Migsun Nehru Place 1

UPRERARegistered

Migsun Nehru Place 1 is a RERA-registered commercial project by ANSAL IT CITY & PARKS LIMITED in TZ 06, Gautam Budh Nagar (RERA ID UPRERAPRJ770923). Registered with a completion deadline of 10 Oct 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
0%Q3'25
0%Q4'25
1.35%Q1'26
3.68%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ770923
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Nov 2023
Project duration60 months
AddressPlot No IT 3, TZ 06, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address201, Nirmal Towers Barakhamba Road NA Delhi New Delhi
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLGBPSM-29-Dec-2022

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered1 May 2024
Original completion10 Oct 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,95,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors965 · 5 · 14 (units from plan)
ConfigurationUnitsCarpet area
OTHER96521-59
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block -B · OTHER48847-47
Block -C · OTHER48847-47
Block -D · OTHER48847-47
Block -E (HIGH RISE) · OTHER1461321-59
Block- A · OTHER48847-47
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Kulmeet shangari
License CA/97/21741
E 24, South extension new delhi 110049
Engineer
VD Sharma
E 24 South Extension New Delhi 110049
Contractor
ACC PVT LTD
Ashoka Estate Barakhamba Road New Delhi 01
Sr.Development work declared to RERA
1Demarcation of Plots
Designated plot is demarcated as per the Lease Plan issued nby the authority
2Boundary Wall
230 mm thick and 600 mm high brick wall and 1500 mm high M.S. fencing.
3Road Work
Internal Road size will be as per Layout Plan and it will be RCC Trimix Road
4Footpaths
Footpaths is provided as per layout plan
5Water Supply Including Drinking Water Facilities
Municipal water supply is used for drinking purpose
6Sewer System
Sewerage system is used with STP and its size will be as per the design calculation
7Drain
Separate drainage line has been used as per the design requirement
8Parks
Landscape area has been provided by Local Building Bye - laws
9Tree Planting
No of trees has been provided as per Local Building Bye - Laws
10Design For Electric Supply Including Street Lighting
Electric supply and street lighting has been provided as per the Layout Plan and Local Authority norms.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Disposal system of sewage and sullage water is being used through STP which will be used for landscape and flushing purpose.
13Solid Waste Management And Disposal System
All the solid waste management as per the biodegradable waste converted into compost and non-biodegradable delivered to registered agencies.
14Water Conservation System
Low flow water fixture being used for water conservation and STP water will be used for landscape and flushing purpose.
15Energy Management System Including Use of Renewable Energy
Specific U-Value glass has been used for energy management and for roof insulation light colour tiles will be used for renewable energy solar photovoltaic energy has been used for common area.
16Fire Protection And Fire Safety System
Fire system and fire safety system will be installed in the building as per NBC norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social infrastructure and other public amenities including public health services has been provided as per Local Building Bye-Laws
18Emergency Evacuation Services
As per the Environment management plan and Disaster management plan all provisions are made including assembly point,
19Other Miscellaneous Work
As per the Layout Plan and requirement .
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
2PROPSHOPUPRERAAGT10129
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 17 Oct 2028.

Sanctioned by Greater Noida Authority · 28,403 sqm of land · an approved plan of 5 blocks and 965 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLGBPSM-29-Dec-202218 Oct 202317 Oct 202816 Oct 203010 Oct 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
TZ-06304053.46Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · ITP0130018
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · BOOK NO. 1 JILD NO. 1111 PAGE NO 463-494 SERIAL NO. 1377
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New8 Jan 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Dec 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New11 Mar 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Dec 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New22 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New22 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New22 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New8 Jan 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New16 Apr 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Dec 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New18 Dec 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New18 Dec 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New18 Nov 2023 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New18 Dec 2023 ↗

Quarterly progress reports

11 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

11 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2026-Q1.

QuarterConstructionCertificates
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q30%CA ↗ · Arch ↗ · Eng ↗
2025-Q41.35%CA ↗ · Arch ↗ · Eng ↗
2026-Q13.68%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANSAL IT CITY & PARKS LIMITED
RolePromoter · current
RERA IDUPRERAPRM261765
PANAAFCA2456C
CIN / TANU72200DL2005PTC134789
Name of chairmanSunil Miglani
Registered address201, Nirmal Towers Barakhamba Road NA Delhi New Delhi
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameMAHALUXMI BUILDTECH LIMITED
RoleCo-promoter · current
RERA IDUPRERAPRM18214
Applicant typeCompany
PANAADCM7320H
CIN / TANU15494DL1989PLC034507
Name of chairmanMr. Sunil Miglani
Registered addressC1/C2, MAHALUXMI METRO TOWER, SECTOR 4, VAISHALI, GHAZIABAD.
RERA contact
Registered since2017
Legal nameMAHALUXMI INFRAHOME PVT LTD
RoleCo-promoter · current
RERA IDUPRERAPRM527
Applicant typeCompany
Registered addressC1/C2,Mahaluxmi Metra tower,Sector-4 Vaishali ,Gaziabad
RERA contact
Registered since2017

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ANSAL IT CITY AND PARKS LIMITED COLLECTION ACCOUNT FOR MIGSUN NEHRU PLACE 1BankCANARA BANKBranchALPHA COMMERCIAL MARKET GREATER NOIDABranch addressALPHA COMMERCIAL MARKET GREATER NOIDA 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCCNRB0018689Branch emailcb18689atcanarabank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ANSAL IT CITY AND PARKS LIMITED Separate Bank Account for Migsun Nehru Place 1BankCANARA BANKBranchALPHA COMMERCIAL MARKET GREATER NOIDABranch addressALPHA COMMERCIAL MARKET GREATER NOIDA - 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCCNRB0018689
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ANSAL IT CITY AND PARKS LIMITED RERA TRANSACTION ACCOUNT FOR MIGSUN NEHRU PLACE 1BankCANARA BANKBranchALPHA COMMERCIAL MARKET GREATER NOIDABranch addressALPHA COMMERCIAL MARKET GREATER NOIDA 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCCNRB0018689Branch emailcb18689atcanarabank.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)11 (Under Registration - 3 ) → 12 (Under Registration - 4 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)10 (Under Registration - 2 ) → 11 (Under Registration - 3 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)10 (Under Registration - 5 ) → 10 (Under Registration - 2 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)9 (Under Registration - 4 ) → 10 (Under Registration - 5 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)8 (Under Registration - 3 ) → 9 (Under Registration - 4 )
changed in Estanzo’s record
5 Sept 2026
Promoter’s complaints tally (all their projects)7 (Under Registration - 2 ) → 8 (Under Registration - 3 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)6 (Under Registration - 1 ) → 7 (Under Registration - 2 )
changed in Estanzo’s record
16 Aug 2026
Promoter’s complaints tally (all their projects)5 (Under Registration - 0 ) → 6 (Under Registration - 1 )
changed in Estanzo’s record
10 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 8 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Migsun Nehru Place 1

Is Migsun Nehru Place 1 RERA registered?

Yes. Migsun Nehru Place 1 is registered with UPRERA under registration number UPRERAPRJ770923, registered on 1 May 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Migsun Nehru Place 1?

The completion date filed with UPRERA is 10 Oct 2028. No completion certificate is on record yet.

Who is the builder of Migsun Nehru Place 1?

ANSAL IT CITY & PARKS LIMITED is the promoter entity that filed Migsun Nehru Place 1 with UPRERA (promoter RERA ID UPRERAPRM261765). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Migsun Nehru Place 1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Migsun Nehru Place 1 located?

Migsun Nehru Place 1 is registered in TZ 06, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Migsun Nehru Place 1?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Migsun Nehru Place 1?

The approved unit plan filed with UPRERA runs from 21 to 59 m² of carpet area (about 230 to 634 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Migsun Nehru Place 1?

The approved unit plan describes 5 blocks and 965 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Migsun Nehru Place 1?

About 137 units per acre: 965 planned units across 7.02 acres (28,403 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗