NX ONE is a RERA-registered commercial project by S.P.SAI.IT.PVT. LTD in Gautam Budh Nagar (RERA ID UPRERAPRJ4746). Registered with a completion deadline of 25 Nov 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4746 |
| Project category | Commercial |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Jun 2014 |
| Original start | 1 Jun 2014 |
| Project duration | 162 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | A-115, Office No-301, Old No.-51, 3rd Floor, Gali No.-1, Vakil Chamber, SHA, Karpur, East Delhi, New Delhi-110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PLG/(BP)3109/5612
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
- to
Extension granted
Permit revalidated (4)
6 building permits sanctioned
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Aug 2017 |
| Original completion | 29 Aug 2023 |
| Revised completion | 25 Nov 2027 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 31 Jan 2024 |
| Registration fee | ₹9,11,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER1,977 78%
- SHOP288 11%
- 2 BHK268 11%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 288 | 6-53 |
| OTHER | 1,977 | 29-39 |
| 2 BHK | 268 | 65-67 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| DOT COM · SHOP, OTHER | 4 | 289 | 6-53 |
| Residential Block-A · 2 BHK | 17 | 67 | 65-67 |
| Residential Block-B · 2 BHK | 17 | 67 | 65-67 |
| Residential Block-C · 2 BHK | 17 | 67 | 65-67 |
| Residential Block-D · 2 BHK | 17 | 67 | 65-67 |
| T2 · OTHER | 18 | 774 | 29 |
| T3 · OTHER | 20 | 760 | 39 |
| T4 · OTHER | 17 | 442 | 39 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NA |
| 2 | Boundary Wall RCC foundation, RCC columns, RCC beams, brickwork with plastering and painting |
| 3 | Road Work Soling and compacting by road roller, PCC with RCC tremix surface |
| 4 | Footpaths Soling and compacting by road roller, PCC with chequered/paverred tile |
| 5 | Water Supply Including Drinking Water Facilities As per authority norms |
| 6 | Sewer System As per authority norms |
| 7 | Drain As per authority norms |
| 8 | Parks As per landscape plan |
| 9 | Tree Planting As per landscape plan |
| 10 | Design For Electric Supply Including Street Lighting As per authority norms |
| 11 | Community Buildings Clubhouse |
| 12 | Treatment and Disposal System of Sewage and Sullage water As per authority norms |
| 13 | Solid Waste Management And Disposal System Sewage Treatment Plant as per authority norms |
| 14 | Water Conservation System As per authority norms |
| 15 | Energy Management System Including Use of Renewable Energy As per authority norms |
| 16 | Fire Protection And Fire Safety System As per authority norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per authority norms |
| 18 | Emergency Evacuation Services As per authority norms |
| 19 | Other Miscellaneous Work As per authority norms |
Registered agents
2 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | DIVYA KUMARI | UPRERAAGT12330 |
| 2 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
Permits & extensions
7 permits
An approval and the date it runs to - not proof the work matching it was done.
7 sanctioning permits are on record with UPRERA, the latest valid to 27 Oct 2029. 4 of them carry a revalidation.
Sanctioned by Greater Noida Authority · 82,327 sqm of land · an approved plan of 8 blocks and 2533 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG/(BP)3109/5612 | 30 Aug 2013 | 30 Aug 2018 | 29 Aug 2023 | 29 Aug 2023 | — | |
| PLG/BP/SM-06-Aug-2024:22136 | 28 Oct 2024 | 27 Oct 2029 | 26 Oct 2034 | 28 Feb 2024 | 28 Oct 2024 | |
| PLG/BP/SM-06-Aug-2024:22136 | 28 Oct 2024 | 27 Oct 2029 | 26 Oct 2034 | 28 Feb 2024 | 28 Oct 2024 | |
| PLG/BP/SM-06-Aug-2024:22136 | 28 Oct 2024 | 27 Oct 2029 | 26 Oct 2034 | 28 Feb 2024 | — | |
| PLG/BP/SM-06-Aug-2024:22136 | 28 Oct 2024 | 27 Oct 2029 | 26 Oct 2034 | 28 Feb 2024 | — | |
| PLG/BP/SM-06-Aug-2024:22136 | 28 Oct 2024 | 27 Oct 2029 | 26 Oct 2034 | 26 Nov 2025 | 28 Oct 2024 | |
| PLG/BP/SM-06-Aug-2024:22136 | 28 Oct 2024 | 27 Oct 2029 | 26 Oct 2034 | 25 Nov 2027 | 28 Oct 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 25 Nov 2027.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 29 Aug 2023 | 28 Feb 2024 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 28 Feb 2024 | 26 Nov 2025 | — |
| 3 | 26 Nov 2025 | 25 Nov 2027 | — |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 17 | 100020 | Plot |
3 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 28 Dec 2011.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 25002 | 28 Dec 2011 | self | — |
| 25002 | 28 Dec 2011 | self | — |
| 25002 | 28 Dec 2011 | self | — |
| Allotment letter from the authority · IND/IT/2008/155 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 29 Jan 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 29 Jan 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Jan 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Jan 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Jan 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Jan 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 5 Jul 2018 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 24 Jan 2022 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 22 Feb 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 22 Feb 2018 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Authority supply |
| Fire safety (as filed with RERA) | As per NBC norms |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 88% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 90% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 90% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | S.P.SAI.IT.PVT. LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2562 |
| PAN | AAPCS4269P |
| CIN / TAN | DELS46221A |
| Name of chairman | Arvind Kumar Singh |
| Registered address | A-115, Office No-301, Old No.-51, 3rd Floor, Gali No.-1, Vakil Chamber, SHA, Karpur, East Delhi, New Delhi-110092 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SP SAI IT PVT LTD RERA A/CBankYES BANK LIMITEDBranchYES BANK LIMITEDA/C no.IFSCYESB0000014 |
What has changed on this record
6 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 174 (Under Registration - 3 ) → 174 (Under Registration - 2 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 174 (Under Registration - 6 ) → 174 (Under Registration - 3 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 173 (Under Registration - 5 ) → 174 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 170 (Under Registration - 2 ) → 173 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 169 (Under Registration - 1 ) → 170 (Under Registration - 2 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 169 (Under Registration - 2 ) → 169 (Under Registration - 1 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 6 movements on record |
Common questions about NX ONE
Is NX ONE RERA registered?
Yes. NX ONE is registered with UPRERA under registration number UPRERAPRJ4746, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has NX ONE been completed?
UPRERA still lists NX ONE as Registered, so it is not shown as completed here. A completion certificate dated 31 Jan 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of NX ONE?
S.P.SAI.IT.PVT. LTD is the promoter entity that filed NX ONE with UPRERA (promoter RERA ID UPRERAPRM2562). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted NX ONE more time to complete?
UPRERA's record carries 3 completion extensions for NX ONE, the latest running to 25 Nov 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does NX ONE have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is NX ONE located?
NX ONE is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in NX ONE?
The unit plan filed with UPRERA lists SHOP, OTHER and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in NX ONE?
The approved unit plan filed with UPRERA runs from 6 to 67 m² of carpet area (about 63 to 718 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in NX ONE?
The approved unit plan describes 8 blocks and 2,533 units of which 2,245 are homes and 288 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is NX ONE?
About 125 units per acre: 2,533 planned units across 20.34 acres (82,327 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗