RGN Sector 4 Alakhnanda Enclave is a RERA-registered residential project by Bareilly Development Authority in Bareilly (RERA ID UPRERAPRJ801806). Registered with a completion deadline of 2 Aug 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ801806 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Nov 2021 |
| Project duration | 58 months |
| Address | Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Competent authority |
| Applicant address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
004Part/2021
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 26 Oct 2021 |
| Original completion | 30 Jun 2026 |
| Revised completion | 2 Aug 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹4,59,500 |
| Sanctioning authority | Bareily Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots No |
| 2 | Boundary Wall With RCC Framed Structure |
| 3 | Road Work Bituminous Road |
| 4 | Footpaths No |
| 5 | Water Supply Including Drinking Water Facilities PVC Pipe and OHT |
| 6 | Sewer System RCC Hume Pipe |
| 7 | Drain Brick work drain |
| 8 | Parks Earth filling and Boundary wall with gate |
| 9 | Tree Planting No |
| 10 | Design For Electric Supply Including Street Lighting Street Light and LT line with cable |
| 11 | Community Buildings No |
| 12 | Treatment and Disposal System of Sewage and Sullage water No |
| 13 | Solid Waste Management And Disposal System No |
| 14 | Water Conservation System No |
| 15 | Energy Management System Including Use of Renewable Energy No |
| 16 | Fire Protection And Fire Safety System No |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services No |
| 18 | Emergency Evacuation Services No |
| 19 | Other Miscellaneous Work No |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 2 Aug 2026.
Sanctioned by Bareily Development Authority · 90,857 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 004Part/2021 | 3 Aug 2021 | 2 Aug 2026 | 9 Aug 2029 | 30 Jun 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 2 Aug 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2026 | 2 Aug 2026 | — |
Land & documents
14 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 529 to 538, 543 to 558, 566, 577, 578, 579, 596 to 604, 610, 611, 612, 614, 615, 622P, 623, 624, 625P, 626P, 629 to 633, 658, 661, 673, 675, 676, 677, 678, 680, 681, 682, 684, 688, 690 to 694 | 90857 | Khasra |
| Khatauni extract · 1415-1420 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 16 Sept 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 16 Sept 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 16 Sept 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 16 Sept 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 16 Sept 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 16 Sept 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 16 Sept 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 16 Sept 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Sept 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 17 Sept 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 17 Sept 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 17 Sept 2021 ↗ |
Quarterly progress reports
19 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
19 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 98.12% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Bareilly Development Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM18199 |
| PAN | AAALB0169K |
| CIN / TAN | LKNB05448C |
| Registered address | Vikas Jyoti Complex, Pyiyadarshini Nagar, Bareilly - 243122 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Bareilly Development Authority RGN Sec-4 Alakhnanda EnclaveBankState Bank of IndiaBranchAyub Khan Chauraha BranchBranch addressAyub Khan Chauraha BareillyBranch districtBareillyA/C no.IFSCSBIN0015544 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | BDA RGN Sector-4 Alakhnanda Enclave Separate AccountBankState Bank of IndiaBranchAyub Khan Chauraha BranchBranch addressAyub Khan Chauraha BareillyBranch districtBareillyA/C no.IFSCSBIN015544 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | BDA RGN Sector-4 Alakhnanda Enclave Transaction AccountBankState Bank of IndiaBranchAyub Khan Chauraha BranchBranch addressAyub Khan Chauraha BareillyBranch districtBareillyA/C no.IFSCSBIN0015544 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Revised completion date on file | 2026-06-30 → 2026-08-02 changed in Estanzo’s record | 7 Oct 2026 |
| Revised completion date on file | changed in Estanzo’s record · 7 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about RGN Sector 4 Alakhnanda Enclave
Is RGN Sector 4 Alakhnanda Enclave RERA registered?
Yes. RGN Sector 4 Alakhnanda Enclave is registered with UPRERA under registration number UPRERAPRJ801806, registered on 26 Oct 2021. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for RGN Sector 4 Alakhnanda Enclave?
The completion date filed with UPRERA is 2 Aug 2026. No completion certificate is on record yet.
Who is the builder of RGN Sector 4 Alakhnanda Enclave?
Bareilly Development Authority is the promoter entity that filed RGN Sector 4 Alakhnanda Enclave with UPRERA (promoter RERA ID UPRERAPRM18199). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted RGN Sector 4 Alakhnanda Enclave more time to complete?
UPRERA's record carries 1 completion extension for RGN Sector 4 Alakhnanda Enclave, the latest running to 2 Aug 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does RGN Sector 4 Alakhnanda Enclave have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RGN Sector 4 Alakhnanda Enclave located?
RGN Sector 4 Alakhnanda Enclave is registered in Bareilly, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗