RPS07/2023

UPRERARegistered

RPS07/2023 is a RERA-registered residential project by Yamuna Expressway Industrial devlopment Authority in Gautam Budh Nagar (RERA ID UPRERAPRJ563740). Registered with a completion deadline of 30 Nov 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jul–Sep 2025
Quarters shown are calendar quarters. UP-RERA files them by financial year.
0%Q4'23
0%Q1'24
0%Q2'24
0%Q3'24
0%Q4'24
0%Q1'25
0%Q2'25
0%Q3'25

Construction stayed at 0% across 8 consecutive filed quarters (Oct–Dec 2023 to Jul–Sep 2025). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ563740
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start1 Dec 2023
Project duration60 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompetent authority
Applicant address1st Floor , Commercial Complex , Block-P2, Sec- Omega 1, Greater Noida - 201308
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLNG/DS-11/N-30-31-32

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered7 Aug 2023
Original completion30 Nov 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹17,95,500
Sanctioning authorityYamuna Expressway Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AKANSHA NIGAM
License CA/2011/51392
1 ST FLOOR, COMMERCIAL COMPLEX, BLOCK-P2, SECTOR-OMEGA 1, GREATER NOIDA 201308
Engineer
A. K. SAXENA
1ST FLOOR, COMMERCIAL COMPLEX, BLOCK-P2, SECTOR-OMEGA 1, GREATER NOIDA 201308
Contractor
YEIDA
1 ST FLOOR, COMMERCIAL COMPLEX, BLOCK-P2, SECTOR- OMEGA 1, GREATER NOIDA 201308
Sr.Development work declared to RERA
1Demarcation of Plots
AFTER DEVELOPMENT WORK, aUTHORITY WILL DEMARCATE THE ALL PLOTS.
2Boundary Wall
AFTER DEVELOPMENT WORK, AUTHORITY WILL PROVIDE BOUNDARY WALL IN THAT SECTOR.
3Road Work
AUTHORITY WILL PROVIDE ROADS IN FRONT OF EVERY PLOTS IN THAT WHOLE SECTOR. AS PER NORMS AUTHORITY WILL PROVIDE ROADS OF BITUMINOUS CONCRETE.
4Footpaths
AUTHORITY WILL PROVIDE FOOTPATHS IN THE PLOTS IN THAT WHOLE SECTOR.
5Water Supply Including Drinking Water Facilities
AUTHORITY WILL PROVIDE WATER FACILITIES THROUGH OVER HEAD TANK (OHT) IN EVERY PLOTS IN THAT WHOLE SECTOR.
6Sewer System
AUTHORITY WILL PROVIDE A CHAMBER AND MANHOLE IN PLOTS IN THAT WHOLE SECTOR.
7Drain
AUTHORITY WILL PROVIDE A BETTER DRAINAGE SYSTEM IN THAT WHOLE SECTOR.
8Parks
AUTHORITY WILL PROVIDE A PARKS ACCORDING TO THE LAYOUT PLAN AND PLANT THE TREES IN THAT WHOLE SECTOR.
9Tree Planting
AUTHORITY WILL PROVIDE PLANTATION ACCORDING TO THE LAYOUT PLAN AND PLANT THE TREES IN THAT WHOLE SECTOR
10Design For Electric Supply Including Street Lighting
AUTHORITY WILL PROVIDE STREET LIGHTING ACCORDING TO THE ELECTRIC SUPPLY LAYOUT OF THE SECTOR.
11Community Buildings
COMMUNITY BUILDING WILL BE PROVIDED AT SECTOR LEVEL FOR FACILITY PURPOSE.
12Treatment and Disposal System of Sewage and Sullage water
AUTHORITY WILL PROVIDE TREATMENT AND DISPOSAL SYSTM AND SULLAGE WATER AS PER THE SERVICES LAYOUT
13Solid Waste Management And Disposal System
AUTHORITY WILL DEVELOP A SOLID WASTE MANAGEMENT SYSTEM AND DISPOSAL SYSTEM AS PER THE SERVICES LAYOUT
14Water Conservation System
AUTHORITY WILL DEVELOP A WATER CONSERVATION SYSTEM AS PER SERVICE LAYOUT
15Energy Management System Including Use of Renewable Energy
IF NEEDED THEN THE PROVISION SHALL BE MADE FOR ENERGY MANAGEMENT SYSTEM
16Fire Protection And Fire Safety System
FIRE PROTECTION AND FIRE SAFETY SYSTEM SHALL BE DEVELOPED AND EXECUTED ON THE SITE
17Social Infrastructure And Other Public Amenities Including Public Health Services
FACILITIES ARE PLANNED FOR SECTORS
18Emergency Evacuation Services
IF NEEDED THE EMERGENCY EVACUATION SERVICES WILL BE DEVELOPED
19Other Miscellaneous Work
WHEN REQUIRED THE OTHER IMPORTANT FACILITIES AND SERVICES WILL BE PLANNED
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 17 Jul 2028.

Sanctioned by Yamuna Expressway Authority · 3,58,040 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLNG/DS-11/N-30-31-3218 Jul 202317 Jul 202817 Jul 203330 Nov 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1494, 1507, 1519, 1520, 1521, 1522, 1523, 1524, 1525, 1526, 1527, 1528, 1529, 1548, 1555, 1556, 1561, 1574, 1575, 1576, 1577, 1578, 1579, 1580, 1607, 1608, 1610, 1648, 1980, 1691, 1692, 1693, 1694, 1695, 1696, 1697, 1698, 1699, 1700, 1701, 1702, 1703, 1704, 1705, 1706, 1707, 1708, 1718, 1720, 1721, 1722, 1723, 1724, 1729, 1730, 1731, 1732, 1733, 1737, 1738, 1739, 1752, 1753, 1754, 1755, 1756, 1757, 1655, 1656, 1657, 1658, 1659, 1660, 1661, 1662, 1663, 1664, 1665, 1666, 1667, 1668, 1671, 1672, 1673, 1649, 1634, 1635, 1636, 1642, 1643, 1644, 1645, 1646, 1647, 1620, 1621, 1648, 1700, 1709, 1710, 1711, 1712, 1717, 1717, 1719, 1720, 1721358040Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1424-1436
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1234
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New19 Jul 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New19 Jul 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New19 Jul 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New19 Jul 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New26 Jul 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New19 Jul 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New19 Jul 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New19 Jul 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New19 Jul 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New19 Jul 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New19 Jul 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New19 Jul 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Jul 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New20 Jul 2023 ↗

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2025-Q2.

QuarterConstructionCertificates
2023-Q30%CA ↗ · Arch ↗ · Eng ↗
2023-Q40%CA ↗ · Arch ↗ · Eng ↗
2024-Q10%CA ↗ · Arch ↗ · Eng ↗
2024-Q20%CA ↗ · Arch ↗ · Eng ↗
2024-Q30%CA ↗ · Arch ↗ · Eng ↗
2024-Q40%CA ↗ · Arch ↗ · Eng ↗
2025-Q10%CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameYamuna Expressway Industrial devlopment Authority
RolePromoter · current
RERA IDUPRERAPRM14529
PANAAALT0341D
CIN / TANMRTT00283D
Registered address1st Floor , Commercial Complex , Block-P2, Sec- Omega 1, Greater Noida - 201308
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY COLLECTION ACCOUNT FOR RPS07/2023BankICICIBranchICICI BANK LTD., OMEGA 1, GREATER NOIDABranch addressOMEGA 1Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0002183
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY SEPERATE BANK FOR RPS07/2023BankICICI BANKBranchICICI BANK LTD., OMEGA 1, GREATER NOIDABranch addressOMEGA 1Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0002183
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY RERA TRANSACTION ACCOUNT RPS07/2023BankICICI BANKBranchICICI BANK LTD., OMEGA 1, GREATER NOIDABranch addressOMEGA 1, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0002183
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

6 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)337 (Under Registration - 1 ) → 338 (Under Registration - 2 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)336 (Under Registration - 0 ) → 337 (Under Registration - 1 )
changed in Estanzo’s record
3 Oct 2026
Promoter’s complaints tally (all their projects)336 (Under Registration - 1 ) → 336 (Under Registration - 0 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)336 (Under Registration - 3 ) → 336 (Under Registration - 1 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)335 (Under Registration - 2 ) → 336 (Under Registration - 3 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)334 (Under Registration - 1 ) → 335 (Under Registration - 2 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 15 Oct 2026 · 6 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about RPS07/2023

Is RPS07/2023 RERA registered?

Yes. RPS07/2023 is registered with UPRERA under registration number UPRERAPRJ563740, registered on 7 Aug 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RPS07/2023?

The completion date filed with UPRERA is 30 Nov 2028. No completion certificate is on record yet.

Who is the builder of RPS07/2023?

Yamuna Expressway Industrial devlopment Authority is the promoter entity that filed RPS07/2023 with UPRERA (promoter RERA ID UPRERAPRM14529). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does RPS07/2023 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RPS07/2023 located?

RPS07/2023 is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗