PADAM ENCLAVE

UPRERARegistered

PADAM ENCLAVE is a RERA-registered residential project by PADAM ENCLAVE in Prayagraj (RERA ID UPRERAPRJ10166). Registered with a completion deadline of 31 Aug 2017.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10166
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Proposed start16 Jun 2014
Original start18 May 2013
Project duration39 months
AddressPrayagraj
Applicant typePartnership Firm
Applicant address218E/71, PSQUARE MALL, 3RD FLOOR, MG MARG, ALLAHABAD-211001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  4. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  5. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Aug 2017
Original completion31 Aug 2017
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary30 May 2019
Registration fee₹30,000

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SHIVARPIT KATOCH
License CA/99/25542
115 BLOCKIV, FIRST FLOOR GANGA SHOPPING COMPLEX SECTOR 29 NOIDA UP
Engineer
REWATI RAMAN SINGH
D&R CONSULTANT 100 3RD FLOOR BHARAT NAGAR NFC NEW DELHI
Contractor
DEENBANDHU SHAW
C-5 PUSHPENDRA APPARTMENTS ALLAHABAD-211001

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

4,968 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

13 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
158MI530—
159MI1894—
1601400—
161MI1400—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

5 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 17 Apr 1973.

Registry no.DateTypeArea
135629 Jul 1975self—
67421 Apr 1975self—
46917 Apr 1973self—
46817 Apr 1973self—
179231 Mar 2010self—
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Aug 2017 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
Old12 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old12 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old12 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old12 Aug 2017 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
Old8 Nov 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterFROM OVER HEAD TANKS FILLED BY BORWELL
Fire safety (as filed with RERA)YES AS PER NBC 2005
Health serviceSEWAGE SYSTEM PROVIDED
Renewable energyPROVIDED SOLAR WATER HEATING SYSTEM
Other facilitiesSWIMMING POOL AND GYMNASIEUM

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePADAM ENCLAVE
RolePromoter · current
RERA IDUPRERAPRM20216
PANAAOFP8902C
CIN / TANALDP02203F
Registered address218E/71, PSQUARE MALL, 3RD FLOOR, MG MARG, ALLAHABAD-211001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Prayagraj

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PADAM ENCLAVEBankHDFC BANK LIMITEDBranchCIVIL LINES ALLAHABADA/C no.IFSCHDFC0000226
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about PADAM ENCLAVE

Is PADAM ENCLAVE RERA registered?

Yes. PADAM ENCLAVE is registered with UPRERA under registration number UPRERAPRJ10166, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has PADAM ENCLAVE been completed?

UPRERA still lists PADAM ENCLAVE as Registered, so it is not shown as completed here. A completion certificate dated 30 May 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of PADAM ENCLAVE?

PADAM ENCLAVE is the promoter entity that filed PADAM ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM20216). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does PADAM ENCLAVE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PADAM ENCLAVE located?

PADAM ENCLAVE is registered in Prayagraj, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗