RPS09/2025 is a RERA-registered residential project by Yamuna Expressway Industrial devlopment Authority in SECTOR-18,YEIDA, Gautam Budh Nagar (RERA ID UPRERAPRJ103634). Registered with a completion deadline of 30 Jun 2030.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ103634 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Yamuna Expressway Authority |
| Proposed start | 1 Jul 2025 |
| Project duration | 60 months |
| Address | POCKET-9B, SECTOR-18,YEIDA, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Competent authority |
| Applicant address | 1st Floor , Commercial Complex , Block-P2, Sec- Omega 1, Greater Noida - 201308 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
DS-01PLNG/N-225 TO 227
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 11 Apr 2025 |
| Original completion | 30 Jun 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹5,34,500 |
| Sanctioning authority | Yamuna Expressway Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots For Demarcation of Plots Total Nos. of RCC Tee Post -1104 Nos. Total RCC Demarcation Board-60 Nos. |
| 2 | Boundary Wall Not applicabler |
| 3 | Road Work 12 Mtr wide Road-
Length- 2200 Mtr
Width-5.5 mtr (carriageway)
Thickness of carriageway-layer wise details as follows
(a)1st layer (90mm-45mm stone blast)-10cm
(b) 2nd layer (63 mm-45mm stone blast)-7.5cm
(c) 3rd layer (53mm-22.4mm stone blast) 7.5cm
(d) Top Bituminus layer- mixed seal surface-2.5cm
Total thickness-27.5cm
18 mtre Road-
Lenght 414 mtr
Width-7.00mtr (Carriageway)
Thickness of carriageway-Layer wise details as following-
(a) 1st layer (63mm-45mm stone blast) 10cm
(b) 2nd layer (63mm-45mm stone blast) 7.5cm
(c) 3rd layer (63mm-45mm stone blast) 7.5cm
(d)4rth layer (53mm-22.5mm stone blast) 7.5cm
(e) Top Bituminus layer -Mix seal surface -2.5cm
Total Thickness-35cm
24 mtr wide road
Length-488 mtr
Width-7.00mter (carriageway)
Thickness of carriageway-Layer wise details as follows
(a)1st layer (90mm-45mm stone blast) 10cm
(b) 2nd layer (63mm-45mm stone blast) 7.5cm
(c)3rd layer )63mm-45mm stone blast) 7.5mm
(d) 4rth layer (53mm-22.5mm stone blast) 7.5 cm
(e)Top Bituminus layer -Mix seal surface -2.5cm
Total thickness-35cm
(d) |
| 4 | Footpaths Not applicable |
| 5 | Water Supply Including Drinking Water Facilities Water Supply Line-
(a) 550mtr length in 250mm dia pipe DI (Rising main)
(b) 1200 mtr in 160mm dia PVC Pipe
(c) 1700 mtr length in 110mm dia PVC Pipe |
| 6 | Sewer System Sewer Line-
(a) 2515 mtr length in NP-2, 250mm dia (Hume Pipe)
(b) 348 mter length in NP-3 , 350mm dia (Hume pipe)
(c) 552 mtr length in NP-3 150mm dia (Hume Pipe)
Sewer Main Hole Details-
(a) MH-900mm dia -108 nos
(b) MH- 1200mm Dia -15 Nos.
(c) MH-1500mm dia -15 nos.
(d) Chamber- 276 Nos. |
| 7 | Drain RCC Drain
(a) 600 mter length- 1200mm wide 1800mm debth
(b) 1000 mtr- 900mmwide 1500mm debth
(c) 1100 mter length-600mm wide 1000mm debth
(d)3504 mtr lenght-450mm wide 650mm debth |
| 8 | Parks Total area of grassing in park -13000 sqm
Total nos. of tree planting in parks-500 nos.
Total nos. of shrubs planting in park-1000 nos. |
| 9 | Tree Planting 1164 Nos. Tree planting on road side |
| 10 | Design For Electric Supply Including Street Lighting 2 Nos. of 11/0.415 KV Sub Station
4 Nos. 360 KVA transformer
100 Nos. Street Light Fitting Poles
70 Nos. Main Feeder Pillars Sub Feeder Pillars
14000 mtr LT HT Cable |
| 11 | Community Buildings Not applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer line will be laid under this project which will be connected to the main line which connect to the STP location at Sector 24A |
| 13 | Solid Waste Management And Disposal System Not Applicable |
| 14 | Water Conservation System After handover plots to the allottee, water harvesting system will be construct by individual allottee of all plots as per YEIDA building Bye laws |
| 15 | Energy Management System Including Use of Renewable Energy Not Applicable |
| 16 | Fire Protection And Fire Safety System Not Applicable |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Applicable |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Not Applicable |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 27 Oct 2029.
Sanctioned by Yamuna Expressway Authority · 1,05,870 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| DS-01PLNG/N-225 TO 227 | 28 Oct 2024 | 27 Oct 2029 | 27 Oct 2033 | 30 Jun 2030 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
18 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 297,298,299,300,301,302,303,304,305,306,307,308,309,313,314,315,316,336,337,346,348,349,350,351,352,353,355 | 105869.55 | Khasra |
| Khatauni extract · 2017-2023 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · 00 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 21 Mar 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Feb 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Feb 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Feb 2025 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 6 Feb 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Feb 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Feb 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 28 Feb 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Feb 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Mar 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 20 Mar 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 28 Feb 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 7 Mar 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 5 Apr 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 6 Feb 2025 ↗ |
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Yamuna Expressway Industrial devlopment Authority |
| Role | Promoter · current |
| RERA ID | UPRERAPRM14529 |
| PAN | AAALT0341D |
| CIN / TAN | MRTT00283D |
| Registered address | 1st Floor , Commercial Complex , Block-P2, Sec- Omega 1, Greater Noida - 201308 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | YEIDA COLLECTION BANK ACCOUNT RPS09/2025BankICICI BANKBranchOMEGA-1, GREATER NOIDABranch addressSHOP NO-1, OMEGA-1, P2 SHOPPING COMPLEX, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0002183Branch emailRAVINDER.BHATI@ICICIBANK.COM |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | YEIDA RERA SEPARATE ACCOUNT RPS09/2025BankICICI BANKBranchOMEGA-1, GREATER NOIDABranch addressSHOP NO-1, OMEGA-1, P2 SHOPPING COMPLEX, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0002183 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | YEIDA TRANSACTION ACCOUNT RPS09/2025BankICICI BANKBranchOMEGA-1, GREATER NOIDABranch addressSHOP NO-1, OMEGA-1, P2 SHOPPING COMPLEX, GREATER NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0002183 |
What has changed on this record
7 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 337 (Under Registration - 1 ) → 338 (Under Registration - 2 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 336 (Under Registration - 0 ) → 337 (Under Registration - 1 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 336 (Under Registration - 1 ) → 336 (Under Registration - 0 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 336 (Under Registration - 3 ) → 336 (Under Registration - 1 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 335 (Under Registration - 2 ) → 336 (Under Registration - 3 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 334 (Under Registration - 1 ) → 335 (Under Registration - 2 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 15 Oct 2026 · 6 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about RPS09/2025
Is RPS09/2025 RERA registered?
Yes. RPS09/2025 is registered with UPRERA under registration number UPRERAPRJ103634, registered on 11 Apr 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for RPS09/2025?
The completion date filed with UPRERA is 30 Jun 2030. No completion certificate is on record yet.
Who is the builder of RPS09/2025?
Yamuna Expressway Industrial devlopment Authority is the promoter entity that filed RPS09/2025 with UPRERA (promoter RERA ID UPRERAPRM14529). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does RPS09/2025 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RPS09/2025 located?
RPS09/2025 is registered in SECTOR-18,YEIDA, Gautam Budh Nagar, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗