Narmada Apartment

UPRERARegistered

Narmada Apartment is a RERA-registered residential project by Lucknow Development Authority in Sector 4 Gomti Nagar Extension Lucknow, Lucknow (RERA ID UPRERAPRJ872887). Registered with a completion deadline of 23 Oct 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ872887
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Dec 2025
Project duration59 months
AddressKhasra No. 77,85,86, 87, 89 in Sector 4 Gomti Nagar Extension, Lucknow, Sector 4 Gomti Nagar Extension Lucknow, Lucknow, Lucknow
TehsilLucknow
Applicant typeCompetent authority
Applicant addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Government Building/Group Housing/17437/LDA/BP/25-26/3142/24102025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Jan 2026
Original completion23 Oct 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹65,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 3 · 30 (from plan)
ConfigurationUnitsCarpet area
3 BHK—156-160
PENTHOUSE—246-250
SHOP—16-133
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER-1 · OTHER, 3 BHK, PENTHOUSE, SHOP30—16-246
TOWER-2 · OTHER, 3 BHK, PENTHOUSE29—156-246
TOWER-3 · OTHER, 3 BHK, PENTHOUSE29—160-250
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Ar Shubhra Mittal ARINEM CONSULTANCY SERVICES PRIVATE LIMITED
License CA/1998/23369
1ST FLOOR AKASH II 31 GOKHALE MARG LUCKNOW
Engineer
RAMESH MUTTHU DASAPPA
76 SBI and other Banks Layout, Ringroad, Mysore
Contractor
Lucknow Development Authority
Pradhikaran Bhawan Vipin Khand Gomti Nagar Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Plot is already demarcated. all the development and construction work will be done under the demarcated plot.
2Boundary Wall
Brick work boundary wall at the height of 1500 mm and 600 mm high MS grill. Combination of RCC is proposed around the project as per sanctioned plan.
3Road Work
6.00 M & 7.5 M. Wide Cement concrete pavement with vacuum dewatered concrete is proposed around the building as per sanctioned plan.
4Footpaths
A footpath with a PCC base, 60 mm thick paver blocks, and kerb stone edging shall be provided as per the proper standard practice in the city.
5Water Supply Including Drinking Water Facilities
o Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Double-stack system with vent arrangement is designed for proper disposal of sewage from the site. The water line is connected to the water source, which will be a municipal water supply source and tubewells are proposed as back-up provision. Pipelines, pumping sets, and control valves are installed to convey water from the main pump station to various parts of the building and site . The distribution network is designed to optimize flow rates, pressure levels, and water quality throughout the system.
6Sewer System
A separate sewerage network will be provided. An R.C.C. sewer line will be installed. Manholes of 900 mm diameter will be provided as per the MEP system design. The proposed network will discharge the sewage into the existing municipal sewerage system.
7Drain
Storm water drainage system with ground water recharge provision (for rain water harvesting) will be provided which will be connected to the Municipal drain line as per specified plan.
8Parks
As per sanctioned plan.
9Tree Planting
Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
10Design For Electric Supply Including Street Lighting
A Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, Feeder pillar, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
11Community Buildings
There is a Club house building proposed in our project with all required amenities.
12Treatment and Disposal System of Sewage and Sullage water
A centralized sewage treatment plant is already present within the municipal limits, so there is no requirement of STP to be provided within site boundaries.
13Solid Waste Management And Disposal System
For Waste management and garbage collection Dust-bins are proposed in open areas. After completing the project, it will be operated by the local municipal corporation.
14Water Conservation System
A well-designed groundwater recharge arrangement as rainwater harvesting system shall be provided.
15Energy Management System Including Use of Renewable Energy
We will use LED lights as well as solar lights in external areas for energy management system.
16Fire Protection And Fire Safety System
Fire norms shall be followed as per NBC and approval of the fire department which shall include the following: o Smoke detectors, heat detectors, and manual pull stations throughout the building. o Centralized monitoring with integration for emergency response. o A comprehensive wet riser & automatic sprinkler system with static underground water storage as per standards. o Hydraulically calculated pipework for adequate water supply and pressure requirements.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Fire norms shall be followed as per NBC and approval of the fire department which shall include the following: o Smoke detectors, heat detectors, and manual pull stations throughout the building. o Centralized monitoring with integration for emergency response. o A comprehensive wet riser & automatic sprinkler system with static underground water storage as per standards. o Hydraulically calculated pipework for adequate water supply and pressure requirements.
18Emergency Evacuation Services
The staircase will be provided with emergency exit doors in each floor as per fire department specifications.
19Other Miscellaneous Work
Grand entrance lobby shall be provided.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 23 Oct 2030.

Sanctioned by Lucknow Development Authority · 11,964 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Government Building/Group Housing/17437/LDA/BP/25-26/3142/2410202524 Oct 202523 Oct 203023 Oct 203323 Oct 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

25 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
7710760Khasra
851010Khasra
863040Khasra
871010Khasra
892020Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1425-1420 ( KHASRA NO.77)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1420 ( KHASRA NO.85)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1420 ( KHASRA NO.86)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1420 ( KHASRA NO.87)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1420 ( KHASRA NO.89)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1420( Khasra No. 77,85,86,87,89) Certified copy
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · Gazat_
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Dec 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New20 Nov 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Nov 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New21 Nov 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New8 Jan 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New8 Jan 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Nov 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Dec 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Nov 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New20 Nov 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 Dec 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Jan 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New20 Nov 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New2 Jan 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q1.

QuarterConstructionCertificates
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLucknow Development Authority
RolePromoter · current
RERA IDUPRERAPRM10102
PANAAALL0016F
CIN / TANLKNL00280A
Registered addressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
LDA Col A/c Narmada ApartmentBankAxis Bank Ltd.BranchLucknow - Ashok MargBranch addressLGF Cp-52 Sectpr E Jankipura lucknow-226021Branch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0003619Branch emailjankipuramlucknow.branchhead@
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
LDA SEP A/C Narmada ApartmentBankAxis Bank Ltd.BranchLucknow - Ashok MargBranch addressLGF Cp-52 Sectpr E Jankipura lucknow-226021Branch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0003619
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
LDA TRN A/C Narmada ApartmentBankAxis Bank Ltd.BranchLucknow - Ashok MargBranch addressLGF Cp-52 Sectpr E Jankipura lucknow-226021Branch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0003619
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)584 (Under Registration - 5 ) → 584 (Under Registration - 4 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 4 ) → 584 (Under Registration - 5 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 5 ) → 583 (Under Registration - 4 )
changed in Estanzo’s record
19 Sept 2026
Promoter’s complaints tally (all their projects)583 (Under Registration - 7 ) → 583 (Under Registration - 5 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)582 (Under Registration - 7 ) → 583 (Under Registration - 7 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)580 (Under Registration - 5 ) → 582 (Under Registration - 7 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)579 (Under Registration - 5 ) → 580 (Under Registration - 5 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)578 (Under Registration - 4 ) → 579 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 8 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Narmada Apartment

Is Narmada Apartment RERA registered?

Yes. Narmada Apartment is registered with UPRERA under registration number UPRERAPRJ872887, registered on 19 Jan 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Narmada Apartment?

The completion date filed with UPRERA is 23 Oct 2030. No completion certificate is on record yet.

Who is the builder of Narmada Apartment?

Lucknow Development Authority is the promoter entity that filed Narmada Apartment with UPRERA (promoter RERA ID UPRERAPRM10102). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Narmada Apartment have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Narmada Apartment located?

Narmada Apartment is registered in Sector 4 Gomti Nagar Extension Lucknow, Lucknow, as filed with UPRERA.

What configurations are available in Narmada Apartment?

The unit plan filed with UPRERA lists OTHER, 3 BHK, PENTHOUSE and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Narmada Apartment?

The approved unit plan filed with UPRERA runs from 16 to 250 m² of carpet area (about 172 to 2,691 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗