NEW HIGHWAY CITY is a RERA-registered mixed project by BAPL INFRABUILD PRIVATE LIMITED in Kanpur Nagar (RERA ID UPRERAPRJ940852). Registered with a completion deadline of 22 Jun 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ940852 |
| Project category | Mixed |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Kanpur Development Authority |
| Proposed start | 23 Jun 2020 |
| Project duration | 72 months |
| Address | Kanpur, Kanpur Nagar |
| Tehsil | Kanpur |
| Applicant type | Company |
| Applicant address | Registered Office Address - MIG-220, AWAS VIKAS-1, PANKI ROAD, KALYANPUR,KANPUR-208018 Corporate Office Address - MIG-220, AWAS VIKAS-1, PANKI ROAD, KALYANPUR,KANPUR-208018 Site Address - Naramau, Kanpur |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1058/BHAWAN/ONLINE/2018-19
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Oct 2020 |
| Original completion | 22 Jun 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹6,09,000 |
| Sanctioning authority | Kanpur Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot shall be demarcated by stone Signage giving the Plot No. / Block. |
| 2 | Boundary Wall N.A. |
| 3 | Road Work Soil Filled and Compressed WBM plus with layer Bituminous on it. (Two Layers 6 + 4 Inches). |
| 4 | Footpaths With Soil Dressing - Top finished with Tiles. |
| 5 | Water Supply Including Drinking Water Facilities As per the specifications provided in the Sanctioned Plans. |
| 6 | Sewer System Sewer Line and STP. |
| 7 | Drain As per the specifications provided in the Sanctioned Plans. |
| 8 | Parks Parks with Grass and Plants, Size of Parks as per the Specifications provided in the Sanctioned Plans. 2 benches to be provided in the Park along with sufficient street lights inside the park. |
| 9 | Tree Planting Along the Roads and in the Parks. |
| 10 | Design For Electric Supply Including Street Lighting As per the specifications provided in the Sanctioned Plans. |
| 11 | Community Buildings N.A |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP. |
| 13 | Solid Waste Management And Disposal System Shall be carried out through the Approved Agency. |
| 14 | Water Conservation System Provision of Rain Water Harvesting System shall be done as per the norms and Specifications, as per the Bye - Laws of the Competent Authority. |
| 15 | Energy Management System Including Use of Renewable Energy N.A. |
| 16 | Fire Protection And Fire Safety System N.A. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services N.A. |
| 19 | Other Miscellaneous Work As per the specifications provided in the Sanctioned Plans. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Jun 2025.
Sanctioned by Kanpur Development Authority · 80,163 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1058/BHAWAN/ONLINE/2018-19 | 23 Jun 2020 | 22 Jun 2025 | 22 Jun 2026 | 22 Jun 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
46 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 523 | 6070 | Khasra |
| 523 | 8355 | Khasra |
| 523, 524 | 6376 | Khasra |
| 534, 535, 536, 538 | 8756 | Khasra |
| 485, 487 | 6250 | Khasra |
| 321, 514 | 8195 | Khasra |
| 516 | 1271 | Khasra |
| 57 | 19177.38 | Khasra |
| 57 | 418.05 | Khasra |
| 57 | 2050 | Khasra |
| 57 | 418.05 | Khasra |
| 45, 46, 47 | 600 | Khasra |
| 69, 70, 74, 75 | 3872 | Khasra |
| 523 | 8355 | Khasra |
| 74 | 0 | Khasra |
| 76 | 0 | Khasra |
| 484 | 0 | Khasra |
| 512 | 0 | Khasra |
| 513 | 0 | Khasra |
| 505 | 0 | Khasra |
| 506 | 0 | Khasra |
| 537 | 0 | Khasra |
| 517 | 0 | Khasra |
| 518 | 0 | Khasra |
| Registry document · 1917 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3276 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1918 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1282 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8302 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8301 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8304 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3451 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9742 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1919 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6469 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2244 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3296 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3171 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · Time Extension Letter for Objection Letter of UP RERA The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Reply Letter to Objection Letter The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Khatauni extract · Khasra - 74 - Chak Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 76 - Chak Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 484 - Chak Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 512 - Chak Raod An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 513 - Chak Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 505 - Master Plan Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 506 - Master Plan Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 537 - Master Plan Road An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 517 - Out of Map An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khasra - 518 - Out of Map An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 5252 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · Reply Letter The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Reply Letter The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Registry document · 6560 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 25 Aug 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Aug 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Aug 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 5 Sept 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 24 Aug 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 24 Aug 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 24 Aug 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 24 Aug 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Sept 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 5 Sept 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Aug 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Aug 2020 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 82% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 86% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 85.8% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 96% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | BAPL INFRABUILD PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM118562 |
| PAN | AAICB0978R |
| CIN / TAN | U45400UP2018PTC109874 |
| Name of chairman | POONAM TRIVEDI |
| Registered address | Registered Office Address - MIG-220, AWAS VIKAS-1, PANKI ROAD, KALYANPUR,KANPUR-208018 Corporate Office Address - MIG-220, AWAS VIKAS-1, PANKI ROAD, KALYANPUR,KANPUR-208018 Site Address - Naramau, Kanpur |
| RERA contact | |
| Registered since | 2020 |
| Legal name | VISION ADVANCED CONSTRUCTION LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - Arazi No.1368, Barasirohi, Nai Basti, Kalyanpur , Kanpur - 208017 Corporate Office Address - 70-B-2, Sai Complex Sai Puram, Lodheshwar Mandir, Panki Road, Kalyanpur, Kanpur- 208017 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | OMKRIPA INFRALAND PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - MIG-220, AWAS VIKAS-1, PANKI ROAD, KALYANPUR,KANPUR-208016 Corporate Office Address - 1/Com./13, Ambedkarpuram, Avas Vikas-3, kalyanpur, Kanpur Site Address- Naramau, Kanpur |
| RERA contact |
| Legal name | BANKIM ESTATE AND INVESTMENT PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Corporate Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | AMARESHA CITY HOMES REALITY AND DEVELOPMENT PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Corporate Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | PALLAVA DEVELOPMENT AND REALITY PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Corporate Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | JAYANTI DEVELOPMENT AND REALITY PRIVATELIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Corporate Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | JEEVAN DEVELOPMENT AND REALITY PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Corporate Office Address - Sahara India Point, CTS 40-44, S.V. Road, Goregaon West, Mummbai-400104 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | AMBUJA CITY HOMES SHELTER PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Corporate Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | ALVINA CITY HOMES ESTATE AND REALITY PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Corporate Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | ALOK CITY HOMES SHELTERS PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Corporate Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | AKHILESH CITY HOMES REALITY AND DEVELOPMENT PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Corporate Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | ALCINA CITY HOMES ESTATE AND DEVELOPMENT PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Corporate Office Address - 1, Kapoorthala Complex, Aliganj, Lucknow-226024 Site Address - Naramau, Kanpur |
| RERA contact |
| Legal name | MITHILAA DEVELOPMENT AND REALITY PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | Registered Office Address - SAHARA INDIA POINT CTS 40-44 S V ROAD GOREGAON WEST MUMBAI MH 400104 Corporate Office Address - SAHARA INDIA POINT CTS 40-44 S V ROAD GOREGAON WEST MUMBAI MH 400104 Site Address - Naramau, Kanpur |
| RERA contact |
Nearby projects
Kanpur Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | BAPL INFRABUILD PRIVATE LIMITEDBankBANK OF INDIABranchMANDHANA KANPURA/C no.IFSCBKID0006955 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about NEW HIGHWAY CITY
Is NEW HIGHWAY CITY RERA registered?
Yes. NEW HIGHWAY CITY is registered with UPRERA under registration number UPRERAPRJ940852, registered on 21 Oct 2020. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for NEW HIGHWAY CITY?
The completion date filed with UPRERA is 22 Jun 2026. No completion certificate is on record yet.
Who is the builder of NEW HIGHWAY CITY?
BAPL INFRABUILD PRIVATE LIMITED is the promoter entity that filed NEW HIGHWAY CITY with UPRERA (promoter RERA ID UPRERAPRM118562). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does NEW HIGHWAY CITY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is NEW HIGHWAY CITY located?
NEW HIGHWAY CITY is registered in Kanpur Nagar, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗