MILLAT HOME

UPRERARegistered

MILLAT HOME is a RERA-registered residential project by ABBASI RAO DEVELOPERS PRIVATE LIMITED in Meerut (RERA ID UPRERAPRJ7032). Registered with a completion deadline of 30 Jun 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7032
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start1 Jan 2015
Original start1 Jan 2015
Project duration102 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typeCompany
Applicant addressRegistered Office Address - Khasra No.- 386, 387/1, 387/2, Village- Bajaut, Bijli Bamba Road, Hapur Bypass, Meerut, Uttar Pradesh, PIN - 250002 Corporate Office Address - Khasra No.- 386, 387/1, 387/2, Village - Bajaut, Bijli Bamba Road, Hapur Bypass, Meerut, Uttar Pradesh, PIN - 250002 Site Address - Khasra No.- 386, 387/1, 387/2, Village - Bajaut, Bijli Bamba Road, Hapur Bypass, Meerut, Uttar Pradesh, PIN - 250002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    281/14

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. valid to

    Permit revalidated

    770 / Manchitr-Anu. Zone - A/ 20

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Aug 2017
Original completion31 Dec 2022
Revised completion30 Jun 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹88,000
Sanctioning authorityMeerut Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Faisal Riaz Khan
License COA/2007/40983
Sheel Architects, 07, 1st Floor, Saini Market, Nai Sadak, Shastri Nagar, Meerut
Engineer
Salman Khursheed
Sheel Architects, 07, 1st Floor, Saini Market. Nai Sadak, Shastri Nagar, Meerut
Contractor
Abbasi Rao Developers Pvt. Ltd.
387/2, Village Bajot, Bijli Bamba Road, Meerut
Sr.Development work declared to RERA
1Demarcation of Plots
Area - 16,566 (Sqmtr.)
2Boundary Wall
Complete
3Road Work
Cement Concrete Road
4Footpaths
Cement Concrete Block
5Water Supply Including Drinking Water Facilities
Submersible (PVC & CPVC)
6Sewer System
NP 2 Pipe
7Drain
Brick Work
8Parks
Green grass and Trees
9Tree Planting
Trees and Plantation
10Design For Electric Supply Including Street Lighting
with Cable tranch
11Community Buildings
Central Park, Club
12Treatment and Disposal System of Sewage and Sullage water
As per Approved Layout
13Solid Waste Management And Disposal System
As per Approved Layout
14Water Conservation System
As per Approved Layout
15Energy Management System Including Use of Renewable Energy
As per Approved Layout
16Fire Protection And Fire Safety System
As per Approved Layout
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Approved layout
18Emergency Evacuation Services
As per Approved Layout
19Other Miscellaneous Work
As per Approved layout
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Dec 2019. It carries a revalidation, valid to 31 Dec 2022.

Sanctioned by Meerut Development Authority · 16,566 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
281/141 Jan 201531 Dec 201931 Dec 202231 Dec 20225 Sept 2020
valid to 31 Dec 2022
as 770 / Manchitr-Anu. Zone - A/ 20
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2023.

#Granted fromExtended uptoNote
131 Dec 202230 Jun 2023Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

49 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
387/1, 387/2, 38618187.66—
387/2294.31Khasra
387/2714.11Khasra
387/2836.11Khasra
387/2276.86Khasra
387/2173.72Khasra
387/2250.08Khasra
387/2170.56Khasra
387/2192.30Khasra
387/2162.55Khasra
387/2170.57Khasra
387/2189.53Khasra
386250Khasra
387/2170.56Khasra
387/2341.13Khasra
387/2189.79Khasra
387/22174.50Khasra
387/22684Khasra
387/2542Khasra
387/21990Khasra
387/21740Khasra
387/21740Khasra
387/285.28Khasra
387/285.28Khasra
387/2133.77Khasra
387/2126.34Khasra
387/2176.88Khasra
387/283.61Khasra
387/288.44Khasra
387/2221.57Khasra
387/2245Khasra
387/2613.80Khasra
387/1700Khasra
387/2375Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

33 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 1 Feb 2013.

Registry no.DateTypeArea
174422 Feb 2013self—
9031 Feb 2013self—
304521 Mar 2013self—
304321 Mar 2013self—
11621 Feb 2014self—
100913 Oct 2013self—
1141814 Nov 2013self—
1292921 Dec 2013self—
1292821 Dec 2013self—
1180725 Nov 2013self—
1180425 Nov 2013self—
1326730 Dec 2013self—
75722 Jan 2014self—
974324 Sept 2013self—
921212 Sept 2013self—
87982 Sept 2013self—
856912 Aug 2013self—
829029 Jul 2013self—
673921 Jun 2013self—
673721 Jun 2013self—
61766 Jun 2013self—
60403 Jun 2013self—
583929 May 2013self—
319123 Mar 2013self—
303821 Mar 2013self—
304821 Mar 2013self—
9041 Feb 2013self—
1125912 Nov 2013self—
1330431 Dec 2013self—
673621 Jun 2013self—
11611 Feb 2014self—
645914 Jun 2013self—
1125712 Nov 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 903
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 904
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1744
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3043
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3038
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3048
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3045
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3191
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5839
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6040
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6176
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6459
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6737
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6736
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6739
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8290
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8569
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8798
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9212
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9743
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10091
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11257
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11259
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11418
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12929
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12928
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11804
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 11807
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13267
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13304
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 757
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1161
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1162
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New9 Mar 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 Mar 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New9 Mar 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New9 Mar 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New9 Mar 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New9 Mar 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New9 Mar 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 Mar 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New9 Mar 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New9 Mar 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New9 Mar 2022 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking wateravailable
Fire safety (as filed with RERA)available
Health serviceavailable
Renewable energyavailable
Other facilitiesavailable

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameABBASI RAO DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM13739
PANAAHCA5271F
CIN / TANU45400UP2009PTC036694
Name of chairmanJaved Rao
Registered addressRegistered Office Address - Khasra No.- 386, 387/1, 387/2, Village- Bajaut, Bijli Bamba Road, Hapur Bypass, Meerut, Uttar Pradesh, PIN - 250002 Corporate Office Address - Khasra No.- 386, 387/1, 387/2, Village - Bajaut, Bijli Bamba Road, Hapur Bypass, Meerut, Uttar Pradesh, PIN - 250002 Site Address - Khasra No.- 386, 387/1, 387/2, Village - Bajaut, Bijli Bamba Road, Hapur Bypass, Meerut, Uttar Pradesh, PIN - 250002
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ABBASI RAO DEVELOPERS PRIVATE LIMITED SEPARATE BANK ACCOUNT FOR MILLAT HOMEBankINDIAN OVERSEAS BANKBranchMEERUTA/C no.IFSCIOBA0000340
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about MILLAT HOME

Is MILLAT HOME RERA registered?

Yes. MILLAT HOME is registered with UPRERA under registration number UPRERAPRJ7032, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MILLAT HOME?

The completion date filed with UPRERA is 30 Jun 2023. No completion certificate is on record yet.

Who is the builder of MILLAT HOME?

ABBASI RAO DEVELOPERS PRIVATE LIMITED is the promoter entity that filed MILLAT HOME with UPRERA (promoter RERA ID UPRERAPRM13739). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted MILLAT HOME more time to complete?

UPRERA's record carries 1 completion extension for MILLAT HOME, the latest running to 30 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does MILLAT HOME have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MILLAT HOME located?

MILLAT HOME is registered in Meerut, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗