PARX LAUREATE

UPRERARegistered

PARX LAUREATE is a RERA-registered residential project by LAUREATE BUILDWELL PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ5998). Registered with UP-RERA.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5998
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start15 Mar 2012
Original start15 Mar 2012
Project duration-1346
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address323,AGARWAL PLAZA,PLOT NO.3,DDA COMMUNITY CENTRE,SECTOR 14,ROHINI,DELHI-110085
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NOIDA/STP/III-251/459

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Aug 2017
Original completion
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary30 Mar 2022
Registration fee₹2,26,500
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors747 · 10 · 26 (units from plan)
Homes · commercial units739 · 8 (shops and offices filed in the same plan)
  • 4 BHK332 44%
  • 3 BHK212 28%
  • STUDIO168 22%
  • PENTHOUSE27 4%
  • SHOP8 1%
ConfigurationUnitsCarpet area
4 BHK332197-225
PENTHOUSE27228-319
3 BHK212157-225
STUDIO16828-30
SHOP84-57
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
ASPEN · 4 BHK, PENTHOUSE2060197-319
BANYAN · 4 BHK, PENTHOUSE2060197-319
CEDAR · 4 BHK, PENTHOUSE2060197-319
DELONIX · 4 BHK, PENTHOUSE2060197-319
LAUREL · 3 BHK, 4 BHK, PENTHOUSE2266157-319
MAPLE · 3 BHK, 4 BHK, PENTHOUSE2266157-319
NECTARINE · 3 BHK, 4 BHK, PENTHOUSE2267157-319
OLIVE · 3 BHK, 4 BHK, PENTHOUSE2266157-319
PALM · 3 BHK, 4 BHK, PENTHOUSE2266157-319
PARX OVAL · STUDIO, SHOP221764-57
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 220.6 m² for a SHOP, far outside the rest of that type, so the ranges above leave it out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
COSMIC ARCHITECTS PVT LTD
License CA/20185
ELIXIR BUSINESS PARK,SECTOR 127,NOIDA,UP
Engineer
COSMIC ARCHITECTS PVT LTD
ELIXIR BUSINESS PARK,SECTOR 127,NOIDA,UP
Contractor
PRW CONTRACTORS
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
as per sound engineering practices
3Road Work
as per sound engineering practices
4Footpaths
interlocking pavers/chequered tiles
5Water Supply Including Drinking Water Facilities
as per sound engineering practices
6Sewer System
as per sound engineering practices
7Drain
as per sound engineering practices
8Parks
Green lawns with dedicated kids area ,play areas with badminton,tennis,basketball courts etc
9Tree Planting
local/drought tolerant species
10Design For Electric Supply Including Street Lighting
as per sound engineering practices
11Community Buildings
Social club having a swimming pool,celebration hall, activity room etc
12Treatment and Disposal System of Sewage and Sullage water
as per sound engineering practices
13Solid Waste Management And Disposal System
as per sound engineering practices
14Water Conservation System
as per sound engineering practices
15Energy Management System Including Use of Renewable Energy
as per sound engineering practices
16Fire Protection And Fire Safety System
as per sound engineering practices
17Social Infrastructure And Other Public Amenities Including Public Health Services
as per sound engineering practices
18Emergency Evacuation Services
as per norms
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 11 Oct 2016.

Sanctioned by Noida Authority · 44,280 sqm of land · an approved plan of 10 blocks and 747 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NOIDA/STP/III-251/45912 Oct 201111 Oct 201611 Oct 2021—
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗

Land & documents

32 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01,02,0344280Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · NOIDA/GHP/GH-01,02,03-108/2011
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · NOIDA/GHP/GH-01,02,03-108/2011
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · 1817
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1817
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1817
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old3 Mar 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAS PER NORMS
Fire safety (as filed with RERA)AS PER NORMS
Renewable energyAS PER NORMS

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLAUREATE BUILDWELL PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM12246
PANAABCL9261C
CIN / TANU45200DL2011PTC212494
Name of chairmanMR. RAJEEV SHARMA MR MAHENDRA BANSAL MR ISHWAR C
Registered address323,AGARWAL PLAZA,PLOT NO.3,DDA COMMUNITY CENTRE,SECTOR 14,ROHINI,DELHI-110085
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
LAUREATE BUILDWELL PRIVATE LIMITEDBankVIJAYA BANKBranchNOIDA COMPLEX BRANCH SECTOR 19A/C no.IFSCVIJB0007126
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 76
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 75
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 74
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 73
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 72
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 71
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 70
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 69
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 68
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 67
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 66
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 65
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 64
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 63
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 62
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 61
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 60
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 59
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 58
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 57
Registry Document In Case of Own Land
newly filed with RERA
18 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 3 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about PARX LAUREATE

Is PARX LAUREATE RERA registered?

Yes. PARX LAUREATE is registered with UPRERA under registration number UPRERAPRJ5998, registered on 3 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has PARX LAUREATE been completed?

UPRERA still lists PARX LAUREATE as Registered, so it is not shown as completed here. A completion certificate dated 30 Mar 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of PARX LAUREATE?

LAUREATE BUILDWELL PRIVATE LIMITED is the promoter entity that filed PARX LAUREATE with UPRERA (promoter RERA ID UPRERAPRM12246). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does PARX LAUREATE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PARX LAUREATE located?

PARX LAUREATE is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in PARX LAUREATE?

The unit plan filed with UPRERA lists 4 BHK, PENTHOUSE, 3 BHK, STUDIO and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PARX LAUREATE?

The approved unit plan filed with UPRERA runs from 4 to 319 m² of carpet area (about 46 to 3,434 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PARX LAUREATE?

The approved unit plan describes 10 blocks and 747 units of which 739 are homes and 8 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PARX LAUREATE?

About 68 units per acre: 747 planned units across 10.94 acres (44,280 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗