Rudra Vindhyadham is a RERA-registered residential project by Newline Mercantile Private Limited in Mirzapur (RERA ID UPRERAPRJ196778). Registered with a completion deadline of 31 Mar 2022.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ196778 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mirzapur-Vindhyanchal Development Authority (SPL. Area) |
| Proposed start | 16 Nov 2015 |
| Original start | 16 Nov 2015 |
| Project duration | 77 months |
| Address | Mirzapur, Mirzapur |
| Tehsil | Mirzapur |
| Applicant type | Company |
| Applicant address | 15/63, Rudra House, Civil Lines, Kanpur - 208001 U.P. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
167/2020-21
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 25 Sept 2021 |
| Original completion | 31 Mar 2022 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 10 Feb 2022 |
| Registration fee | ₹83,500 |
| Sanctioning authority | Mirzapur-Vindhyanchal Development Authority (SPL. Area) |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots This is single Plot shaped having total 1 no. of entry gate and 1 no. of exit gate from the 46 m wide front road. Site is surrounded by other plots of farmers from the three sides. |
| 2 | Boundary Wall 1.8- 2.1m high and 200 mm thick boundary wall designed. Brick work of 9 inches and Rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary. |
| 3 | Road Work Trimix raod will be used as per design suggested by the architect for internal road. |
| 4 | Footpaths All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes. |
| 5 | Water Supply Including Drinking Water Facilities Ground water may also be used. Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity |
| 6 | Sewer System Centralized Sewearge system shall be provided. All sewerage water shall go to STP for treatment. After treatment, water shall be recycled and it will use in gardening , flush tanks and vehicle washing. Overflow from the STP shall connect with Municiple sewerage system in future or a seasonal natural drain running along the site boundary. |
| 7 | Drain Storm water system shall be provided. Storm water from roads and other landscape area shall connect to Storm water drain channel and go to Rain water harvesting Pit for recharging the ground water and overflow shall connect with Municiple drain line |
| 8 | Parks There are many green/ landscape area in front / side of building including green parks, play areas for childrens and different recretional activities. |
| 9 | Tree Planting There are different type of tree plantation is proposed at side in order to maintain greenary and natural view. |
| 10 | Design For Electric Supply Including Street Lighting We have designed the system as per local electricity board and consider centralized transformer, HT panel, LT Panel, STP, Pump room etc |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized Sewerage system shall be provided. All sewerage water shall go to the STP for treatment. After treatment, water shall recycled and it will use in gardening, flush tanks and vehicle washing. Overflow from the STP shall connect with Municiple sewerage system in future or a seasonal natural drain running along with site boundary |
| 13 | Solid Waste Management And Disposal System There are proper garbage collection area provided for the solid waste management, |
| 14 | Water Conservation System A well designed rain water harvesting system shall be provided for the whole building complex to conserve water |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED Lights fitting in external area as well as solar lights. In STP and Pump Room all the equipment shall have energy efficient motor. Terrace will be provided with Solar Voltaic Panels to provide renewable source of energy for common areas in buiding complex. |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Sewerage, Storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewerage shall go to the STP for recycling the water. Storm water for roof, roads and other area shall connect to the storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall connect with municiple drain or a seasonal natural drain running along the site boundary. |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 29 Sept 2025.
Sanctioned by Mirzapur-Vindhyanchal Development Authority (SPL. Area) · 15,627 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 167/2020-21 | 30 Sept 2020 | 29 Sept 2025 | 29 Sept 2028 | 31 Mar 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Plot No. 573, 574, 568, 567/2, 575, 578, 579, 583, 582, 584, 585 and 55, 56, 57, 58/1, 58/2 situated at Mirzapur Kala and Mauza Bathuwa with in Pargana Kantit, Tappa 84, Distt. Mirzapur | 15626.64 | Khasra |
| Registry document · 1439 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Affidavit related to bookings/ sales An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Extract of khautauni An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Development work plan, Electricity Supply Plan, Water supply plan, Waste Disposal Plan An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Khautauni An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Civil court order An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 2 Sept 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 13 Aug 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 13 Aug 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 13 Aug 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 11 Aug 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 11 Aug 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 11 Aug 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 11 Aug 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Aug 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 2 Sept 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 11 Aug 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 11 Aug 2021 ↗ |
Quarterly progress reports
2 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
2 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2021-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Newline Mercantile Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM148213 |
| PAN | AADCN0322L |
| CIN / TAN | U51909UP2008PTC100058 |
| Name of chairman | Anand Kumar Agrawal |
| Registered address | 15/63, Rudra House, Civil Lines, Kanpur - 208001 U.P. |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Mirzapur
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | NMPL- SEPARATE BANK AC FOR RUDRA VINDHYADHAMBankSTATE BANK OF INDIABranchSME MIRZAPURA/C no.IFSCSBIN0063736 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Rudra Vindhyadham
Is Rudra Vindhyadham RERA registered?
Yes. Rudra Vindhyadham is registered with UPRERA under registration number UPRERAPRJ196778, registered on 25 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has Rudra Vindhyadham been completed?
UPRERA still lists Rudra Vindhyadham as Registered, so it is not shown as completed here. A completion certificate dated 10 Feb 2022 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Rudra Vindhyadham?
Newline Mercantile Private Limited is the promoter entity that filed Rudra Vindhyadham with UPRERA (promoter RERA ID UPRERAPRM148213). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Rudra Vindhyadham have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Rudra Vindhyadham located?
Rudra Vindhyadham is registered in Mirzapur, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗