SAI KOHINOOR GRAND

UPRERARegistered

SAI KOHINOOR GRAND is a RERA-registered residential project by ONELLA REALTY PRIVATE LIMITED in VILLAGE-RENDUWA PELHARI, PRAGANA DEWA, TEHSIL-NAWABGANJ, Barabanki (RERA ID UPRERAPRJ115705). Registered with a completion deadline of 10 Jul 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
19.46%Q3'25
23.27%Q4'25
27.72%Q1'26
36.1%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ115705
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAny Other Competent Authority
Proposed start1 Apr 2024
Project duration52 months
AddressBLOCK-A, KHASRA NO 1081, 1082, 1086 AND 1088 AT VILLAGE-RENDUWA PELHARI, PARAGNA DEWA, TEHSIL-NAWABGANJ, DISTRICT-BARABANKI-226019, VILLAGE-RENDUWA PELHARI, PRAGANA DEWA, TEHSIL-NAWABGANJ, Nawabganj, Barabanki
TehsilNawabganj
Applicant typeCompany
Applicant addressPRABHA NIWAS, RAILWAY GANJ, HARDOI - 241001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    421/MANCHITRA/JI.PA/2023-24

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 May 2024
Original completion10 Jul 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹13,500
Sanctioning authorityAny Other Competent Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors96 · 1 · 8 (units from plan)
  • 2 BHK48 50%
  • 3 BHK48 50%
ConfigurationUnitsCarpet area
2 BHK4856
3 BHK4866-81
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A · OTHER, 2 BHK, 3 BHK89656-81
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ABHISHEK PANDEY
License CA/2023/162960
537, VINAY KHAND, GOMTI NAGAR, LUCKNOW
Engineer
SUDHIR PANDEY
4/428, VIJAYANT KHAND, GOMTI NAGAR, LUCKNOW
Contractor
ONELLA REALITY PVT LTD
OFFICE 521/248 D, MAHANAGAR EXTENSION, LUCKNOW
Sr.Development work declared to RERA
1Demarcation of Plots
BLOCK A, ON KHASRA NO- 1081, 1082, 1086, 1088, AT VILLAGE RENDUWA PELHARI, PARAGNA-DEWA, TEHSIL-NAWABGANJ, DISTRICT-BARABANKI-226019
2Boundary Wall
230MM WIDE AND 2.1 METER BOUNDARY WALL OF RCC/BRICK FILLED, BOUNDARY WALL AT SITE PLASTER WILL BE DONE ON BOTH SIDE AND AFTER THAT TWO COAT PF PAINTS WILL BE COATED.
3Road Work
CC ROADS AS PER APPROVED PLAN AND CONCRETE/APEX ROAD WILL BE MADE AT THE SITE . THE BASE OF ROAD WILL BE FILLED BY RED MURAM .AFTER THAT TWO LAYER OF AGGREGATE WILL BE LAYED TO MAKE SURE THAT THE ROAD IS UTO THE MARK. AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACKE WHITE APEX, ROAD WILL BE 7.5MTR TO 12 MTR WIDE.
4Footpaths
PAVER BLOCKS LAIED OVER SAND BASE AND FOOTHPATH WILL BE INTERLOCKING TYPE B CONCRETE BLOCKS PAVERS.
5Water Supply Including Drinking Water Facilities
ALL THE DRINKING WATER TO BETHROUGH TERRACE TANK OF REQUIRED CAPACITY, FOR WATER SUPPLY WE HAVE A PROVISION OF BOARING WATER . WATER SUPPLY PROVISION WILL BE PROVIDED VIA SYSTEM OF PUMPS AND PIPES . WATER WILL GET STORED IN UNDERGROUND TANKS FROM THERE WILL GET SUPPLIED TO INDIVIDUAL UNITS PERSONAL TANKS.
6Sewer System
A WELL LAID SEWER SYSTEM CONNECTED TO EXTERNAL SEWERSYSTEM IS PROPOSED
7Drain
DRAINS HAVING A MINIMUM WIDTH OF 150MMMWILL BE PROVIDED FOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUN OFF)
8Parks
INTERNAL PARK WILL BE PROVIDED . THE PARKS WILL HAVE PLAY EQUIPMENTS AND SITTING BENCHES ETC.
9Tree Planting
THE TREES WILL BE PROVIDED AT ALL SUITABLES LOCATIONSOF THE PROJECT AND ALONG THE BOUNDARY WALLS
10Design For Electric Supply Including Street Lighting
ELECTRIC SUPPLY PROVIDED THROUGH INDIVIDUALLY TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUP .
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
SEWAGE SHALL BE TRATED IN SEWAGE TREATMENT PLANT (STP) AND THERAFTER TREATED WATER TO BE USED FOR IRRIGATION.
13Solid Waste Management And Disposal System
SHALL BE COLLECTED AT ONE SPECIFIC POINT, FINAL DISPOSAL WILL BE TIED UP WITH AREA NAGAR NIGAM TEAM.
14Water Conservation System
RAIN WATER HARVESTING PITS SHALL BE PROVIDED FOR GROUND WATER RECHARGINGAND OVER FLOW TO BE DISCHARGED IN THE MUNICIPAL DRAINS.
15Energy Management System Including Use of Renewable Energy
25 PERCENTAGE OF THE STREET LIGHT SHALL HAVE SOLARENERGY BACKUP.
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
FIRE STAIRCASE SHALL BE PROVIDED AS PER THE APPROVED FIR DRAWING FOR EVACUATION TO OPEN AREAS.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Jul 2028.

Sanctioned by Any Other Competent Authority · 1,656 sqm of land · an approved plan of 1 block and 96 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
421/MANCHITRA/JI.PA/2023-2410 Jul 202331 Jul 202810 Jul 203010 Jul 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1081, 1082, 1086, 10881656Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 929
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · 143 ORDER
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Khatauni extract · JULY2019-JUNE2025
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · JOIN DEVELOPMENT AGREEMENT
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New7 Mar 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New7 Mar 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New7 Mar 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New7 Mar 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New7 Mar 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New7 Mar 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New7 Mar 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New7 Mar 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Mar 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Mar 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Apr 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New7 Mar 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New7 Mar 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q1.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q219.46%CA ↗ · Arch ↗ · Eng ↗
2025-Q323.27%CA ↗ · Arch ↗ · Eng ↗
2025-Q427.72%CA ↗ · Arch ↗ · Eng ↗
2026-Q136.1%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameONELLA REALTY PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM4860
PANAABCO7487P
CIN / TANLKN005766F
Name of chairmanAKSHAY AGARWAL, DIRECTOR
Registered addressPRABHA NIWAS, RAILWAY GANJ, HARDOI - 241001
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameMOHAN DEVELOPERS
RoleCo-promoter
Applicant typePartnership Firm
AddressC-112, SECTOR-A, MAHANAGAR , LUCKNOW
RERA contact

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
ONELLA REALTY PVT LTD COLLECTION A/C FOR SAI KOHINOOR GRANDBankAXIS BANK LTD.BranchMOHAMMADPUR CHOWKI, BARABANKIBranch addressKH NO 3 & 25, KHASRA NO 292 & 281, GF , SAFEDABAD, NAWABGANJ MOHAMMADPUR CHOWKI, BARABANKI. UTTAR PRADESH-225003Branch districtBarabankiA/C no.IFSCUTIB0002553Branch emailbrhd2553@axisbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
ONELLA REALTY PVT LTD SEPARATE A/C FOR SAI KOHINOOR GRANDBankAXIS BANK LTDBranchMOHAMMADPUR CHOWKI, BARABANKIBranch addressKHASRA NO 292 281, GF SAFEDABAD, NAWABGANJ, MOHAMMADPUR CHOWKI, BARABANKI, UTTAR PRADESH-225003Branch districtBarabanki, Uttar PradeshA/C no.IFSCUTIB0002553
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
ONELLA REALTY PVT LTD TRANSACTION A/C FOR SAI KOHINOOR GRANDBankAXIS BANK LTDBranchMOHAMMADPUR CHOWKI, BARABANKIBranch addressKHASRA NO 292, 281, GF SAFEDABAD, NAWABGANJ, MOHAMMADPUR CHOWKI, BARABANKI, UTTAR PRADESH-225003Branch districtBarabanki, Uttar PradeshA/C no.IFSCUTIB0002553
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SAI KOHINOOR GRAND

Is SAI KOHINOOR GRAND RERA registered?

Yes. SAI KOHINOOR GRAND is registered with UPRERA under registration number UPRERAPRJ115705, registered on 2 May 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SAI KOHINOOR GRAND?

The completion date filed with UPRERA is 10 Jul 2028. No completion certificate is on record yet.

Who is the builder of SAI KOHINOOR GRAND?

ONELLA REALTY PRIVATE LIMITED is the promoter entity that filed SAI KOHINOOR GRAND with UPRERA (promoter RERA ID UPRERAPRM4860). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SAI KOHINOOR GRAND have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SAI KOHINOOR GRAND located?

SAI KOHINOOR GRAND is registered in VILLAGE-RENDUWA PELHARI, PRAGANA DEWA, TEHSIL-NAWABGANJ, Barabanki, as filed with UPRERA.

What configurations are available in SAI KOHINOOR GRAND?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SAI KOHINOOR GRAND?

The approved unit plan filed with UPRERA runs from 56 to 81 m² of carpet area (about 602 to 870 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SAI KOHINOOR GRAND?

The approved unit plan describes 1 block and 96 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SAI KOHINOOR GRAND?

About 235 units per acre: 96 planned units across 0.41 acres (1,656 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗