RIDGE RESIDENCY

UPRERANCLTRERA data as of 17 Aug 2026

RIDGE RESIDENCY is a RERA-registered residential project by Today Homes Noida Pvt. Ltd. in Gautam Budh Nagar (RERA ID UPRERAPRJ3075). RERA status: NCLT (since 20 Aug 2018). Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: NCLT.
Project cost
698
Land area
51,902 12.83 acres
Units (from plan)
1,809
Density (derived)
141 /acre
Towers (from plan)
18
Config
2 BHK/3 BHK/4 BHK/OTHER
Carpet
53-126
Registered
9 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3075
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start11 Jan 2012
Original start30 Aug 2010
Project duration120
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Coordinates28.495, 77.39805555555556
Applicant typeCompany
Applicant address1.AJAY SOOD B-19,DDA FLATS, MATA SUNDRI ROAD, NEAR MINTOO ROAD, DARYA GANJ NEW DELHI-110002 2.
Applicant contact8130796906 · scupadhyay@todayhomes.co.in

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered9 Aug 2017
Promised completion30 Jun 2021
Revised completion29 Dec 2021
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,65,000
Sanctioning authorityNoida Authority
NCLT order date20 Aug 2018

Inventory

derived from unit plan

The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.

Total units · towers · floors1,809 · 18 · 24 (units from plan)
  • OTHER904 50%
  • 2 BHK574 32%
  • 3 BHK286 16%
  • 4 BHK45 2%
ConfigurationUnitsCarpet area
2 BHK57453-59
OTHER90466-94
4 BHK45120-126
3 BHK28680-80
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, OTHER2419059-66
B · 4 BHK1545120-126
C · 3 BHK156080
D · 3 BHK, OTHER156075-94
E · 3 BHK, OTHER156075-94
F · 3 BHK156080
G · 3 BHK, OTHER156080-89
H · 3 BHK, OTHER155880-89
I · 2 BHK, OTHER1512059-66
J · 2 BHK, OTHER2419059-66
K · OTHER176866
L · 2 BHK, OTHER1713659-66
M · 2 BHK, OTHER1713659-66
N · 2 BHK, OTHER129653-66
O · 2 BHK, OTHER129653-66
P · 2 BHK, OTHER2419059-66
Q · 3 BHK, OTHER239280-89
R · OTHER239266
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
JYOTI SINGHAL
License CA 93 16250
SPACE COMBINE A1 112,2ND FLOOR SAFDARJUNG ENCLAVE PVT. LTD.
Engineer
SANJAY VITHALKAR
SPACE COMBINE A1 112, 2ND FLOOR SAFDARJUNG ENCLAVE PVT. LTD.
Contractor
Mr Ravi Sandhu
G-26,FIRST FLOOR JUNGPURA EXTN. NEW DELHI-110014
Sr.Development work declared to RERA
1Demarcation of Plots
completed
2Boundary Wall
completed
3Road Work
55% work completed and remaining work in progress
4Footpaths
25% work completed and remaining work in progress
5Water Supply Including Drinking Water Facilities
70% work completed and remaining work in progress
6Sewer System
90% work completed and remaining work in progress
7Drain
30% work completed and remaining work in progress
8Parks
25% work completed and remaining work in progress
9Tree Planting
25% work completed and remaining work in progress
10Design For Electric Supply Including Street Lighting
60% work completed and remaining work in progress
11Community Buildings
work in progress
12Treatment and Disposal System of Sewage and Sullage water
Not applicable
13Solid Waste Management And Disposal System
Not applicable
14Water Conservation System
60% work completed and remaining work in progress
15Energy Management System Including Use of Renewable Energy
Not applicable
16Fire Protection And Fire Safety System
50% work completed and remaining work in progress
17Social Infrastructure And Other Public Amenities Including Public Health Services
work in progress
18Emergency Evacuation Services
work in progress
19Other Miscellaneous Work
50% work completed and remaining work in progress
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. Being listed is a filing, not a recommendation, and RERA does not state here whether a registration is still valid.

Sr.AgentRERA registration
1BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
2Earth Homes Pvt. LtdUPRERAAGT11244
3INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

0 permits

A permit shows an approval and the date it runs to, not that work matching it has been done.

Sanctioned by Noida Authority · 51,902 sqm of land · an approved plan of 18 blocks and 1809 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Plans and approvals filed with RERA
DocumentFile
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 29 Dec 2021.

#Granted fromExtended uptoNote
130 Jun 202129 Dec 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

15 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-01, SECTOR -135, NOIDA51902 SQ.MTS
GH-0151902Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 18 Nov 2009.

Registry no.DateTypeArea
7354, Book No.1, Vol No. 2591, Pages Nos. 36 to 7118 Nov 2009self
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 7354,Book No. 1, Vol No. 2591, Pages Nos. 36 to 71
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF
Document checklist
DocumentStatusUploaded
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old22 Feb 2018
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old22 Feb 2018
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old22 Feb 2018
Water supply plan
How the project proposed to supply water, as filed at registration.
Old22 Feb 2018
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old22 Feb 2018
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old22 Feb 2018
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old22 Feb 2018
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old22 Feb 2018
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old22 Feb 2018
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old22 Feb 2018

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterWORK IN PROGRESS
Fire safety (as filed with RERA)WORK IN PROGRESS
Health serviceWORK IN PROGRESS
Renewable energyNOT APPLICABLE

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Data as reported by UPRERA

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameToday Homes Noida Pvt. Ltd.
Roleprimary · current
RERA IDUPRERAPRM1398
PANAADCT2595B
CIN / TANU70109DL2009PTC194189
Name of chairman1. AJAY SOOD 2. DINESH KUMAR
Registered address1.AJAY SOOD B-19,DDA FLATS, MATA SUNDRI ROAD, NEAR MINTOO ROAD, DARYA GANJ NEW DELHI-110002 2.
RERA contactscupadhyay@todayhomes.co.in · 8130796906
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between the coordinates each project filed with RERA. Not a comparison, a ranking or a travel distance.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
TODAYHOMES NOIDA PVT. LTDBankYES BANKBranchJANPATHA/C no.13663700000914IFSCYESB0000136
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about RIDGE RESIDENCY

Is RIDGE RESIDENCY RERA registered?

Yes. RIDGE RESIDENCY is registered with UPRERA under registration number UPRERAPRJ3075, registered on 9 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RIDGE RESIDENCY?

The completion date filed with UPRERA is 29 Dec 2021. No completion certificate is on record yet.

Who is the builder of RIDGE RESIDENCY?

Today Homes Noida Pvt. Ltd. is the promoter entity that filed RIDGE RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM1398). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted RIDGE RESIDENCY more time to complete?

UPRERA's record carries 1 completion extension for RIDGE RESIDENCY, the latest running to 29 Dec 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RIDGE RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RIDGE RESIDENCY located?

RIDGE RESIDENCY is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in RIDGE RESIDENCY?

The unit plan filed with UPRERA lists 2 BHK, OTHER, 4 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RIDGE RESIDENCY?

The approved unit plan filed with UPRERA runs from 53 to 126 m² of carpet area (about 571 to 1,352 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RIDGE RESIDENCY?

The approved unit plan describes 18 blocks and 1,809 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RIDGE RESIDENCY?

About 141 units per acre: 1,809 planned units across 12.83 acres (51,902 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 17 Aug 2026. official source ↗