RUDRA PALACE HEIGHTS is a RERA-registered residential project by RUDRA BUILDWELL PROJECTS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ7895). Registered with a completion deadline of 31 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ7895 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 1 Jan 2013 |
| Original start | 1 Jan 2013 |
| Project duration | 168 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | REGD. OFF. D 53, OKHLA PHASE-1, NEW DELHI CORP. OFF. A66, SECTOR 63, NOIDA UP |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
BP3022/GH/FTS/4299
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- valid to
Permit revalidated
BP3022/GH/FTS/4299
Building permit sanctioned
BP3022/GH/FTS/4299
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 2 Aug 2017 |
| Original completion | 31 Dec 2019 |
| Revised completion | 31 Dec 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 31 Mar 2026 |
| Registration fee | ₹1,73,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK624 44%
- 1 BHK360 25%
- 2 BHK312 22%
- 4 BHK138 10%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 138 | 105-127 |
| 3 BHK | 624 | 77-106 |
| 1 BHK | 360 | 34-37 |
| 2 BHK | 312 | 56-86 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A1 · 4 BHK, 3 BHK | 23 | 138 | 79-127 |
| A2 · 4 BHK, 3 BHK | 23 | 90 | 86-106 |
| A3 · 4 BHK, 3 BHK | 23 | 140 | 79-127 |
| A4 · 1 BHK | 22 | 176 | 34 |
| B1 · 3 BHK, 2 BHK | 23 | 138 | 56-86 |
| B2 · 3 BHK, 2 BHK | 23 | 137 | 56-86 |
| B3 · 3 BHK, 2 BHK | 24 | 141 | 56-86 |
| B4 · 3 BHK, 2 BHK | 24 | 142 | 56-86 |
| B5 · 3 BHK, 2 BHK | 24 | 148 | 56-79 |
| B6 · 1 BHK | 23 | 184 | 37 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots NORTH 24M WIDE ROAD, SOUTH- 24 M WIDE ROAD , EAST-GH-02C, WEST GH-02A |
| 2 | Boundary Wall As per Building Bye laws in RCC/Brick work and Grill |
| 3 | Road Work Tremix/CC/Paver |
| 4 | Footpaths Tremix/CC/Paver |
| 5 | Water Supply Including Drinking Water Facilities Water to be provided by GNIDA and shall be stored and pumped as per norms. |
| 6 | Sewer System STP |
| 7 | Drain Rain water to be Harvested as per norm |
| 8 | Parks As per Landscape Design and norms |
| 9 | Tree Planting As per Landscape Design and norms |
| 10 | Design For Electric Supply Including Street Lighting As per MEP Design and norms |
| 11 | Community Buildings As per approved plan |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP and treated water to be used for Flushing and Gardening as per Norm |
| 13 | Solid Waste Management And Disposal System As per norm OWC shall be provided |
| 14 | Water Conservation System RWH to be provided |
| 15 | Energy Management System Including Use of Renewable Energy Solar Water Heating and Solar energy to be sued as per norms |
| 16 | Fire Protection And Fire Safety System As per Norms of Fire Department |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services As per Norms |
| 18 | Emergency Evacuation Services As per norms |
| 19 | Other Miscellaneous Work Facilities to be provided as per norms |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 13 Jul 2029. 1 of them carries a revalidation, valid to 13 Jul 2029.
Sanctioned by Greater Noida Authority · 33,538 sqm of land · an approved plan of 10 blocks and 1434 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| BP3022/GH/FTS/4299 | 21 May 2014 | 20 May 2019 | 31 Dec 2024 | 31 Dec 2019 | — | |
| BP3022/GH/FTS/4299 | 14 Jul 2025 | 13 Jul 2029 | 13 Jul 2029 | 31 Dec 2019 | 14 Jul 2025 valid to 13 Jul 2029 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 31 Dec 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2019 | 31 Dec 2026 | — |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-02B SECTOR 1, GREATER NOIDA | 33538 | Plot |
| Lease deed · 1/8344 6184 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 31 Dec 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 27 Sept 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 31 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 18 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 31 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 31 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 31 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Sept 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 18 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 13 Oct 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 13 Oct 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 13 Oct 2020 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 26 May 2022 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
| Renewable energy | YES |
| Other facilities | NO |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 80.93% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 83.39% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 62.23% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 65.72% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 70% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RUDRA BUILDWELL PROJECTS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2688 |
| PAN | AAECR9589E |
| CIN / TAN | U45400DL2010PTC209159 |
| Name of chairman | MUKESH KHURANA |
| Registered address | REGD. OFF. D 53, OKHLA PHASE-1, NEW DELHI CORP. OFF. A66, SECTOR 63, NOIDA UP |
| RERA contact | |
| Registered since | 2017 |
| Legal name | Milan Infrastructures And Developers Private Limit |
| Role | Co-promoter · current |
| RERA ID | UPRERAPRM11445 |
| Applicant type | Company |
| PAN | AAECM7904J |
| CIN / TAN | U70109DL2006PTC150726 |
| Name of chairman | Mr. Naveen Tyagi / Mr. Amit Mahajan |
| Registered address | Regd. Office : 101, 102, A-115, Vakil Chamber, Shakarpur, New Delhi Corporate Office : Commercial P |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | RBPPL COLLECTION ACCOUNT RUDRA PALACE HEIGHTSBankHDFC BANKBranchC BLOCK SEC-63 NOIDABranch addressPLOT 1-B C BLOCK SEC-63 NOIDA, GAUTAM BUDDH NAGAR NOIDA - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFCO000394Branch emailneeraj.kumar36hdfc.bank.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | RBPPL SEPARATE BANK ACCOUNT FOR RUDRA PALACE HEIGHTSBankHDFC BANKBranchC BLOCK SEC-63 NOIDABranch addressPLOT 1-B C BLOCK SEC-63 NOIDA, GAUTAM BUDDH NAGAR NOIDA - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFCO000394 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | RBPPL RERA TRANSACTION ACCOUNT FOR RUDRA PALACE HEIGHTSBankHDFC BANKBranchC BLOCK SEC-63 NOIDABranch addressPLOT 1-B C BLOCK SEC-63 NOIDA, GAUTAM BUDDH NAGAR NOIDA - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFCO000394 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 240 (Under Registration - 0 ) → 241 (Under Registration - 1 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 23 Aug 2026 |
Common questions about RUDRA PALACE HEIGHTS
Is RUDRA PALACE HEIGHTS RERA registered?
Yes. RUDRA PALACE HEIGHTS is registered with UPRERA under registration number UPRERAPRJ7895, registered on 2 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has RUDRA PALACE HEIGHTS been completed?
UPRERA still lists RUDRA PALACE HEIGHTS as Registered, so it is not shown as completed here. A completion certificate dated 31 Mar 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of RUDRA PALACE HEIGHTS?
RUDRA BUILDWELL PROJECTS PRIVATE LIMITED is the promoter entity that filed RUDRA PALACE HEIGHTS with UPRERA (promoter RERA ID UPRERAPRM2688). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted RUDRA PALACE HEIGHTS more time to complete?
UPRERA's record carries 1 completion extension for RUDRA PALACE HEIGHTS, the latest running to 31 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does RUDRA PALACE HEIGHTS have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is RUDRA PALACE HEIGHTS located?
RUDRA PALACE HEIGHTS is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in RUDRA PALACE HEIGHTS?
The unit plan filed with UPRERA lists 4 BHK, 3 BHK, 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in RUDRA PALACE HEIGHTS?
The approved unit plan filed with UPRERA runs from 34 to 127 m² of carpet area (about 364 to 1,363 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in RUDRA PALACE HEIGHTS?
The approved unit plan describes 10 blocks and 1,434 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is RUDRA PALACE HEIGHTS?
About 173 units per acre: 1,434 planned units across 8.29 acres (33,538 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗