RIDGE RESIDENCY is a RERA-registered residential project by Today Homes Noida Pvt. Ltd. in Gautam Budh Nagar (RERA ID UPRERAPRJ3075). RERA status: NCLT (since 20 Aug 2018). Data as reported by UP-RERA. as reported by UPRERA
RERA status as reported: NCLT.Basic details
Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3075 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | NCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 11 Jan 2012 |
| Original start | 30 Aug 2010 |
| Project duration | 120 |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Coordinates | 28.495, 77.39805555555556 |
| Applicant type | Company |
| Applicant address | 1.AJAY SOOD B-19,DDA FLATS, MATA SUNDRI ROAD, NEAR MINTOO ROAD, DARYA GANJ NEW DELHI-110002 2. |
| Applicant contact | 8130796906 · scupadhyay@todayhomes.co.in |
Registration & timeline
Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.
| RERA registered | 9 Aug 2017 |
| Promised completion | 30 Jun 2021 |
| Revised completion | 29 Dec 2021 |
| Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹2,65,000 |
| Sanctioning authority | Noida Authority |
| NCLT order date | 20 Aug 2018 |
Inventory
derived from unit plan
The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.
- OTHER904 50%
- 2 BHK574 32%
- 3 BHK286 16%
- 4 BHK45 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 574 | 53-59 |
| OTHER | 904 | 66-94 |
| 4 BHK | 45 | 120-126 |
| 3 BHK | 286 | 80-80 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 2 BHK, OTHER | 24 | 190 | 59-66 |
| B · 4 BHK | 15 | 45 | 120-126 |
| C · 3 BHK | 15 | 60 | 80 |
| D · 3 BHK, OTHER | 15 | 60 | 75-94 |
| E · 3 BHK, OTHER | 15 | 60 | 75-94 |
| F · 3 BHK | 15 | 60 | 80 |
| G · 3 BHK, OTHER | 15 | 60 | 80-89 |
| H · 3 BHK, OTHER | 15 | 58 | 80-89 |
| I · 2 BHK, OTHER | 15 | 120 | 59-66 |
| J · 2 BHK, OTHER | 24 | 190 | 59-66 |
| K · OTHER | 17 | 68 | 66 |
| L · 2 BHK, OTHER | 17 | 136 | 59-66 |
| M · 2 BHK, OTHER | 17 | 136 | 59-66 |
| N · 2 BHK, OTHER | 12 | 96 | 53-66 |
| O · 2 BHK, OTHER | 12 | 96 | 53-66 |
| P · 2 BHK, OTHER | 24 | 190 | 59-66 |
| Q · 3 BHK, OTHER | 23 | 92 | 80-89 |
| R · OTHER | 23 | 92 | 66 |
Project team & development works
The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots completed |
| 2 | Boundary Wall completed |
| 3 | Road Work 55% work completed and remaining work in progress |
| 4 | Footpaths 25% work completed and remaining work in progress |
| 5 | Water Supply Including Drinking Water Facilities 70% work completed and remaining work in progress |
| 6 | Sewer System 90% work completed and remaining work in progress |
| 7 | Drain 30% work completed and remaining work in progress |
| 8 | Parks 25% work completed and remaining work in progress |
| 9 | Tree Planting 25% work completed and remaining work in progress |
| 10 | Design For Electric Supply Including Street Lighting 60% work completed and remaining work in progress |
| 11 | Community Buildings work in progress |
| 12 | Treatment and Disposal System of Sewage and Sullage water Not applicable |
| 13 | Solid Waste Management And Disposal System Not applicable |
| 14 | Water Conservation System 60% work completed and remaining work in progress |
| 15 | Energy Management System Including Use of Renewable Energy Not applicable |
| 16 | Fire Protection And Fire Safety System 50% work completed and remaining work in progress |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services work in progress |
| 18 | Emergency Evacuation Services work in progress |
| 19 | Other Miscellaneous Work 50% work completed and remaining work in progress |
Registered agents
3 agents
Agents the promoter filed against this project. Being listed is a filing, not a recommendation, and RERA does not state here whether a registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED) | UPRERAAGT11569 |
| 2 | Earth Homes Pvt. Ltd | UPRERAAGT11244 |
| 3 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
Permits & extensions
0 permits
A permit shows an approval and the date it runs to, not that work matching it has been done.
Sanctioned by Noida Authority · 51,902 sqm of land · an approved plan of 18 blocks and 1809 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Document | File |
|---|---|
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 Dec 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2021 | 29 Dec 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
15 filings
What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-01, SECTOR -135, NOIDA | 51902 SQ.MTS | — |
| GH-01 | 51902 | Khasra |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 18 Nov 2009.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 7354, Book No.1, Vol No. 2591, Pages Nos. 36 to 71 | 18 Nov 2009 | self | — |
| Lease deed · 7354,Book No. 1, Vol No. 2591, Pages Nos. 36 to 71 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 22 Feb 2018 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 22 Feb 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 22 Feb 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 22 Feb 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 22 Feb 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 22 Feb 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 22 Feb 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 22 Feb 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 22 Feb 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 22 Feb 2018 ↗ |
Facilities
as declared to RERA
What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | WORK IN PROGRESS |
| Fire safety (as filed with RERA) | WORK IN PROGRESS |
| Health service | WORK IN PROGRESS |
| Renewable energy | NOT APPLICABLE |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Data as reported by UPRERAPromoter (SPV) details
The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.
| Legal name | Today Homes Noida Pvt. Ltd. |
| Role | primary · current |
| RERA ID | UPRERAPRM1398 |
| PAN | AADCT2595B |
| CIN / TAN | U70109DL2009PTC194189 |
| Name of chairman | 1. AJAY SOOD 2. DINESH KUMAR |
| Registered address | 1.AJAY SOOD B-19,DDA FLATS, MATA SUNDRI ROAD, NEAR MINTOO ROAD, DARYA GANJ NEW DELHI-110002 2. |
| RERA contact | scupadhyay@todayhomes.co.in · 8130796906 |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | TODAYHOMES NOIDA PVT. LTDBankYES BANKBranchJANPATHA/C no.13663700000914IFSCYESB0000136 |
What has changed on this record
nothing recorded yet
A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about RIDGE RESIDENCY
Is RIDGE RESIDENCY RERA registered?
Yes. RIDGE RESIDENCY is registered with UPRERA under registration number UPRERAPRJ3075, registered on 9 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for RIDGE RESIDENCY?
The completion date filed with UPRERA is 29 Dec 2021. No completion certificate is on record yet.
Who is the builder of RIDGE RESIDENCY?
Today Homes Noida Pvt. Ltd. is the promoter entity that filed RIDGE RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM1398). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted RIDGE RESIDENCY more time to complete?
UPRERA's record carries 1 completion extension for RIDGE RESIDENCY, the latest running to 29 Dec 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does RIDGE RESIDENCY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RIDGE RESIDENCY located?
RIDGE RESIDENCY is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in RIDGE RESIDENCY?
The unit plan filed with UPRERA lists 2 BHK, OTHER, 4 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in RIDGE RESIDENCY?
The approved unit plan filed with UPRERA runs from 53 to 126 m² of carpet area (about 571 to 1,352 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in RIDGE RESIDENCY?
The approved unit plan describes 18 blocks and 1,809 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is RIDGE RESIDENCY?
About 141 units per acre: 1,809 planned units across 12.83 acres (51,902 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 17 Aug 2026. official source ↗