Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun

UPRERARegistered

Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun is a RERA-registered mixed project by U.P. Awas Evam Vikas Parishad in Budaun (RERA ID UPRERAPRJ301018). Registered with a completion deadline of 12 Sept 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ301018
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start13 Sept 2022
Project duration48 months
AddressBudaun, Budaun
TehsilBudaun
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    APD/UN-2/BUDAUN/Y-2/PH-2/LOP(EXT.)SFS HOUSES NUMBERING/344/01

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Sept 2022
Original completion12 Sept 2025
Revised completion12 Sept 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary2 Sept 2026
Registration fee₹3,45,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MUKESH KUMAR RUHELA
License CA/2002/29652
OFFICE OF ARCHITECT PLANNER ARCHITECT AND PLANNIG UNIT-2 NEELGIRI COMPLEX INDRA NAGAR LUCKNOW.
Engineer
NAVEEN KUMAR VERMA
SECON FLOOR COMMERCIAL COMPLEX SHIVAJI CHAWK RAJENDRA NAGAR, BAREILLY.
Contractor
EXECUTIVE ENGINEER CD RUHELKHAND-FOUR UP AVAS EVAM VIKAS PARISHAD BAREILLY.
SECOND FLOOR COMMERCIAL COMPLEX SHIVAJI CHAUK RAJENDRA NAGAR BAREILLY
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER LAYOUT PLAN THE PLOTS SHALL BE DEMARCATED BY MEANS OF NUMBERING
2Boundary Wall
PARISHAD SHALL NOT APOVEDE ANY BOUNDARY WALL AROUND PROPERTY
3Road Work
AS PER SPECIFICATION ON UP AWAS EVAM VIKAS PARISHAD (CHIEF ENGINEER)
4Footpaths
AS PER APPROVED MAP SIDE PATRI SHALL BE PROVIDED FOR WOLING
5Water Supply Including Drinking Water Facilities
TO BE PROVIDED AS PER UP AWAS EVAM VIKAS PARISHAD NORMS
6Sewer System
TO BE PROVIDED S PER UP AWAS EVAM VIKAS PARISHAD NORMS AND DESIGN
7Drain
SHALL BE PROVIDED AS PER DESIGN AND DEAWING
8Parks
SHAL BE PROVIDED AS PER DESIGN AND DRAWING.
9Tree Planting
AS PER STANDERD NORMS.
10Design For Electric Supply Including Street Lighting
SHALL BE PROVIDED
11Community Buildings
SHALL NOT BE RPOVIDED
12Treatment and Disposal System of Sewage and Sullage water
STP SHALL BE PROVIDED
13Solid Waste Management And Disposal System
COLLECTIVE DUSTIN SHALL BE PROVIDED ALLOTEE HAVE TO PUT THERE SOLID
14Water Conservation System
RAIN WATER HARVESTING AS PER APPROVED NORMS
15Energy Management System Including Use of Renewable Energy
SOLAR PANELS IN INDIVIDUAL PLOTS IN LINE WITH THE BUILDING BY LAWS
16Fire Protection And Fire Safety System
SHALL NOT BE PROVIDED.
17Social Infrastructure And Other Public Amenities Including Public Health Services
PRIVATE PUBLIC HEALTH SERVICE SHALL BE PROVIDED
18Emergency Evacuation Services
NOT APPLICABLE
19Other Miscellaneous Work
IN ACCORDING TO THE REGISTRATION BOOKLET.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Jan 2027.

Sanctioned by U.P. Awas Evam Vikas Parishad · 45,000 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
APD/UN-2/BUDAUN/Y-2/PH-2/LOP(EXT.)SFS HOUSES NUMBERING/344/0127 Jan 202226 Jan 202727 Jan 202212 Sept 2025
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 12 Sept 2026.

#Granted fromExtended uptoNote
112 Sept 202512 Sept 2026—

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
AS PER ATTACHED DOCUMENTS3510874Khasra
567 TO 569, 572 TO 606, 608 TO 615, 623 TO 625, 843 TO 856, 858 TO 861, 863, 865, 867 TO 883, 885 TO 894, 896 TO 926457380Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · 20
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New13 Sept 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Sept 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New13 Sept 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Sept 2022 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New13 Sept 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New13 Sept 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New13 Sept 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Sept 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New13 Sept 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Sept 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New13 Sept 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Sept 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Sept 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New13 Sept 2022 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2022-Q2 to 2025-Q2.

QuarterConstructionCertificates
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q250%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Budaun

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP CIVIL LINES YOJ.NO.02 BHAG-02 BADAUN 3RD PHASE RESIDENTIAL/COMMERCIAL SFS (SEMIFINISHED) HOUSE 317 PROPERTY COLLECTION ACCOUNTBankINDUSIND BANK CIVIL LINESBranchINDRA CHOWKBranch addressCIVIL LINES BUDAUNBranch districtBudaun, Uttar PradeshA/C no.IFSCINDB0001047
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPVAP CIVIL LINES YOJ. NO-02 BHAG-02 BADAUN 3RD PHASE RESIDENTIAL/COMMERCIAL SFS (SEMEFINISHED) HOUSE 317 PROPERTY SEPARATE ACCOUNTBankINDUSIN BANKBranchINDRA CHOWKBranch addressCIVIL LINES BUDAUNBranch districtBudaun, Uttar PradeshA/C no.IFSCINDB0001047
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP CIVIL LINES YOJ. NO-02 BHAG-02 BADAUN 3RD PHASE RESIDENTIAL/COMMERCIAL SFS (SEMIFINISHED) HOUSE 317 PROPERTY TRANSACTION ACCOUNTBankINDUSIND BANKBranchINDRA CHOWKBranch addressCIVIL LINES BUDAUNBranch districtBudaun, Uttar PradeshA/C no.IFSCINDB0001047
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

15 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Actual completion2026-09-02
first recorded by Estanzo
5 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun

Is Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun RERA registered?

Yes. Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun is registered with UPRERA under registration number UPRERAPRJ301018, registered on 30 Sept 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun been completed?

UPRERA still lists Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun as Registered, so it is not shown as completed here. A completion certificate dated 2 Sept 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun more time to complete?

UPRERA's record carries 1 completion extension for Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun, the latest running to 12 Sept 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun located?

Proposed 124 No. Residential Plots, 02 No. Commercial Plots, 06 No. Institutional Plots, 01 No. School Plot and 182 No. Semi Finished SFS Houses at Civil Lines Yojna No 2 Phase 2 Budaun is registered in Budaun, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗