Omaxe Metro City P-8 A is a RERA-registered residential project by Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) in Sarojini Nagar, Lucknow (RERA ID UPRERAPRJ619659). Registered with a completion deadline of 30 Sept 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ619659 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Mar 2024 |
| Project duration | 43 months |
| Address | Sarojini Nagar, Sarojini Nagar, Sarojini Nagar, Lucknow |
| Tehsil | Sarojini Nagar |
| Applicant type | Company |
| Applicant address | 10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
109/Hitech/Layout/2023
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 May 2024 |
| Original completion | 30 Sept 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,38,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation will be done by the Company. |
| 2 | Boundary Wall Boundary wall will be constructed by the promoter in the villas, no boundary well will be provided in the plots. |
| 3 | Road Work Road network including 9M/ 12M/ 18M/ 24M roads will be provided in the township. |
| 4 | Footpaths Pathway of 2M to 3M width on both sides of roads will be developed in the township. |
| 5 | Water Supply Including Drinking Water Facilities Water supply will be connected to plots through common over head water tank in the township. |
| 6 | Sewer System Centralized STP will be constructed at Site for water recycle. The treated water will be used for tree plantation. |
| 7 | Drain Net-work of drains will be provide and will be connected with Ground Water Harvesting system. |
| 8 | Parks Green and parks will be developed as per the approved layout at the site. |
| 9 | Tree Planting Tree plantation will be developed on road berms and green area. |
| 10 | Design For Electric Supply Including Street Lighting Common electric sub station will be provided at the site. Street lighting will be provided at the site. |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP will be constructed at the site and treated water will be used for green area and plantation. |
| 13 | Solid Waste Management And Disposal System Solid waste management will be provided at the site as per the local norms. |
| 14 | Water Conservation System Rain water harvesting will be provided at the site. |
| 15 | Energy Management System Including Use of Renewable Energy The proposed project is envisioned as a green, sustainable building, committed to environmental responsibility and resource efficiency throughout the building entire life cycle. |
| 16 | Fire Protection And Fire Safety System All Fire norms shall be followed as per NBC code and approval of fire department.
fire sprinklers, smoke detectores with pumps are provided as per norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Social infrastructure and other Public Amenities including Public Health Services will be provided in Hi-Tech township. |
| 18 | Emergency Evacuation Services The project aims to conserve natural resources and implement optimized energy-efficient systems aligning with sustainable building practices to promote a postive impact on the eniroment and long-term operational efficiency. |
| 19 | Other Miscellaneous Work NA |
Registered agents
11 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | ALMIGHTY INFRAESTATE PVT LTD | UPRERAAGT10163 |
| 3 | GOLDEN ESTATE | UPRERAAGT10397 |
| 4 | LINK PROPERTIES | UPRERAAGT10081 |
| 5 | MAYANK OJHA | UPRERAAGT10570 |
| 6 | Purvanchal Buildhome | UPRERAAGT10883 |
| 7 | RADHESH CHANDRA | UPRERAAGT10484 |
| 8 | RELIVE SOLUTIONS PVT. LTD. | UPRERAAGT10078 |
| 9 | Sachan Estate Pvt Ltd | UPRERAAGT10143 |
| 10 | SHREE SHRADDHA PROPERTIES | UPRERAAGT10301 |
| 11 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Oct 2027.
Sanctioned by Lucknow Development Authority · 26,689 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 109/Hitech/Layout/2023 | 10 Oct 2022 | 9 Oct 2027 | 8 Oct 2030 | 30 Sept 2027 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
41 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 2204 | 1100 | Khasra |
| 2205 | 1240 | Khasra |
| 2206 | 0 | Khasra |
| 2210 | 0 | Khasra |
| 2211 | 640 | Khasra |
| 2212 | 9490 | Khasra |
| 2231 | 6950 | Khasra |
| 2232 | 740 | Khasra |
| 2234 | 3020 | Khasra |
| 2235 | 550 | Khasra |
| 2236 | 4590 | Khasra |
| 2237 | 380 | Khasra |
| 2346 | 1455 | Khasra |
| 2354 | 4040 | Khasra |
| 2354 | 2530 | Khasra |
| 2360 | 690 | Khasra |
| 2362 | 600 | Khasra |
| 2364 | 4215 | Khasra |
| 2192 | 2200 | Khasra |
| 3211 | 1000 | Khasra |
| 3212 | 1740 | Khasra |
| 2205/ 3512 | 240 | Khasra |
| Sale deed · 301 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3819 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10505 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14237 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14346 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17626 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17731 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 19195 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 19197 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 19198 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 22120 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 22123 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 29157 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 47850 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8611 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 39918 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 19 Feb 2024 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 19 Feb 2024 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 19 Feb 2024 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 19 Feb 2024 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 19 Feb 2024 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 19 Feb 2024 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 19 Feb 2024 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Mar 2024 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 19 Feb 2024 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 16 Mar 2024 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 19 Feb 2024 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 19 Feb 2024 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 19 Feb 2024 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 19 Feb 2024 ↗ |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 23.68% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 23.68% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 23.68% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 27.66% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5708 |
| PAN | AADCG1919Q |
| CIN / TAN | DELG12028C |
| Name of chairman | Mr. Manoj Tiwari |
| Registered address | 10, Local Shopping Centre, Kalkaji, New Delhi - 110019, Delhi, INDIA |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Omaxe Garv Buildtech Collection Account for Metro City P-8 ABankAxis BankBranchAxis Bank, Vibhuti Khand, LucknowBranch addressAxis Bank, Vibhuti Khand, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0002800Branch emailcustomer.service@axisbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Omaxe Garv Buildtech Separate Bank Account for Metro City P-8 ABankAxis BankBranchAxis Bank, Vibhuti khand, LucknowBranch addressAxis Bank, Vibhuti Khand, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0002800 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Omaxe Garv Buildtech Rera Transaction Account for Metro City P-8 ABankAxis BankBranchAxis Bank, Vibhuti Khand, LucknowBranch addressAxis Bank, Vibhuti Khand, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCUTIB0002800 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 40 (Under Registration - 2 ) → 41 (Under Registration - 3 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 40 (Under Registration - 3 ) → 40 (Under Registration - 2 ) changed in Estanzo’s record | 15 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 39 (Under Registration - 4 ) → 40 (Under Registration - 3 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 17 Sept 2026 · 3 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Omaxe Metro City P-8 A
Is Omaxe Metro City P-8 A RERA registered?
Yes. Omaxe Metro City P-8 A is registered with UPRERA under registration number UPRERAPRJ619659, registered on 27 May 2024. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Omaxe Metro City P-8 A?
The completion date filed with UPRERA is 30 Sept 2027. No completion certificate is on record yet.
Who is the builder of Omaxe Metro City P-8 A?
Omaxe Garv Buildtech Private Limited (fomerly Garv Buildtech Private Limited) is the promoter entity that filed Omaxe Metro City P-8 A with UPRERA (promoter RERA ID UPRERAPRM5708). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Omaxe Metro City P-8 A have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Omaxe Metro City P-8 A located?
Omaxe Metro City P-8 A is registered in Sarojini Nagar, Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗