PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA is a RERA-registered residential project by PURVANCHAL PROJECTS PRIVATE LIMITED in SECTOR 22 D, Gautam Budh Nagar (RERA ID UPRERAPRJ746863). Registered with a completion deadline of 29 Jan 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ746863 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Yamuna Expressway Authority |
| Proposed start | 15 Feb 2025 |
| Project duration | 60 months |
| Address | PLOT NO. GH-1A/1, SECTOR 22 D , YAMUNA EXPRESSWAY DEVELOPMENT AUTHORITY, GAUTAM BUDDHA NAGAR, SECTOR 22 D, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | LSC, A-7, 2nd FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR, PHASE-II, DELHI-110092 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
790/2025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 8 Apr 2025 |
| Original completion | 29 Jan 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,17,500 |
| Sanctioning authority | Yamuna Expressway Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK800 69%
- 1 BHK266 23%
- SHOP48 4%
- 4 BHK46 4%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 46 | 209 |
| 3 BHK | 800 | 97-138 |
| SHOP | 48 | 4-33 |
| 1 BHK | 266 | 34 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · OTHER, 4 BHK | 25 | 46 | 209 |
| 2 · OTHER, 3 BHK | 27 | 100 | 138 |
| 3 · OTHER, 3 BHK | 27 | 100 | 138 |
| 4 · OTHER, 3 BHK | 27 | 200 | 98-115 |
| 5 · OTHER, 3 BHK | 27 | 200 | 98-115 |
| 6 · OTHER, 3 BHK | 27 | 200 | 97-115 |
| 7 · OTHER, SHOP, 1 BHK | 22 | 314 | 4-34 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Two Side open plot having 24 meter wide road on East side and 120 meter wide sector road on North side. Proper demarcation and barracadding of plot is completed as per approved layout. |
| 2 | Boundary Wall Boundary wall of the plot will be constructed with a combination of RCC columns and brick wall in between. It will be finished with red sand stone and MS grill. |
| 3 | Road Work 7.5 Meter drive way will be provided in trimix concrete road over this a finish of cement concrete pavement tiles / stamped concreting will be done. |
| 4 | Footpaths Footpaths inside the complex will be constructed with mix of colored cement concrete checkered tiles and granite. |
| 5 | Water Supply Including Drinking Water Facilities The water supply of desired quality and purity will be provided through over head tanks up to each unit through treated water supplied by central water supply from development authority. |
| 6 | Sewer System The proper provision of sewer line has been provided as per norms and bye laws of development authority. Sewage treatment plant of suitable capacity will be established. |
| 7 | Drain The proper provision of drainage has been provided as per the norms and bye laws of development authority. A well designed drainage system connected to the sewage treatment plant of suitable capacity will be established. |
| 8 | Parks Well Designed park consisting of Good Quality Grass, mounts, many types of ornamental Trees and Plantation and water bodies. |
| 9 | Tree Planting Trees will be planted inside the complex in accordance with the approved drawings from development authority. |
| 10 | Design For Electric Supply Including Street Lighting Designer electric poles, LED lights to be provided. All electrical related workings shall confirming to bureau of Indian standards, Indian electricity rules. |
| 11 | Community Buildings A community building comprising of a Basement + Ground + 3 Floors will be constructed as per the approved layout. |
| 12 | Treatment and Disposal System of Sewage and Sullage water The proper provision for treatment and disposal of sewage and sullage water will be provided in accordance with the norms and bye laws of the development authority. The sewage treatment plant of suitable capacity will be established for the treatment and disposal of sewage and sullage water, provisions are provided for recycled water to used in flushing and irrigation works. |
| 13 | Solid Waste Management And Disposal System The proper provision for solid waste management and disposal system will be provided in accordance with the norms and bye laws of development authority. |
| 14 | Water Conservation System All guidelines and bye laws of competent authority will be followed for the conservation of natural water. Rainwater harvesting system will be provided in accordance with the approved maps and layouts from the development authority. |
| 15 | Energy Management System Including Use of Renewable Energy Partial solar energy will be utilized as per the bye laws of competent authority and as per approved building plans. |
| 16 | Fire Protection And Fire Safety System All rules and regulations of NBC is being followed. Water sprinklers system with automatic upright /pendent sidewall sprinklers on each floor as per the national building code - 2016. Intelligent fire detection and alarm system in the entire building will be provided. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Yes. |
| 18 | Emergency Evacuation Services Fire staircase has been provided on each floor for emergency evacuation. Intelligent fire detection and alarms system with emergency voice evacuation system will be installed. |
| 19 | Other Miscellaneous Work Mechanical Ventilation will be provided as per the NBC Code and approved drawing. |
Registered agents
14 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 PROP GUIDE LLP | UPRERAAGT20190 |
| 2 | BANI ADVISORS LLP | UPRERAAGT23757 |
| 3 | Bhim Kumar ( Home scope infratech ) | UPRERAAGT16199 |
| 4 | Jaya Pandey | UPRERAAGT21275 |
| 5 | KAPUR ESTATES | UPRERAAGT11301 |
| 6 | Kutumb Services | UPRERAAGT13108 |
| 7 | Propertypistol Realty Pvt Ltd | UPRERAAGT12730 |
| 8 | PROPSELLER INDIA PRIVATE LIMITED | UPRERAAGT22343 |
| 9 | RANJAN KUMAR C/O ANKUR REAL ESTATE DEVELOPERS | UPRERAAGT13363 |
| 10 | Sapphire Estate | UPRERAAGT12673 |
| 11 | SMART BRICK REALCON LLP | UPRERAAGT25798 |
| 12 | star estate | UPRERAAGT10202 |
| 13 | vardhanam Infratech pvt ltd | UPRERAAGT15161 |
| 14 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 30 Jan 2030.
Sanctioned by Yamuna Expressway Authority · 42,406 sqm of land · an approved plan of 7 blocks and 1160 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 790/2025 | 31 Jan 2025 | 30 Jan 2030 | 30 Jan 2035 | 29 Jan 2030 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
32 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot GH-1A/1 | 42406 | Plot |
| Lease deed · 33728 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Allotment letter from the authority · YEA/GH07/3729/2024 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Lease deed · 33728 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 7 Mar 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Mar 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Mar 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Mar 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 17 Feb 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 17 Feb 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 17 Feb 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 3 Mar 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Mar 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 25 Mar 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Mar 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Mar 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 3 Mar 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 25 Mar 2025 ↗ |
Quarterly progress reports
7 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
7 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 4.49% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 6.82% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 10.13% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 12.63% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PURVANCHAL PROJECTS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM73757 |
| PAN | AAFCP4046B |
| CIN / TAN | U70102DL2010PTC200716 |
| Name of chairman | SHAH ALAM |
| Registered address | LSC, A-7, 2nd FLOOR, PURVANCHAL PLAZA, MAYUR VIHAR, PHASE-II, DELHI-110092 |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | PPPL COL AC PSUNBLISS GH1A1 SEC 22DYEIDABankHDFC BANK LIMITEDBranchNOIDA SECTOR 41Branch addressSHOP NO. 8 , BLOCK B 127, SECTOR 41Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001292Branch emailAJAY.KUMAR@HDFCBANK.COM |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | PPPL SEP AC PSUNBLISS GH1A1 SEC 22DYEIDABankHDFC BANKBranchNOIDA SECTOR 41Branch addressSHOP NO. 8 , BLOCK - B, 127, SECTOR 41Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001292 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | PPPL TRN AC PSUNBLISS GH1A1 SEC22DYEIDABankHDFC BANK LIMITEDBranchNOIDA SECTOR 41Branch addressSHOP NO. 8, BLOCK B 127 SECTOR 41Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0001292 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 21 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA
Is PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA RERA registered?
Yes. PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA is registered with UPRERA under registration number UPRERAPRJ746863, registered on 8 Apr 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?
The completion date filed with UPRERA is 29 Jan 2030. No completion certificate is on record yet.
Who is the builder of PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?
PURVANCHAL PROJECTS PRIVATE LIMITED is the promoter entity that filed PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA with UPRERA (promoter RERA ID UPRERAPRM73757). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA located?
PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA is registered in SECTOR 22 D, Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?
The unit plan filed with UPRERA lists OTHER, 4 BHK, 3 BHK, SHOP and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?
The approved unit plan filed with UPRERA runs from 4 to 209 m² of carpet area (about 46 to 2,250 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?
The approved unit plan describes 7 blocks and 1,160 units of which 1,112 are homes and 48 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is PURVANCHAL SUNBLISS PLOT NO. GH-1A/1 SECTOR 22D YEIDA?
About 111 units per acre: 1,160 planned units across 10.48 acres (42,406 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗