PUSHPANJALI ANANDAM

UPRERARegistered

PUSHPANJALI ANANDAM is a RERA-registered residential project by TRIPURARI ESTATE PRIVATE LIMITED in Mathura (RERA ID UPRERAPRJ837521). Registered with a completion deadline of 10 Jan 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ837521
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMathura-Vrindavan Development Authority
Proposed start11 Jan 2022
Project duration60 months
AddressMathura, Mathura
TehsilMathura
Applicant typeCompany
Applicant addressBLOCK 29 2ND FLOOR DELHI GATE AGRA 282002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MVDA/LD/21-22/0040/22052021

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Mar 2022
Original completion10 Jan 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary24 Mar 2025
Registration fee₹24,500
Sanctioning authorityMathura-Vrindavan Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Dhruv Kulshrestha
License CA/2002/28984
24 Old Idgah Colony Agra -01
Engineer
SANJIV SHARMA
57 and 58 Jaipur House Agra-10
Contractor
Tripurari Estate Private Limited
2nd Floor Pushpanjali Palace, Delhi Gate, Agra
Sr.Development work declared to RERA
1Demarcation of Plots
Plot in Sq Mtr. 0-100 (27) and Commercial Plot (1) Area 93.06 Sq. Mtr. (Total 28 Plot Including 1 Commercial Plots
2Boundary Wall
Boundary Wall 4 feet height
3Road Work
Road prepared PCC, Tremix
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
4 UPVC WATER LINE
6Sewer System
RCC SEWAGE TREATMENT PLANT (STP)
7Drain
6 PVC PIPE FOR SEVER LINE AND DRAIN WILL BE OPEN
8Parks
PARK WITH BRICK BOUNDARY
9Tree Planting
SEASONAL PLANT
10Design For Electric Supply Including Street Lighting
ELECTRIC POLL, STREET LIGHT , TRANSFORMER FOR ELECTRIC SUPPLY
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
SEWAGE TREATMENT PLANT
13Solid Waste Management And Disposal System
DALAV GHAR
14Water Conservation System
RAIN WATER HARVESTING PLANT
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Jan 2027.

Sanctioned by Mathura-Vrindavan Development Authority · 3,870 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MVDA/LD/21-22/0040/2205202111 Jan 202210 Jan 202710 Jan 203010 Jan 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
280 PART3870Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 10392
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Jan 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New22 Jan 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New22 Jan 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New22 Jan 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New22 Jan 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New22 Jan 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Feb 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Feb 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New11 Feb 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New22 Jan 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New22 Jan 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New22 Jan 2022 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New17 Feb 2022 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2023-Q4.

QuarterConstructionCertificates
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameTRIPURARI ESTATE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM160658
PANAACCT9540K
CIN / TANU45400UP2008PTC035354
Name of chairmanMAYANK AGARWAL
Registered addressBLOCK 29 2ND FLOOR DELHI GATE AGRA 282002
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Mathura

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
TRIPURARI ESTATE PRIVATE LIMITED COLLECTION ACCOUNT FOR PUSHPANJALI ANANDAMBankYES BANK LIMITEDBranchMATHURABranch addressDAMPIER NAGAR MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCYESB0000072
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
TRIPURARI ESTATE PRIVATE LIMITED SEPARATE ACCOUNT FOR PUSHPANJALI ANANDAMBankYES BANK LIMITEDBranchDAMPIER NAGAR MATHURABranch addressDAMPIER NAGAR MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCYESB0000072
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
TRIPURARI ESTATE PRIVATE LIMITED TRANSACTION ACCOUNT FOR PUSHPANJALI ANANDAMBankYES BANK LIMITEDBranchDAMPIER NAGAR MATHURABranch addressDAMPIER NAGAR MATHURABranch districtMathura, Uttar PradeshA/C no.IFSCYESB0000072
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about PUSHPANJALI ANANDAM

Is PUSHPANJALI ANANDAM RERA registered?

Yes. PUSHPANJALI ANANDAM is registered with UPRERA under registration number UPRERAPRJ837521, registered on 30 Mar 2022. Estanzo reproduces that filing; it does not verify the work behind it.

Has PUSHPANJALI ANANDAM been completed?

UPRERA still lists PUSHPANJALI ANANDAM as Registered, so it is not shown as completed here. A completion certificate dated 24 Mar 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of PUSHPANJALI ANANDAM?

TRIPURARI ESTATE PRIVATE LIMITED is the promoter entity that filed PUSHPANJALI ANANDAM with UPRERA (promoter RERA ID UPRERAPRM160658). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does PUSHPANJALI ANANDAM have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PUSHPANJALI ANANDAM located?

PUSHPANJALI ANANDAM is registered in Mathura, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗