NECESSARY GUIDELINES. APPROX. AREA OF FOOTPATH WILL BE 260 SQM.
5Water Supply Including Drinking Water Facilities
NECESSARY WATER SUPPLY FACILITY SHALL BE PROVIDED AS PER CALCUALATION BASD UPON THE NBC AND POLLUTION NOC OBTAINED FROM POLLUTION CONTROL BOARD.H OWEVER OVERHEAD WATER TANKS AND UNDER GROUND WATER TANKS SHALL BE DESIGNED ON THE PER PERSON WATER REQUIREMENT. i.e. 45 LTR PER PERSON. (DONMESTIC +FLUSHING)
6Sewer System
SEWERAGE SYSTEM SHALL BE PROVIDED BASED UPON THE CALCULATION OF DISCHARGE OF SOIL AND WASTE PRODUCT GENERATION SHALL BE TREATED IN STP AND SURPLUS TO BE DISCHARGED IN THE MUNCIPAL SEWER. AVG .DISCHARGE 15KLD.
7Drain
DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF AVERAGE RAIN FALL. i.e. 45 mm/hr.
8Parks
10 PERCENT GREEN AREA TO BE PROVIDED WITH OUTDOOR AMENITIES OF PLAY AREA. PROPOSED AREA FOR GRREN IS 700 SQM.
9Tree Planting
TREE PLANTATION WITH EVERGREEN AND SEASONAL CATEGORY ALONG WITH THE BOUNDARY WALL AND IN THE LANDSCAPE AREA TO BE DEVELOPED.
10Design For Electric Supply Including Street Lighting
ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION TOTAL LOAD IS EVALUATED APPROXIMATELY 2000 KVA., provided with TWO TRANSFOREMERS OF 1000 KVA EACH AND 2 DG OF 750KVA EACH.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
STP SHALL BE PROVIDED OF 50 KL IS PROPOSED HOW EVER SHALL BE DESIGNED ACCORDING TO THE REQUIREMENT FURTHER .
13Solid Waste Management And Disposal System
ORGANIC WASTE CONVERTER SHALL BE PROVIDED IN THE BUILDING WITH TRASH SEGREGATION MECHANISM . AND FURTHER DECOMPOSE THIS INTO MICRO PARTICLE , MAY BE UTILIZED FOR FERTILIZERS.
14Water Conservation System
RAIN WATER HARVESTING SYSTEM . 2 NOS. OF RECHARGE WELL ARE PROVIDED IN THE DEVELOPMENT SCHEME.
15Energy Management System Including Use of Renewable Energy
VFD IN PUMP ROOM TO SAVE THE ENERGY BASED UPON AUTO STRAT STOP FUNCTION TO REDUCE THE OVERALL POWER CONSUMPTION. SOLAR CELLS ARE PROPOSED ON THE ROOF TOP TO PRODUCE THE ELECTRICITY FOR WATER HEATING AND OTHER NECCESSARY UTILIZATIONS.
16Fire Protection And Fire Safety System
FIRE PROTECTION SYSTEM IS PROPOSED IN THE BUILDING WHICH COMPRISES UNDERGROUND WATER TANK WITH PUMP ROOM, FIRE SHAFT, HOSEREEL AND OTHER FIRE FIGHTING EQUIPMENTS.
17Social Infrastructure And Other Public Amenities Including Public Health Services
SINCE PROPOSED BUILDING IS COMMERCIAL PROJECT, ALL THE BASIC PUBLIC AMENITIES SHALL BE PROVIDED IN THE BUILDING SUCH AS FIRST AID FACILITY, REST ROOMS, LOBBIES ETC.
18Emergency Evacuation Services
ACCORDING TO THE NBC , EMERGENCY EVACUTION ROUTE ARE PLANNED IN THE BUILDING . ALSO ADEQUATE NUMBER OF STAIRCASE ARE PROVIDED KEEPING EMERGENCY SITUATION IN MIND.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Anmol kumarUPRERAAGT25465
2PROPZONE INFRATECHUPRERAAGT10285
3Trisol RED Infraventures Pvt LtdUPRERAAGT11579
4VIKAS AGARWALUPRERAAGT11281
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Feb 2030.

Sanctioned by Ghaziabad Development Authority · 6,378 sqm of land · an approved plan of 1 block and 631 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
COMMERCIAL BUILDING/08522/GDA/BP/24-25/0100/2901202510 Feb 20259 Feb 20309 Feb 203331 Jan 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
77 mi6378Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 3047
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Imposed Khasra
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 6011
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Mar 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Mar 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Apr 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 May 2025 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New18 Mar 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Apr 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Apr 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Apr 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New18 Mar 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Apr 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Mar 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Mar 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Mar 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New25 Apr 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New18 Mar 2025 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2025-Q1 to 2026-Q1.

QuarterConstructionCertificates
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q27.83%CA ↗ · Arch ↗ · Eng ↗
2025-Q36.08%CA ↗ · Arch ↗ · Eng ↗
2025-Q48.61%CA ↗ · Arch ↗ · Eng ↗
2026-Q112.81%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTRISOL RED DEVELOPERS LLP
RolePromoter · current
RERA IDUPRERAPRM350422
PANAAUFT5450F
CIN / TANMRTT05157F
Registered addressB-92, SECTOR-63, NOIDA 201301
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameASHOK KUMAR
RoleCo-promoter
Applicant typeIndividual
AddressH-63, SECTOR-9, VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameCHATARPAL
RoleCo-promoter
Applicant typeIndividual
AddressH-66, SECTOR-09, VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameDEEWAN CHAND
RoleCo-promoter
Applicant typeIndividual
AddressH-63, SECTOR-9, NEAR VIJAY NAGAR POLICE STATION, VIJAY NAGAR, GHAZIABAD-201001
RERA contact
Legal nameNETRAM
RoleCo-promoter
Applicant typeIndividual
Address210, GALI NO-8, AMBEDKAR NAGAR, GHAZIABAD 201009
RERA contact
Legal nameRAJKALI
RoleCo-promoter
Applicant typeIndividual
Address65, SECTOR-9, VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameRAVINDER KUMAR
RoleCo-promoter
Applicant typeIndividual
AddressH-65, NEW VIJAY NAGAR, SECTOR-9, GHAZIABAD 201009
RERA contact
Legal nameSOHAN PAL SINGH
RoleCo-promoter
Applicant typeIndividual
AddressH-64, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameSURAJ PRAKASH
RoleCo-promoter
Applicant typeIndividual
AddressH-84, SECTOR-9, VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameTEK CHAND
RoleCo-promoter
Applicant typeIndividual
AddressH-62, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameVIRENDER KUMAR
RoleCo-promoter
Applicant typeIndividual
AddressH-65, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameYASHVIR SINGH
RoleCo-promoter
Applicant typeIndividual
AddressH-84, SECTOR-9, NEW VIJAY NAGAR, GHAZIABAD 201009
RERA contact
Legal nameDEEPAK KUMAR
RoleCo-promoter
Applicant typeIndividual
AddressH-65, NEW VIJAY NAGAR, SECTOR-9, GHAZIABAD
RERA contact

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Trisol Red Developers LLP Collection account for TRG THE MALLBankICICI BANKBranchINDIRAPURAMBranch addressPLOT NO. -03, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPUAMBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718Branch emailkumar.mithlesh@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Trisol Red Developers LLP Separate Account for TRG THE MALLBankICICI BANKBranchINDIRAPURAM GHAZIABADBranch addressPLOT NO. 3, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPURAMBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC00007148
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Trisol Red Developers LLP Transaction Account for TRG THE MALLBankICICI BANKBranchINDIRAPURAM, GHAZIABADBranch addressPLOT NO. 03, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPURAM, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0000718
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about TRG THE MALL

Is TRG THE MALL RERA registered?

Yes. TRG THE MALL is registered with UPRERA under registration number UPRERAPRJ378928, registered on 26 May 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for TRG THE MALL?

The completion date filed with UPRERA is 31 Jan 2030. No completion certificate is on record yet.

Who is the builder of TRG THE MALL?

TRISOL RED DEVELOPERS LLP is the promoter entity that filed TRG THE MALL with UPRERA (promoter RERA ID UPRERAPRM350422). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does TRG THE MALL have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is TRG THE MALL located?

TRG THE MALL is registered in VILLAGE DUNDAHERA, GHAZIABAD, Ghaziabad, as filed with UPRERA.

What configurations are available in TRG THE MALL?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in TRG THE MALL?

The approved unit plan filed with UPRERA runs from 2 to 136 m² of carpet area (about 17 to 1,461 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in TRG THE MALL?

The approved unit plan describes 1 block and 631 units of which 233 are homes and 398 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is TRG THE MALL?

About 400 units per acre: 631 planned units across 1.58 acres (6,378 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗