PRESTIGE HEIGHT is a RERA-registered residential project by PRESTIGE INFRATECH PVT LTD in Ghaziabad (RERA ID UPRERAPRJ10622). Registered with a completion deadline of 30 Dec 2019.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ10622 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Aug 2013 |
| Original start | 1 Aug 2013 |
| Project duration | 77 months |
| Address | Ghaziabad |
| Applicant type | Company |
| Applicant address | 5/5,DB GUPTA ROAD, PAHAR GANJ, DELHI |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated (3)
3 building permits sanctioned
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 14 Aug 2017 |
| Original completion | 30 Dec 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 6 Mar 2020 |
| Registration fee | ₹18,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | — | 438-2,813 |
| 2 BHK | — | 2,510 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| F · 3 BHK, 2 BHK, OTHER | 17 | — | 438-2,813 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots AS PER SANTIONED PLAN |
| 2 | Boundary Wall AS PER SANTIONED PLAN |
| 3 | Road Work CEMENT CONCRETE INTERNAL ROAD (CC ROAD ABOVE THE 2 CORSE OF WBM |
| 4 | Footpaths FOOTHPATHS IN INTERLOCKING PAVERS |
| 5 | Water Supply Including Drinking Water Facilities WATER TO BE PROVIDED BY THE GDA AND DEVLOPER WILL MAKE UGT OF CAPACITY AS PER NORMS |
| 6 | Sewer System MAIN SEWER LINE HAS BEEN DESIGNED AS PER NORMS AND PARTIALLY LAY IN BASEMENT CELLING AND WILL FINALLY CONNECT TO STP |
| 7 | Drain UNDERGROUND SYSTEM USING UPVC(SN 4) & MESONARY CHAMBERS SEWER PIPES |
| 8 | Parks LANDSCAPE HAS BEENDESIGNED BY AS PER AUTHORITY GUIDLINES |
| 9 | Tree Planting LANDSCAPE AND TREE PLANTING HAS BEENDESIGNED BY AS PER AUTHORITY GUIDLINES |
| 10 | Design For Electric Supply Including Street Lighting DESIGNED HAS BEE DONE AS PER UP ELECTRICITY BOARD GUIDLINES AND SHALL BE PROVIDED NECESSARY SWITCH GEAR ELTC FOR DISTRIBUTING ELECTRICTY AT LT VOLTAGE |
| 11 | Community Buildings CLUB HAS BEEN BEEN DESIGNED AS PER AUTHORITY NORMS AND FACILTIES LIKE PARTY HALL, GAMING ZONE ENTERTAINMENT AREA ETC |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP OF CAPACITY AS PER NORMS SHALL BE PROVIDED TRATED WATER SHALL BE USED FOR FLUSIHING , IRRIGATION, CAE WASH, PATHWAYS CLEAING AND EXCESS SEWAGE SHALL BE DISCHARGED IN THE MUNCIPAL SEWER |
| 13 | Solid Waste Management And Disposal System MANUAL COLLECTION AND ORGANIC WASTE CONVERTER SHALL BE PROVIDED IN THE PROJECT |
| 14 | Water Conservation System RECYCLING OF TREATED WATER AND RAIN WATER SYSTEM TO BE PROVIDED |
| 15 | Energy Management System Including Use of Renewable Energy SINGLE POINT METERING WILL BE THERE FOR ENERGY PURCHASES FROM THE GRID POWER SUPPLY COMPANY |
| 16 | Fire Protection And Fire Safety System FIRE TENDER PATH SHALL BE PROVIDED AS PER NBC FIRE FIGHTING SYSTEMS ALONG WITH PUMPS AND WATER STORAGE TANKS SHALL BE PROVIDED AS PER NBC & NOC FROM FIRE DEPT |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services AS PER SANTIONCED MAP |
| 18 | Emergency Evacuation Services STAIR CASES SHALL BE PROVIDED IN BASEMENT & ALL THE TOWERS FOR FIRE EMERGENCY EXIT AS PER NORMS |
| 19 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | Sehlot realtors & developers | UPRERAAGT11769 |
Permits & extensions
3 permits
An approval and the date it runs to - not proof the work matching it was done.
3 sanctioning permits are on record with UPRERA, the latest valid to 31 Jul 2019. All 3 carry a revalidation, the latest valid to 31 Jul 2022.
Sanctioned by Ghaziabad Development Authority · 2,673 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 882240/GMPGH/11-12 | 1 Aug 2014 | 8 May 2017 | 31 Dec 2018 | 30 Dec 2019 | 1 Aug 2014 valid to 31 Mar 2019 as 882240/GMPGH/13-14 | |
| 882240/GMPGH/11-12 | 1 Aug 2014 | 31 Mar 2019 | 31 Jul 2022 | 30 Dec 2019 | 1 Aug 2014 valid to 31 Jul 2022 | |
| 882240/GMPGH/11-12 | 1 Aug 2014 | 31 Jul 2019 | 31 Jul 2022 | 30 Dec 2019 | 1 Aug 2014 valid to 31 Jul 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
Land & documents
17 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1048 | 2673 | — |
| 1048 | 2673 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 1 Aug 2012.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 9752 | 1 Aug 2012 | self | — |
| Registry document · 9752 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9752 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9752 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 9752 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 21 May 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 21 May 2019 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 21 May 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 May 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 May 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 May 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 May 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 21 May 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 May 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 21 May 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 21 May 2019 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 14 Aug 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 14 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | as per sanctioned map |
| Fire safety (as filed with RERA) | as per sanctioned map |
| Health service | YES |
| Renewable energy | as per sanctioned map |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PRESTIGE INFRATECH PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM19359 |
| PAN | AAGCP5525N |
| CIN / TAN | U70101DL2012PTC234112 |
| Name of chairman | Ravinder singh, subhash Agarwal, Raj kumar Bansal, |
| Registered address | 5/5,DB GUPTA ROAD, PAHAR GANJ, DELHI |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | prestige infratech pvt ltdBankicici bankBranchDB gupta road pahar ganj delhiA/C no.IFSCicic0000722 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about PRESTIGE HEIGHT
Is PRESTIGE HEIGHT RERA registered?
Yes. PRESTIGE HEIGHT is registered with UPRERA under registration number UPRERAPRJ10622, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has PRESTIGE HEIGHT been completed?
UPRERA still lists PRESTIGE HEIGHT as Registered, so it is not shown as completed here. A completion certificate dated 6 Mar 2020 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of PRESTIGE HEIGHT?
PRESTIGE INFRATECH PVT LTD is the promoter entity that filed PRESTIGE HEIGHT with UPRERA (promoter RERA ID UPRERAPRM19359). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does PRESTIGE HEIGHT have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is PRESTIGE HEIGHT located?
PRESTIGE HEIGHT is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in PRESTIGE HEIGHT?
The unit plan filed with UPRERA lists 3 BHK, 2 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in PRESTIGE HEIGHT?
The approved unit plan filed with UPRERA runs from 438 to 2,813 m² of carpet area (about 4,715 to 30,279 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗