RISE ORGANIC HOMES PHASE 2 is a RERA-registered residential project by RISE PROJECTS PVT LTD in Ghaziabad (RERA ID UPRERAPRJ4175). Registered with a completion deadline of 28 Dec 2024.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4175 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Sept 2015 |
| Original start | 1 Sept 2015 |
| Project duration | 112 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | 195,Basement,Ram Vihar,Delhi-110092,Delhi,India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
307/MP/Z-5/20
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
2 completion certificates filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Aug 2017 |
| Original completion | 30 Sept 2022 |
| Revised completion | 28 Dec 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 12 Dec 2025 |
| Registration fee | ₹21,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK78 78%
- SHOP22 22%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 78 | 100-122 |
| SHOP | 22 | 14-15 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| COMMERCIAL · SHOP | 2 | 22 | 14-15 |
| T1 · 4 BHK | 20 | 39 | 100-122 |
| T10 · 4 BHK | 20 | 39 | 100-122 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation is done at site |
| 2 | Boundary Wall Boundary wall to be provided as per Bylaws of GDA |
| 3 | Road Work Internal road designed considering Fire tender load |
| 4 | Footpaths 4 feet wide footpath / jogging track to be provided in central garden. |
| 5 | Water Supply Including Drinking Water Facilities 4 feet wide footpath / jogging track to be provided in central garden. |
| 6 | Sewer System Underground System using uPVC(SN-4) Sewer pipes. |
| 7 | Drain Underground System using uPVC(SN-4) pipes. |
| 8 | Parks Central open area over basement slab as per design |
| 9 | Tree Planting As per bylaws of GDA |
| 10 | Design For Electric Supply Including Street Lighting Transformers (Compact Sub station) shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lighting shall be LED based & automatically controlled by astronomical timer and for energy saving, the same shall be selectively controlled by timer as per the time zone |
| 11 | Community Buildings To be provided |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of adiquated capacity shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathway cleaning & excess water shall be discharged into the Municipal Sewer as per site. |
| 13 | Solid Waste Management And Disposal System As per requirement |
| 14 | Water Conservation System Rain Water Harvesting facilities shall be provided & treated sewage water shall be recycled to the extent feasible. |
| 15 | Energy Management System Including Use of Renewable Energy Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/ power supply company. |
| 16 | Fire Protection And Fire Safety System Fire tender path shall be provided as per NBC. Fire fighting system along with pumps & water storage tanks shall be provided as per NBC & NOC from Fire Department. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Fire escape staircase provided in Each tower as per Fire NOC. |
| 19 | Other Miscellaneous Work As per requirement. |
Registered agents
3 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 2 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 3 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 14 May 2020. 1 of them carries a revalidation, valid to 13 May 2023.
Sanctioned by Ghaziabad Development Authority · 3,284 sqm of land · an approved plan of 3 blocks and 100 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 52/MP/2015 | 15 May 2015 | 14 May 2020 | 14 May 2023 | 30 Sept 2022 | — | |
| 52/MP/2015 | 15 May 2015 | 14 May 2020 | 13 May 2023 | 30 Sept 2022 | 18 Jun 2020 valid to 13 May 2023 as 307/MP/Z-5/20 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 28 Dec 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Sept 2022 | 29 Mar 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 29 Mar 2023 | 28 Dec 2024 | — |
Land & documents
80 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1522 | 500 | — |
| 1528 | 980 | — |
| 1529 | 3982 | — |
| 1530 | 2751.9 | — |
| 1534 | 60 | — |
| 1536 | 6798 | — |
| 1537 | 972 | — |
| 1538 | 1492 | — |
| 1527/2 | 980 | — |
| 1534/2 | 760 | — |
| 1534/3D | 760 | — |
| 731M | 1010 | — |
| 731U | 1010 | — |
| 1528 | 980 | Khasra |
| 1529 | 3982 | Khasra |
| 731M | 1010 | Khasra |
36 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 29 May 2015.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 3577 | 29 May 2015 | other | — |
| 3581 | 29 May 2015 | other | — |
| 3582 | 29 May 2015 | other | — |
| 3583 | 29 May 2015 | other | — |
| 3585 | 29 May 2015 | other | — |
| 3588 | 29 May 2015 | other | — |
| 3589 | 29 May 2015 | other | — |
| 3591 | 29 May 2015 | other | — |
| 3593 | 29 May 2015 | other | — |
| 3596 | 29 May 2015 | other | — |
| 3597 | 29 May 2015 | other | — |
| 3599 | 29 May 2015 | other | — |
| 3600 | 29 May 2015 | other | — |
| 3652 | 2 Jun 2015 | other | — |
| 3654 | 2 Jun 2015 | other | — |
| 3653 | 2 Jun 2015 | other | — |
| 3655 | 2 Jun 2015 | other | — |
| 3656 | 2 Jun 2015 | other | — |
| 3657 | 2 Jun 2015 | other | — |
| 3658 | 2 Jun 2015 | other | — |
| 3659 | 2 Jun 2015 | other | — |
| 3660 | 2 Jun 2015 | other | — |
| 3661 | 2 Jun 2015 | other | — |
| 3662 | 2 Jun 2015 | other | — |
| 3663 | 2 Jun 2015 | other | — |
| 3738 | 4 Jun 2015 | other | — |
| 3740 | 4 Jun 2015 | other | — |
| 4600 | 13 Jul 2015 | other | — |
| 4599 | 13 Jul 2015 | other | — |
| 4601 | 13 Jul 2015 | other | — |
| 4596 | 13 Jul 2015 | other | — |
| 4598 | 13 Jul 2015 | other | — |
| 7591 | 1 Dec 2015 | self | — |
| 7592 | 1 Dec 2015 | self | — |
| 982 | 15 Feb 2016 | self | — |
| 979 | 15 Feb 2016 | self | — |
| Registry document · 3577 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3578 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3581 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3582 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3583 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3585 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3585 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3588 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3589 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3591 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3593 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3596 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3597 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3599 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3600 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3652 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3653 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3654 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3655 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3656 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3657 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3658 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3659 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3660 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3661 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3662 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3663 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3738 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3740 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4596 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4598 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4598 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4599 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4600 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4601 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 5 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 5 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 5 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 5 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 25 Oct 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Renewable energy | YES |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
15 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
15 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RISE PROJECTS PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4132 |
| PAN | AAFCB3687G |
| CIN / TAN | U70102DL2013PTC247954 |
| Name of chairman | VAIBHAV JAIN |
| Registered address | 195,Basement,Ram Vihar,Delhi-110092,Delhi,India |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Rise Projects Pvt. Ltd.BankICICI BankBranchLohia Nagar, GhaziabadBranch addressLohia Nagar, Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0006955 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | RISE PROJECTS PVT LTDBankKOTAK MAHINDRA BANKBranchNARIMAN POINT,MUMBAIBranch addressII 5C MITTAL COURT 224 NARIMAN POINT,MUMBAIBranch districtGhaziabad, Uttar PradeshA/C no.IFSCKKBK0000958 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Rise Projects Pvt. Ltd.BankICICI BankBranchLohia Nagar, GhaziabadBranch addressLohia Nagar, Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0006955 |
What has changed on this record
9 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 331 (Under Registration - 7 ) → 331 (Under Registration - 4 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 330 (Under Registration - 7 ) → 331 (Under Registration - 7 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 330 (Under Registration - 8 ) → 330 (Under Registration - 7 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 329 (Under Registration - 7 ) → 330 (Under Registration - 8 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 329 (Under Registration - 8 ) → 329 (Under Registration - 7 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 328 (Under Registration - 7 ) → 329 (Under Registration - 8 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 328 (Under Registration - 8 ) → 328 (Under Registration - 7 ) changed in Estanzo’s record | 13 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 326 (Under Registration - 7 ) → 328 (Under Registration - 8 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 325 (Under Registration - 6 ) → 326 (Under Registration - 7 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 9 movements on record |
Common questions about RISE ORGANIC HOMES PHASE 2
Is RISE ORGANIC HOMES PHASE 2 RERA registered?
Yes. RISE ORGANIC HOMES PHASE 2 is registered with UPRERA under registration number UPRERAPRJ4175, registered on 1 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has RISE ORGANIC HOMES PHASE 2 been completed?
UPRERA still lists RISE ORGANIC HOMES PHASE 2 as Registered, so it is not shown as completed here. A completion certificate dated 12 Dec 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of RISE ORGANIC HOMES PHASE 2?
RISE PROJECTS PVT LTD is the promoter entity that filed RISE ORGANIC HOMES PHASE 2 with UPRERA (promoter RERA ID UPRERAPRM4132). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted RISE ORGANIC HOMES PHASE 2 more time to complete?
UPRERA's record carries 2 completion extensions for RISE ORGANIC HOMES PHASE 2, the latest running to 28 Dec 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does RISE ORGANIC HOMES PHASE 2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RISE ORGANIC HOMES PHASE 2 located?
RISE ORGANIC HOMES PHASE 2 is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in RISE ORGANIC HOMES PHASE 2?
The unit plan filed with UPRERA lists 4 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in RISE ORGANIC HOMES PHASE 2?
The approved unit plan filed with UPRERA runs from 14 to 122 m² of carpet area (about 149 to 1,316 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in RISE ORGANIC HOMES PHASE 2?
The approved unit plan describes 3 blocks and 100 units of which 78 are homes and 22 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is RISE ORGANIC HOMES PHASE 2?
About 123 units per acre: 100 planned units across 0.81 acres (3,284 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗