PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY

UPRERARegistered

PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY is a RERA-registered residential project by ASHISH BAJPAI in Gautam Budh Nagar (RERA ID UPRERAPRJ13913). Registered with a completion deadline of 30 Apr 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ13913
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Nov 2016
Original start1 Jan 2013
Project duration66 months
AddressDadri, Gautam Budh Nagar
TehsilDadri
Applicant typeIndividual
Applicant address19/5 Ramjas Building, 4/A Park Road, Near BOB Bank, Civil Hospital Crossing, Hazratganj, Lucknow UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    III-251/491

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Oct 2017
Original completion31 Oct 2021
Revised completion30 Apr 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,05,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,137 · 12 · 28 (units from plan)
  • 3 BHK752 66%
  • 2 BHK277 24%
  • 4 BHK108 9%
ConfigurationUnitsCarpet area
3 BHK75280-119
2 BHK27769
4 BHK108168-195
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T-K · 3 BHK, 2 BHK288469-80
T-L · 3 BHK, 2 BHK2811269-93
T-M · 3 BHK, 2 BHK2811269-80
T-N · 3 BHK, 2 BHK2810869-80
T-O · 3 BHK28112100-119
T-P · 3 BHK28112100-119
T-Q` · 3 BHK282893
T-R · 3 BHK, 2 BHK2811269-80
T-S · 3 BHK, 2 BHK2811069-93
T-T · 3 BHK, 2 BHK288369-80
T-U · 4 BHK, 3 BHK2879119-195
T-V · 4 BHK, 3 BHK2885119-195
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NATIONAL ARCHITECT & ENGINEER
License CA/92/15179
14 OLD NAVYUG MARKET, GHAZIABAD
Engineer
MANISH CONSULTANT
C-8/01 AARDEE CITY G.F GURGOAN
Sr.Development work declared to RERA
1Demarcation of Plots
yes
2Boundary Wall
yes
3Tree Planting
Not Yet
4Design For Electric Supply Including Street Lighting
yes
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 15 Jan 2017.

Sanctioned by Noida Authority · 40,000 sqm of land · an approved plan of 12 blocks and 1137 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
III-251/49116 Jan 201215 Jan 201715 Jan 202231 Oct 2021
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Apr 2022.

#Granted fromExtended uptoNote
131 Oct 202130 Apr 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

2 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
251 & 25240000—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 31 Mar 2010.

Registry no.DateTypeArea
133031 Mar 2010other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · I-1330
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterunder ground water tank & over head water tank
Fire safety (as filed with RERA)with under ground water tank facility with pump & hydrents
Health serviceSuitable nos. of toilets and first aid boxes were to be provided at each towers
Renewable energysolar system
Other facilitieselectrical transformer will be fenced with proper arrangements.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameASHISH BAJPAI
RolePromoter · current
RERA IDUPRERAPRM28838
PANBEJPB7801L
Registered address19/5 Ramjas Building, 4/A Park Road, Near BOB Bank, Civil Hospital Crossing, Hazratganj, Lucknow UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PEBBLES PROLEASE PVT. LTDBankBANK OF MAHARASTRABranchSECTOR -62A/C no.IFSCMAHB0001340
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY

Is PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY RERA registered?

Yes. PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY is registered with UPRERA under registration number UPRERAPRJ13913, registered on 28 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY?

The completion date filed with UPRERA is 30 Apr 2022. No completion certificate is on record yet.

Who is the builder of PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY?

ASHISH BAJPAI is the promoter entity that filed PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY with UPRERA (promoter RERA ID UPRERAPRM28838). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY more time to complete?

UPRERA's record carries 1 completion extension for PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY, the latest running to 30 Apr 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY located?

PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY?

The approved unit plan filed with UPRERA runs from 69 to 195 m² of carpet area (about 746 to 2,097 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY?

The approved unit plan describes 12 blocks and 1,137 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PEBBLES PROLEASE PVT LTD (HEARTBEAT CITY?

About 115 units per acre: 1,137 planned units across 9.88 acres (40,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗