SAGA HABITAT

UPRERAAbeyance

SAGA HABITAT is a RERA-registered residential project by ZENITH TOWNSHIP PVT. LTD. in Meerut (RERA ID UPRERAPRJ11609). RERA status: Abeyance.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Abeyance.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ11609
Project categoryResidential
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMeerut Development Authority
Proposed start1 Dec 2012
Original start29 Jan 2010
Project duration64 months
AddressMeerut, Meerut
TehsilMeerut
Applicant typeCompany
Applicant addressRegistered Office Addrss- B-67, Sarita Vihar, New Delhi-110076, Corporate Office Address- C-20/1A/4, Sector-62, Noida, UP-201301, Site Address- Khasra No. 581, 586, 660, 661,662, 665,666/2 & 677/3, Village- Khadauli, Bypass Road, Meerut, U.P .
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Registered with RERA

  3. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  4. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Abeyance. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Aug 2017
Original completion31 Mar 2018
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,53,500
Sanctioning authorityMeerut Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors156 · 6 · 11 (units from plan)
  • 2 BHK120 77%
  • 3 BHK24 15%
  • OTHER12 8%
ConfigurationUnitsCarpet area
OTHER12104
2 BHK12061
3 BHK24104
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A1 · OTHER312104
A2 · 3 BHK312104
A3 · 3 BHK312104
D1 · OTHER, 2 BHK114061
D2 · 2 BHK, OTHER114061
D3 · OTHER, 2 BHK114061
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
NIRBHAYA KUMAR
License CA-2002-29612
880 SECTOR 27 NOIDA
Engineer
ENGG ASHRAF ALI
NEAR GOL MARKET HAMDARD NAGAR
Contractor
Saamag Projects Limited
B-67, Sarita Vihar, New Delhi-110076
Sr.Development work declared to RERA
1Demarcation of Plots
Front Side Meerut- Haridwar Highway, back side Abadi Expansion, Right side Kalam Resturant & left Side vacant plot
2Boundary Wall
8 feet high boundary wall on all the sides of 1800 meter, and front 5 feet high of 300 meter
3Road Work
18.0 M. wide internal road & 9.0 M. wide road around the tower for circulation is proposed
4Footpaths
N.A.
5Water Supply Including Drinking Water Facilities
Under Ground Water Tank 800 KL Raw Water & 800 KL Treated water Tank external water Supply With distribution .
6Sewer System
External Sewerage with STP of 300 KL is Complete
7Drain
External storm water drainage with RWH
8Parks
Boundary wall of the park is complete under tower G+2
9Tree Planting
NO OF TREE Proposed 150 no of tree proposed evergreen 75
10Design For Electric Supply Including Street Lighting
Total load of Project 667 KW the capacity of transformer is 3*250+ 1*100 KVA
11Community Buildings
No Community Centre
12Treatment and Disposal System of Sewage and Sullage water
STP of 300 KLD with treated effluent Storage tank for flushing Gardening System.
13Solid Waste Management And Disposal System
Solid waste management System is planned as Per inviorment clearance by (EIA).
14Water Conservation System
Rain Water Harvesting System 3 nos of 6"dia x 4.50 m (Depth) RWH well with 1.50m x 1.50m De-silt and 300mm dia x 50 mtr boring.
15Energy Management System Including Use of Renewable Energy
As per guidelines of ministry of renewable energy Govt. of India.
16Fire Protection And Fire Safety System
Sprinklers And Alarm Sytem are proposed for towers of S+104, D1 D2 D3
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
As per fire norms & fire NOC is received
19Other Miscellaneous Work
Development of Main Gate + Marketing office
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

0 permits

An approval and the date it runs to - not proof the work matching it was done.

Sanctioned by Meerut Development Authority · 29,675 sqm of land · an approved plan of 6 blocks and 156 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗

Land & documents

39 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
5811725—
5861150—
6601486—
6612670—
6626240—
665534—
666/21390—
677/31260—
581739Khasra
581493Khasra
5811232Khasra
5866030Khasra
5864020Khasra
5861150Khasra
6601238Khasra
6602476Khasra
66011145Khasra
6612670Khasra
6624160Khasra
665, 666/21924Khasra
677/31260Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

11 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 27 Mar 2006.

Registry no.DateTypeArea
462114 May 2008self—
60963 Jul 2009self—
778915 Jun 2010self—
1032110 Aug 2010self—
506723 Apr 2011self—
649329 May 2006other—
55462 May 2006other—
368927 Mar 2006other—
649229 May 2006other—
55472 May 2006other—
649029 May 2006other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 3690
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3689
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5547
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3691
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3688
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5546
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6493
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6492
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6490
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4621
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6096
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 10321
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 5067
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New18 Jan 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Jan 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Jan 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New18 Jan 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New1 Dec 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Dec 2019 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old15 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterUGT
Fire safety (as filed with RERA)FIRE TANK, FHC AND SPRINKLNER
Health serviceNEAR PUBLIC HOSPITAL
Renewable energyNO
Other facilitiesSTP, POWER BACK UP ETC.

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameZENITH TOWNSHIP PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM19923
PANAAACZ2649D
CIN / TANU70109DL2006PTC151229
Name of chairmanMR.DINESH PANDEY
Registered addressRegistered Office Addrss- B-67, Sarita Vihar, New Delhi-110076, Corporate Office Address- C-20/1A/4, Sector-62, Noida, UP-201301, Site Address- Khasra No. 581, 586, 660, 661,662, 665,666/2 & 677/3, Village- Khadauli, Bypass Road, Meerut, U.P .
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Meerut

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ZENITH TOWNSHIP PVT. LTD. RERA A/CBankKOTAK MAHINDRA BANKBranchMEERUTA/C no.IFSCKKBK0005146
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about SAGA HABITAT

Is SAGA HABITAT RERA registered?

Yes. SAGA HABITAT is registered with UPRERA under registration number UPRERAPRJ11609, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SAGA HABITAT?

The completion date filed with UPRERA is 31 Mar 2018. No completion certificate is on record yet.

Who is the builder of SAGA HABITAT?

ZENITH TOWNSHIP PVT. LTD. is the promoter entity that filed SAGA HABITAT with UPRERA (promoter RERA ID UPRERAPRM19923). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SAGA HABITAT have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SAGA HABITAT located?

SAGA HABITAT is registered in Meerut, as filed with UPRERA.

What configurations are available in SAGA HABITAT?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SAGA HABITAT?

The approved unit plan filed with UPRERA runs from 61 to 104 m² of carpet area (about 659 to 1,118 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SAGA HABITAT?

The approved unit plan describes 6 blocks and 156 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SAGA HABITAT?

About 21 units per acre: 156 planned units across 7.33 acres (29,675 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗