RUDRA PALACE HEIGHTS

UPRERARegistered

RUDRA PALACE HEIGHTS is a RERA-registered residential project by RUDRA BUILDWELL PROJECTS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ7895). Registered with a completion deadline of 31 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
80.93%Q3'24
80.93%Q4'24
80.93%Q1'25
83.39%Q2'25
62.23%Q3'25
65.72%Q4'25
66%Q1'26
70%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ7895
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Jan 2013
Original start1 Jan 2013
Project duration168 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressREGD. OFF. D 53, OKHLA PHASE-1, NEW DELHI CORP. OFF. A66, SECTOR 63, NOIDA UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    BP3022/GH/FTS/4299

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. valid to

    Permit revalidated

    BP3022/GH/FTS/4299

  7. Building permit sanctioned

    BP3022/GH/FTS/4299

  8. Completion certificate filed

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Aug 2017
Original completion31 Dec 2019
Revised completion31 Dec 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary31 Mar 2026
Registration fee₹1,73,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,434 · 10 · 24 (units from plan)
  • 3 BHK624 44%
  • 1 BHK360 25%
  • 2 BHK312 22%
  • 4 BHK138 10%
ConfigurationUnitsCarpet area
4 BHK138105-127
3 BHK62477-106
1 BHK36034-37
2 BHK31256-86
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A1 · 4 BHK, 3 BHK2313879-127
A2 · 4 BHK, 3 BHK239086-106
A3 · 4 BHK, 3 BHK2314079-127
A4 · 1 BHK2217634
B1 · 3 BHK, 2 BHK2313856-86
B2 · 3 BHK, 2 BHK2313756-86
B3 · 3 BHK, 2 BHK2414156-86
B4 · 3 BHK, 2 BHK2414256-86
B5 · 3 BHK, 2 BHK2414856-79
B6 · 1 BHK2318437
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
DEEPAK MEHTA
License COA/87/10840
PLOT NO-16 MAYUR VIHAR NEW DELHI
Engineer
OPTIMIZATION CONSULTANTS
KARAMPURA NEW DELHI
Contractor
APACE BUILDERS AND CONTRACTORS
GH-02B, SECTOR-01 GREATER NOIDA UP
Sr.Development work declared to RERA
1Demarcation of Plots
NORTH 24M WIDE ROAD, SOUTH- 24 M WIDE ROAD , EAST-GH-02C, WEST GH-02A
2Boundary Wall
As per Building Bye laws in RCC/Brick work and Grill
3Road Work
Tremix/CC/Paver
4Footpaths
Tremix/CC/Paver
5Water Supply Including Drinking Water Facilities
Water to be provided by GNIDA and shall be stored and pumped as per norms.
6Sewer System
STP
7Drain
Rain water to be Harvested as per norm
8Parks
As per Landscape Design and norms
9Tree Planting
As per Landscape Design and norms
10Design For Electric Supply Including Street Lighting
As per MEP Design and norms
11Community Buildings
As per approved plan
12Treatment and Disposal System of Sewage and Sullage water
STP and treated water to be used for Flushing and Gardening as per Norm
13Solid Waste Management And Disposal System
As per norm OWC shall be provided
14Water Conservation System
RWH to be provided
15Energy Management System Including Use of Renewable Energy
Solar Water Heating and Solar energy to be sued as per norms
16Fire Protection And Fire Safety System
As per Norms of Fire Department
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per Norms
18Emergency Evacuation Services
As per norms
19Other Miscellaneous Work
Facilities to be provided as per norms
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 13 Jul 2029. 1 of them carries a revalidation, valid to 13 Jul 2029.

Sanctioned by Greater Noida Authority · 33,538 sqm of land · an approved plan of 10 blocks and 1434 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BP3022/GH/FTS/429921 May 201420 May 201931 Dec 202431 Dec 2019—
BP3022/GH/FTS/429914 Jul 202513 Jul 202913 Jul 202931 Dec 201914 Jul 2025
valid to 13 Jul 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 Dec 2026.

#Granted fromExtended uptoNote
131 Dec 201931 Dec 2026—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-02B SECTOR 1, GREATER NOIDA33538Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1/8344 6184
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Dec 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Sept 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New18 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New13 Oct 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Oct 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Oct 2020 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 May 2022 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Renewable energyYES
Other facilitiesNO

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q180.93%CA ↗ · Arch ↗ · Eng ↗
2020-Q280.93%CA ↗ · Arch ↗ · Eng ↗
2020-Q380.93%CA ↗ · Arch ↗ · Eng ↗
2020-Q480.93%CA ↗ · Arch ↗ · Eng ↗
2021-Q180.93%CA ↗ · Arch ↗ · Eng ↗
2021-Q280.93%CA ↗ · Arch ↗ · Eng ↗
2021-Q380.93%CA ↗ · Arch ↗ · Eng ↗
2021-Q480.93%CA ↗ · Arch ↗ · Eng ↗
2022-Q180.93%CA ↗ · Arch ↗ · Eng ↗
2022-Q280.93%CA ↗ · Arch ↗ · Eng ↗
2022-Q380.93%CA ↗ · Arch ↗ · Eng ↗
2022-Q480.93%CA ↗ · Arch ↗ · Eng ↗
2023-Q180.93%CA ↗ · Arch ↗ · Eng ↗
2023-Q280.93%CA ↗ · Arch ↗ · Eng ↗
2023-Q380.93%CA ↗ · Arch ↗ · Eng ↗
2023-Q480.93%CA ↗ · Arch ↗ · Eng ↗
2024-Q180.93%CA ↗ · Arch ↗ · Eng ↗
2024-Q280.93%CA ↗ · Arch ↗ · Eng ↗
2024-Q380.93%CA ↗ · Arch ↗ · Eng ↗
2024-Q480.93%CA ↗ · Arch ↗ · Eng ↗
2025-Q183.39%CA ↗ · Arch ↗ · Eng ↗
2025-Q262.23%CA ↗ · Arch ↗ · Eng ↗
2025-Q365.72%CA ↗ · Arch ↗ · Eng ↗
2025-Q466%CA ↗ · Arch ↗ · Eng ↗
2026-Q170%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRUDRA BUILDWELL PROJECTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM2688
PANAAECR9589E
CIN / TANU45400DL2010PTC209159
Name of chairmanMUKESH KHURANA
Registered addressREGD. OFF. D 53, OKHLA PHASE-1, NEW DELHI CORP. OFF. A66, SECTOR 63, NOIDA UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameMilan Infrastructures And Developers Private Limit
RoleCo-promoter · current
RERA IDUPRERAPRM11445
Applicant typeCompany
PANAAECM7904J
CIN / TANU70109DL2006PTC150726
Name of chairmanMr. Naveen Tyagi / Mr. Amit Mahajan
Registered addressRegd. Office : 101, 102, A-115, Vakil Chamber, Shakarpur, New Delhi Corporate Office : Commercial P
RERA contact
Registered since2017

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
RBPPL COLLECTION ACCOUNT RUDRA PALACE HEIGHTSBankHDFC BANKBranchC BLOCK SEC-63 NOIDABranch addressPLOT 1-B C BLOCK SEC-63 NOIDA, GAUTAM BUDDH NAGAR NOIDA - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFCO000394Branch emailneeraj.kumar36hdfc.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
RBPPL SEPARATE BANK ACCOUNT FOR RUDRA PALACE HEIGHTSBankHDFC BANKBranchC BLOCK SEC-63 NOIDABranch addressPLOT 1-B C BLOCK SEC-63 NOIDA, GAUTAM BUDDH NAGAR NOIDA - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFCO000394
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
RBPPL RERA TRANSACTION ACCOUNT FOR RUDRA PALACE HEIGHTSBankHDFC BANKBranchC BLOCK SEC-63 NOIDABranch addressPLOT 1-B C BLOCK SEC-63 NOIDA, GAUTAM BUDDH NAGAR NOIDA - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFCO000394
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)240 (Under Registration - 0 ) → 241 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 23 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about RUDRA PALACE HEIGHTS

Is RUDRA PALACE HEIGHTS RERA registered?

Yes. RUDRA PALACE HEIGHTS is registered with UPRERA under registration number UPRERAPRJ7895, registered on 2 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has RUDRA PALACE HEIGHTS been completed?

UPRERA still lists RUDRA PALACE HEIGHTS as Registered, so it is not shown as completed here. A completion certificate dated 31 Mar 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of RUDRA PALACE HEIGHTS?

RUDRA BUILDWELL PROJECTS PRIVATE LIMITED is the promoter entity that filed RUDRA PALACE HEIGHTS with UPRERA (promoter RERA ID UPRERAPRM2688). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted RUDRA PALACE HEIGHTS more time to complete?

UPRERA's record carries 1 completion extension for RUDRA PALACE HEIGHTS, the latest running to 31 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RUDRA PALACE HEIGHTS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RUDRA PALACE HEIGHTS located?

RUDRA PALACE HEIGHTS is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in RUDRA PALACE HEIGHTS?

The unit plan filed with UPRERA lists 4 BHK, 3 BHK, 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RUDRA PALACE HEIGHTS?

The approved unit plan filed with UPRERA runs from 34 to 127 m² of carpet area (about 364 to 1,363 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RUDRA PALACE HEIGHTS?

The approved unit plan describes 10 blocks and 1,434 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RUDRA PALACE HEIGHTS?

About 173 units per acre: 1,434 planned units across 8.29 acres (33,538 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗