MANGAL VIHAR HOUSING SCHEME

UPRERARegistered

MANGAL VIHAR HOUSING SCHEME is a RERA-registered residential project by Prayagraj Development Authority in Prayagraj (RERA ID UPRERAPRJ12275). Registered with a completion deadline of 30 Jun 2018.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ12275
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAllahabad Development Authority
Proposed start1 Jan 2016
Original start1 Aug 2015
Project duration30 months
AddressAllahabad **, Prayagraj
TehsilAllahabad **
Applicant typeCompetent authority
Applicant addressIndira Bhawan, Civil Lines, Prayagraj-211001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    101/ AA/ VI PRA / 2015-16

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Oct 2017
Original completion30 Jun 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary10 May 2019
Registration fee₹34,000
Sanctioning authorityAllahabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors272 · 2 · 1 (units from plan)
ConfigurationUnitsCarpet area
1 BHK27224-25
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
EWS BLOCK · 1 BHK19624
LIG BLOCK A & C · 1 BHK117625
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AKHILESHWAR SINGH
License CA/94/16740
SHOP NO. 49/G-7, LOTUS APARTMENT, TASKAND MARG, ALLAHABAD
Engineer
AKHILESHWAR KUMAR SINGH
D-27 INDIRA NAGAR, LUCKNOW
Contractor
M/S BABA BUILDERS
218D, JAYANTIPUR, SULEM SARAI, ALLAHABAD
Sr.Development work declared to RERA
1Demarcation of Plots
Complete
2Boundary Wall
Complete
3Road Work
Complete
4Footpaths
No
5Water Supply Including Drinking Water Facilities
Complete
6Sewer System
Complete
7Drain
Complete
8Parks
Complete
9Tree Planting
Complete
10Design For Electric Supply Including Street Lighting
Complete
11Community Buildings
No
12Treatment and Disposal System of Sewage and Sullage water
No
13Solid Waste Management And Disposal System
No
14Water Conservation System
No
15Energy Management System Including Use of Renewable Energy
No
16Fire Protection And Fire Safety System
Complete
17Social Infrastructure And Other Public Amenities Including Public Health Services
No
18Emergency Evacuation Services
No
19Other Miscellaneous Work
Complete
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jun 2018.

Sanctioned by Allahabad Development Authority · 5,773 sqm of land · an approved plan of 2 blocks and 272 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
101/ AA/ VI PRA / 2015-1615 Nov 201530 Jun 201830 Jun 201830 Jun 2018
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗

Land & documents

2 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
829, 835, 843, 853, AND 8545773.07—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 20 Aug 1990.

Registry no.DateTypeArea
2332/11-5-90-LA-9020 Aug 1990self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 8548/9-A-5-01-12 LA -90
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New2 Apr 2019 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterFROM OVERHED WATERTANK FILLED BY BOREWALL
Fire safety (as filed with RERA)PROVIDED AS PER NBC 2005
Other facilitiesOPEN AREA AND PARK

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePrayagraj Development Authority
RolePromoter · current
RERA IDUPRERAPRM11999
PANAAALA0144P
CIN / TANLKNA05622B
Registered addressIndira Bhawan, Civil Lines, Prayagraj-211001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
SECRETARY ALLAHABAD DEVELOPMENT AUTHORITYBankHDFC BANKBranchCIVIL LINES, ALLAHABADA/C no.IFSCHDFC0000226
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about MANGAL VIHAR HOUSING SCHEME

Is MANGAL VIHAR HOUSING SCHEME RERA registered?

Yes. MANGAL VIHAR HOUSING SCHEME is registered with UPRERA under registration number UPRERAPRJ12275, registered on 3 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has MANGAL VIHAR HOUSING SCHEME been completed?

UPRERA still lists MANGAL VIHAR HOUSING SCHEME as Registered, so it is not shown as completed here. A completion certificate dated 10 May 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of MANGAL VIHAR HOUSING SCHEME?

Prayagraj Development Authority is the promoter entity that filed MANGAL VIHAR HOUSING SCHEME with UPRERA (promoter RERA ID UPRERAPRM11999). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does MANGAL VIHAR HOUSING SCHEME have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MANGAL VIHAR HOUSING SCHEME located?

MANGAL VIHAR HOUSING SCHEME is registered in Prayagraj, as filed with UPRERA.

What configurations are available in MANGAL VIHAR HOUSING SCHEME?

The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MANGAL VIHAR HOUSING SCHEME?

The approved unit plan filed with UPRERA runs from 24 to 25 m² of carpet area (about 259 to 267 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MANGAL VIHAR HOUSING SCHEME?

The approved unit plan describes 2 blocks and 272 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MANGAL VIHAR HOUSING SCHEME?

About 191 units per acre: 272 planned units across 1.43 acres (5,773 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗