Krishna Castle- GH 02, Plotting

UPRERARegistered

Krishna Castle- GH 02, Plotting is a RERA-registered residential project by Omaxe Limited in Mathura (RERA ID UPRERAPRJ738600). Registered with a completion deadline of 31 Dec 2019.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ738600
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMathura-Vrindavan Development Authority
Proposed start1 Dec 2018
Project duration13 months
AddressMathura, Mathura
TehsilMathura
Applicant typeCompany
Applicant addressSHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    167/V/17-18

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered26 Mar 2019
Original completion31 Dec 2019
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary17 Nov 2022
Registration fee₹48,000
Sanctioning authorityMathura-Vrindavan Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Prakash Kumar
License CA/2008/43012
7, LSC, Kalkaji, New Delhi
Engineer
NA
NA
Contractor
Omaxe Limited
7, LSC, Kalkaji, New Delhi
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of Plots has been completed at the site.
2Boundary Wall
Will be done as per approved plan.
3Road Work
In progress.
4Footpaths
As per Drawing it will be Constructed
5Water Supply Including Drinking Water Facilities
in progress as per approved layout plan.
6Sewer System
in progress as per approved layout plan.
7Drain
in progress as per approved layout plan.
8Parks
As per Drawing it will be Constructed
9Tree Planting
As per Drawing it will be Completed
10Design For Electric Supply Including Street Lighting
in progress as per approved layout plan.
11Community Buildings
Common Facility provide as per integrated township
12Treatment and Disposal System of Sewage and Sullage water
Already Installed.
13Solid Waste Management And Disposal System
As per Approved Drawing
14Water Conservation System
As per Approved Drawing
15Energy Management System Including Use of Renewable Energy
As per Approved Drawing
16Fire Protection And Fire Safety System
As per Approved Drawing
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Approved Drawing
18Emergency Evacuation Services
As per Approved Drawing
19Other Miscellaneous Work
As per Approved Drawing
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

8 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1GOLDEN ESTATEUPRERAAGT10397
2INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
3Jeetu SharmaUPRERAAGT14595
4JITENDRA KUMAR AGRAWALUPRERAAGT12589
5star estateUPRERAAGT10202
6SUNBEAM REAL ESTATEUPRERAAGT11625
7SUNIL KUMAR PRAJAPATIUPRERAAGT12499
8vikram Jeet Singh ChadhaUPRERAAGT10805
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Dec 2023.

Sanctioned by Mathura-Vrindavan Development Authority · 8,543 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
167/V/17-185 Feb 201826 Dec 202325 Dec 202531 Dec 2019
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
558437.91Khasra
557400.19Khasra
556450.34Khasra
555631.97Khasra
1057287.4Khasra
5663442.12Khasra
5672892.2Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 9329
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2311
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1694
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2501
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13670
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9330
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9329,2311,1694,2501,13670,9330
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 100/2008( Consortium Agreement)
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 2015
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · 4986 and 5816
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Registry document · Land Summary
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New1 Feb 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Feb 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Feb 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 Mar 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New1 Feb 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New1 Feb 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New27 Feb 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Feb 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New27 Feb 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Feb 2019 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOmaxe Limited
RolePromoter · current
RERA IDUPRERAPRM2386
PANAAACO0171H
CIN / TANDELO01861G
Name of chairmanMr. Rohtash Goel
Registered addressSHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Mathura

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Omaxe LimitedBankAxis BankBranchMalviya NagarA/C no.IFSCUTIB0000206
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)224 (Under Registration - 4 ) → 225 (Under Registration - 4 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)224 (Under Registration - 5 ) → 224 (Under Registration - 4 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)223 (Under Registration - 4 ) → 224 (Under Registration - 5 )
changed in Estanzo’s record
11 Sept 2026
Promoter’s complaints tally (all their projects)223 (Under Registration - 5 ) → 223 (Under Registration - 4 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)220 (Under Registration - 3 ) → 223 (Under Registration - 5 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

3 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Krishna Castle- GH 02, Plotting

Is Krishna Castle- GH 02, Plotting RERA registered?

Yes. Krishna Castle- GH 02, Plotting is registered with UPRERA under registration number UPRERAPRJ738600, registered on 26 Mar 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Krishna Castle- GH 02, Plotting been completed?

UPRERA still lists Krishna Castle- GH 02, Plotting as Registered, so it is not shown as completed here. A completion certificate dated 17 Nov 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Krishna Castle- GH 02, Plotting?

Omaxe Limited is the promoter entity that filed Krishna Castle- GH 02, Plotting with UPRERA (promoter RERA ID UPRERAPRM2386). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Krishna Castle- GH 02, Plotting have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Krishna Castle- GH 02, Plotting located?

Krishna Castle- GH 02, Plotting is registered in Mathura, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗