PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA

UPRERARegistered

PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA is a RERA-registered residential project by PURVANCHAL PROJECTS PRIVATE LIMITED in SECTOR 22 D, Gautam Budh Nagar (RERA ID UPRERAPRJ746863). Registered with a completion deadline of 29 Jan 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q1'25
—Q2'25
4.49%Q3'25
6.82%Q4'25
10.13%Q1'26
12.63%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ746863
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start15 Feb 2025
Project duration60 months
AddressPLOT NO. GH-1A/1, SECTOR 22 D , YAMUNA EXPRESSWAY DEVELOPMENT AUTHORITY, GAUTAM BUDDHA NAGAR, SECTOR 22 D, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressLSC, A-7, 2nd FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR, PHASE-II, DELHI-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    790/2025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Apr 2025
Original completion29 Jan 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,17,500
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,160 · 7 · 27 (units from plan)
Homes · commercial units1,112 · 48 (shops and offices filed in the same plan)
  • 3 BHK800 69%
  • 1 BHK266 23%
  • SHOP48 4%
  • 4 BHK46 4%
ConfigurationUnitsCarpet area
4 BHK46209
3 BHK80097-138
SHOP484-33
1 BHK26634
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · OTHER, 4 BHK2546209
2 · OTHER, 3 BHK27100138
3 · OTHER, 3 BHK27100138
4 · OTHER, 3 BHK2720098-115
5 · OTHER, 3 BHK2720098-115
6 · OTHER, 3 BHK2720097-115
7 · OTHER, SHOP, 1 BHK223144-34
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MR. ARUN PATWAL
License CA/1988/11752
DEVELOPMENTS CONSULTANT, 209 C, MASJID MOTH, ( OPP. R BLOCK SOUTH EXTENSION PART 2 ) NEW DELHI 110049
Engineer
SWATI STRUCTURE SOLUTIONS PRIVATE LIMITED
503, 5th floor, Sachdeva Corporate Tower, Plot No. 8, Sector 8 Rohini, Delhi 110085
Contractor
PURVANCHAL PROJECTS PRIVATE LIMITED
PURVANCHAL PLAZA, LSC A- 7, MAYUR VIHAR PHASE 2, NEW DELHI, 110092
Sr.Development work declared to RERA
1Demarcation of Plots
Two Side open plot having 24 meter wide road on East side and 120 meter wide sector road on North side. Proper demarcation and barracadding of plot is completed as per approved layout.
2Boundary Wall
Boundary wall of the plot will be constructed with a combination of RCC columns and brick wall in between. It will be finished with red sand stone and MS grill.
3Road Work
7.5 Meter drive way will be provided in trimix concrete road over this a finish of cement concrete pavement tiles / stamped concreting will be done.
4Footpaths
Footpaths inside the complex will be constructed with mix of colored cement concrete checkered tiles and granite.
5Water Supply Including Drinking Water Facilities
The water supply of desired quality and purity will be provided through over head tanks up to each unit through treated water supplied by central water supply from development authority.
6Sewer System
The proper provision of sewer line has been provided as per norms and bye laws of development authority. Sewage treatment plant of suitable capacity will be established.
7Drain
The proper provision of drainage has been provided as per the norms and bye laws of development authority. A well designed drainage system connected to the sewage treatment plant of suitable capacity will be established.
8Parks
Well Designed park consisting of Good Quality Grass, mounts, many types of ornamental Trees and Plantation and water bodies.
9Tree Planting
Trees will be planted inside the complex in accordance with the approved drawings from development authority.
10Design For Electric Supply Including Street Lighting
Designer electric poles, LED lights to be provided. All electrical related workings shall confirming to bureau of Indian standards, Indian electricity rules.
11Community Buildings
A community building comprising of a Basement + Ground + 3 Floors will be constructed as per the approved layout.
12Treatment and Disposal System of Sewage and Sullage water
The proper provision for treatment and disposal of sewage and sullage water will be provided in accordance with the norms and bye laws of the development authority. The sewage treatment plant of suitable capacity will be established for the treatment and disposal of sewage and sullage water, provisions are provided for recycled water to used in flushing and irrigation works.
13Solid Waste Management And Disposal System
The proper provision for solid waste management and disposal system will be provided in accordance with the norms and bye laws of development authority.
14Water Conservation System
All guidelines and bye laws of competent authority will be followed for the conservation of natural water. Rainwater harvesting system will be provided in accordance with the approved maps and layouts from the development authority.
15Energy Management System Including Use of Renewable Energy
Partial solar energy will be utilized as per the bye laws of competent authority and as per approved building plans.
16Fire Protection And Fire Safety System
All rules and regulations of NBC is being followed. Water sprinklers system with automatic upright /pendent sidewall sprinklers on each floor as per the national building code - 2016. Intelligent fire detection and alarm system in the entire building will be provided.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Yes.
18Emergency Evacuation Services
Fire staircase has been provided on each floor for emergency evacuation. Intelligent fire detection and alarms system with emergency voice evacuation system will be installed.
19Other Miscellaneous Work
Mechanical Ventilation will be provided as per the NBC Code and approved drawing.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

14 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 PROP GUIDE LLPUPRERAAGT20190
2BANI ADVISORS LLPUPRERAAGT23757
3Bhim Kumar ( Home scope infratech )UPRERAAGT16199
4Jaya PandeyUPRERAAGT21275
5KAPUR ESTATESUPRERAAGT11301
6Kutumb ServicesUPRERAAGT13108
7Propertypistol Realty Pvt LtdUPRERAAGT12730
8PROPSELLER INDIA PRIVATE LIMITEDUPRERAAGT22343
9RANJAN KUMAR C/O ANKUR REAL ESTATE DEVELOPERSUPRERAAGT13363
10Sapphire EstateUPRERAAGT12673
11SMART BRICK REALCON LLPUPRERAAGT25798
12star estateUPRERAAGT10202
13vardhanam Infratech pvt ltdUPRERAAGT15161
14WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 30 Jan 2030.

Sanctioned by Yamuna Expressway Authority · 42,406 sqm of land · an approved plan of 7 blocks and 1160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
790/202531 Jan 202530 Jan 203030 Jan 203529 Jan 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

32 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot GH-1A/142406Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 33728
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · YEA/GH07/3729/2024
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · 33728
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Mar 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Mar 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Mar 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Mar 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New17 Feb 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New17 Feb 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New17 Feb 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New3 Mar 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Mar 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New25 Mar 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New25 Mar 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New25 Mar 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New3 Mar 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New25 Mar 2025 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q2.

QuarterConstructionCertificates
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q24.49%CA ↗ · Arch ↗ · Eng ↗
2025-Q36.82%CA ↗ · Arch ↗ · Eng ↗
2025-Q410.13%CA ↗ · Arch ↗ · Eng ↗
2026-Q112.63%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePURVANCHAL PROJECTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM73757
PANAAFCP4046B
CIN / TANU70102DL2010PTC200716
Name of chairmanSHAH ALAM
Registered addressLSC, A-7, 2nd FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR, PHASE-II, DELHI-110092
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
PPPL COL AC PSUNBLISS GH1A1 SEC 22DYEIDABankHDFC BANK LIMITEDBranchNOIDA SECTOR 41Branch addressSHOP NO. 8 , BLOCK B 127, SECTOR 41Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001292Branch emailAJAY.KUMAR@HDFCBANK.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
PPPL SEP AC PSUNBLISS GH1A1 SEC 22DYEIDABankHDFC BANKBranchNOIDA SECTOR 41Branch addressSHOP NO. 8 , BLOCK - B, 127, SECTOR 41Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001292
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
PPPL TRN AC PSUNBLISS GH1A1 SEC22DYEIDABankHDFC BANK LIMITEDBranchNOIDA SECTOR 41Branch addressSHOP NO. 8, BLOCK B 127 SECTOR 41Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001292
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA

Is PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA RERA registered?

Yes. PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA is registered with UPRERA under registration number UPRERAPRJ746863, registered on 8 Apr 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?

The completion date filed with UPRERA is 29 Jan 2030. No completion certificate is on record yet.

Who is the builder of PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?

PURVANCHAL PROJECTS PRIVATE LIMITED is the promoter entity that filed PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA with UPRERA (promoter RERA ID UPRERAPRM73757). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA located?

PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA is registered in SECTOR 22 D, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?

The unit plan filed with UPRERA lists OTHER, 4 BHK, 3 BHK, SHOP and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?

The approved unit plan filed with UPRERA runs from 4 to 209 m² of carpet area (about 46 to 2,250 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?

The approved unit plan describes 7 blocks and 1,160 units of which 1,112 are homes and 48 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?

About 111 units per acre: 1,160 planned units across 10.48 acres (42,406 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗