Mayfair Villas is a RERA-registered residential project by Mayfair Developers in Lucknow (RERA ID UPRERAPRJ280431). Registered with a completion deadline of 26 Jul 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ280431 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 28 Jul 2021 |
| Project duration | 48 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Partnership Firm |
| Applicant address | Khasra No. 307, Village Anaura, Chinhat, Faizabad Road, Lucknow 226028 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
361
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Sept 2021 |
| Original completion | 26 Jul 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,38,000 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots A plot of total land 14150 sq.mtr. is situated at Anaura, Chinhat, Lucknow. The plot for the villas are identified and demarcated. |
| 2 | Boundary Wall A boundary wall of 8 ft. height on ground is built surrounding whole land made of bricks and RCC column with both side plaster. |
| 3 | Road Work A CC road is proposed approaching to each villa. |
| 4 | Footpaths 1 meter wide footpaths will be constructed through out both side of road by paver blocks. |
| 5 | Water Supply Including Drinking Water Facilities Water supply will be provided by submersible boring in each Villa separately including drinking water. |
| 6 | Sewer System The Septic tank will be provided in each villa separately. |
| 7 | Drain Drain line will be prepared alongside the road |
| 8 | Parks 3 Nos. park will be developed as shown in the map with iron grills, stone boundary, grass and greenery plants etc. with sculpture and land scaping |
| 9 | Tree Planting The Trees will be implanted through out the road for eco green purpose. |
| 10 | Design For Electric Supply Including Street Lighting Separate electric line will be erected for all villas for their separate electric connection through transformer, electric panel etc. The electric pole will be erected for street light through out the road. |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Not Applicable |
| 13 | Solid Waste Management And Disposal System Not Applicable |
| 14 | Water Conservation System Rain Water Harvesting as per approved permit |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services As per Approved Map |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 26 Jul 2023.
Sanctioned by Any Other Competent Authority · 14,150 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 361 | 27 Jul 2021 | 26 Jul 2023 | 26 Jul 2025 | 26 Jul 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 306 | 2037 | Khasra |
| 306 | 2413 | Khasra |
| 307 | 2110 | Khasra |
| 313 | 7590 | Khasra |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 3753 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1769 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9850 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4170 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 9 Sept 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 9 Sept 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 21 Aug 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Aug 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Aug 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Aug 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 9 Sept 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 22 Sept 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 9 Sept 2021 ↗ |
Quarterly progress reports
17 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
17 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Mayfair Developers |
| Role | Promoter · current |
| RERA ID | UPRERAPRM148984 |
| PAN | ABRFM1524H |
| CIN / TAN | LKNM12034B |
| Registered address | Khasra No. 307, Village Anaura, Chinhat, Faizabad Road, Lucknow 226028 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Mayfair Developers- Collection Account for Mayfair VillasBankICICI BANK LTDBranchCHINHAT BRANCHBranch address633/008-CC, DEVA ROAD, LUCKNOW-226028Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0003530 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Mayfair DevelopersBankHDFC BankBranchVikrant KhandBranch addressCP-06, Vikrant Khand, Gomti Nagar, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0003082 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Mayfair Developers- RERA Transaction Account for Mayfair VillasBankICICI BANK LTDBranchCHINHAT BRANCHBranch address633/008-CC, DEVA ROAD, LUCKNOW-226028Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0003530 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Mayfair Villas
Is Mayfair Villas RERA registered?
Yes. Mayfair Villas is registered with UPRERA under registration number UPRERAPRJ280431, registered on 25 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Mayfair Villas?
The completion date filed with UPRERA is 26 Jul 2025. No completion certificate is on record yet.
Who is the builder of Mayfair Villas?
Mayfair Developers is the promoter entity that filed Mayfair Villas with UPRERA (promoter RERA ID UPRERAPRM148984). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Mayfair Villas have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Mayfair Villas located?
Mayfair Villas is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗