TRIDEV RESIDENCY

UPRERARegistered

TRIDEV RESIDENCY is a RERA-registered residential project by ANJANI REALTORS in Varanasi (RERA ID UPRERAPRJ5701). Registered with a completion deadline of 16 Jul 2021.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5701
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryVaranasi Development Authority
Proposed start31 Dec 2013
Original start1 Jan 2013
Project duration91 months
AddressVaranasi, Varanasi
TehsilVaranasi
Applicant typePartnership Firm
Applicant addressB 31/30, Opposite Ravidas Gate, Lanka Road, Varanasi - 221 005
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    63/11

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion17 Jan 2021
Revised completion16 Jul 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹39,000
Sanctioning authorityVaranasi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors154 · 3 · 10 (units from plan)
  • 3 BHK84 55%
  • 2 BHK70 45%
ConfigurationUnitsCarpet area
3 BHK8481-100
2 BHK7069-83
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · OTHER, 3 BHK, 2 BHK105671-86
2 · OTHER, 3 BHK, 2 BHK105671-86
3 · OTHER, 3 BHK, 2 BHK104269-100
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Kapoor & Associates
License CA/87/10966
Block-2, Flat No. 3, Ashiana Apartment, sidhgiri Bag, Varanasi
Engineer
Sanjeev Gupta
Virat Complex, Mahmoorganj, Varanasi
Contractor
Surendera Prasad
106/47B-13B, Chitaipur, Varanasi
Sr.Development work declared to RERA
1Demarcation of Plots
This is single plot having 1 nos of entry gates on main road and 1 no. gate on side road. Site is having road on two sides Site is surrounded by other plots on other sides
2Boundary Wall
1.80 high boundary wall comprising of rcc columns and beams with brick infill walls shall be provided.
3Road Work
Setbacks between blocks shall be provided with cement concrete / concrete pavers for easy movement of vehicular and pedestrian traffic
4Footpaths
Separate footpaths are not provided. Paver block roads will also act as footpaths.
5Water Supply Including Drinking Water Facilities
Deep borewell shall be used to provide water supply to individual blocks Overhead tanks shall be provided on each building terrace for distribution through gravity. Individual flat owners will install their own RO system.
6Sewer System
Centralized Sewerage system shall be Provided. Provision shall be made for Septic Tank and Soak Pit.Disposal from Soak Pit shall be made in drain
7Drain
Storm water drain shall be provided which shall connect to the main drain
8Parks
Green areas will be provided in the site for recreational purposes
9Tree Planting
"There will be different types of trees povided in site based on local conditions like ashoka etc. "
10Design For Electric Supply Including Street Lighting
We have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back up for common service like External lighting,,Pump room Lift etc.
11Community Buildings
Community activity area shall be provided
12Treatment and Disposal System of Sewage and Sullage water
Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the Sewer system on the main road
13Solid Waste Management And Disposal System
"There will be a proper garbage collection area provided for the solid waste management."
14Water Conservation System
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water
15Energy Management System Including Use of Renewable Energy
We will use LED lights fitting in external area and in Lift and Pump room all the equipment shall have energy efficient motor.
16Fire Protection And Fire Safety System
All the fire norms shall be followed as per approval of fire department
17Social Infrastructure And Other Public Amenities Including Public Health Services
Sewerage ,Storm water and water supply system shall be Provided. Rain water harvesting system shall be provided.Community Hall will be provided
18Emergency Evacuation Services
Balcony will be used for evacuation wherever necessary.Assembly points areas will be demarcated for earthquake and other possible disasters
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 17 Jan 2018.

Sanctioned by Varanasi Development Authority · 6,746 sqm of land · an approved plan of 3 blocks and 154 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
63/1118 Jan 201317 Jan 201817 Jan 202117 Jan 2021
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 16 Jul 2021.

#Granted fromExtended uptoNote
117 Jan 202116 Jul 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

31 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Part of 35,36,37 & 38/245370 Sq. Feet—
Part of 38/14787 Sq. Feet—
Part of 32 & 33/15440 Sq. Feet—
Part of 35,36,37 & 38/24537 Sq. Feet—
Part of 32 & 33/18422 Sq. Feet—
Part of 35,36,37 & 38/24537 Sq. Feet—
part of 38/1445Khasra
part of 32 & 33/1505Khasra
part of 32 & 33/1783Khasra
part of 35,36,37 & 38/2422Khasra
part of 35,36,37 & 38/2422Khasra
part of 35,36,37 & 38/24217Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

6 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 8 Oct 2009.

Registry no.DateTypeArea
43968 Oct 2009other—
195225 Apr 2011other—
374 Jan 2012other—
671115 Oct 2010self—
41496 Aug 2011self—
605323 Aug 2010self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 6711
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4149
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6053
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4396
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1952
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 37
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · 63\11
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Khatauni extract · 1420- 1425
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Jan 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jan 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jan 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jan 2019 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old30 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old30 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old30 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs per Sanction Plan
Fire safety (as filed with RERA)As per Sanction Plan
Health serviceAs per Sanction Plan
Renewable energyAs per Sanction Plan
Other facilitiesAs per Sanction Plan

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANJANI REALTORS
RolePromoter · current
RERA IDUPRERAPRM11168
PANAARFA0733B
CIN / TANALDA02412E
Registered addressB 31/30, Opposite Ravidas Gate, Lanka Road, Varanasi - 221 005
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Varanasi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ANJANI REALTORS TRIDEV RESIDENCY MS C ACBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCHDFC0001465
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ANJANI REALTORSBankICICI BANK LTDBranchLANKABranch addressDURGAKUND ROAD, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCICIC0002179
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ANJANI REALTORSBankHDFC BANKBranchLANKA BRANCHBranch addressD-30/2, A-1, MADAN MOHAN MALVIYA MARG, LANKA, VARANASIBranch districtVaranasi, Uttar PradeshA/C no.IFSCHDFC0001465
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about TRIDEV RESIDENCY

Is TRIDEV RESIDENCY RERA registered?

Yes. TRIDEV RESIDENCY is registered with UPRERA under registration number UPRERAPRJ5701, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for TRIDEV RESIDENCY?

The completion date filed with UPRERA is 16 Jul 2021. No completion certificate is on record yet.

Who is the builder of TRIDEV RESIDENCY?

ANJANI REALTORS is the promoter entity that filed TRIDEV RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM11168). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted TRIDEV RESIDENCY more time to complete?

UPRERA's record carries 1 completion extension for TRIDEV RESIDENCY, the latest running to 16 Jul 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does TRIDEV RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is TRIDEV RESIDENCY located?

TRIDEV RESIDENCY is registered in Varanasi, as filed with UPRERA.

What configurations are available in TRIDEV RESIDENCY?

The unit plan filed with UPRERA lists OTHER, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in TRIDEV RESIDENCY?

The approved unit plan filed with UPRERA runs from 69 to 100 m² of carpet area (about 746 to 1,074 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in TRIDEV RESIDENCY?

The approved unit plan describes 3 blocks and 154 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is TRIDEV RESIDENCY?

About 92 units per acre: 154 planned units across 1.67 acres (6,746 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗