SAVVIOUR MANOHARRAM

UPRERARegistered

SAVVIOUR MANOHARRAM is a RERA-registered commercial project by SAVIOUR INFRA PRIVATE LIMITED in Mirzapur, Sector-19, Gautam Budh Nagar (RERA ID UPRERAPRJ633750). Registered with a completion deadline of 31 Dec 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
38%Q2'25
49%Q3'25
54.56%Q4'25
56.83%Q1'26
62.97%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ633750
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start1 Dec 2023
Project duration49 months
AddressC-18, Gaur Yamuna City, Pocket-3, Mirzapur Site LFD-3, Sector-19, Mirzapur, Sector-19, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressC-110, sector-65 noida-201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    YEA/PLANNING/BP-143/1585/2023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Jan 2024
Original completion31 Dec 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹60,000
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors423 · 1 · 6 (units from plan)
Homes · commercial units69 · 354 (shops and offices filed in the same plan)
  • SHOP354 84%
  • OTHER69 16%
ConfigurationUnitsCarpet area
SHOP3545-23
OTHER6914-46
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
SAVVIOUR · SHOP, OTHER64235-46
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 133.4 m² for a SHOP, 132.07 m² for a SHOP, 152.48 m² for a SHOP and 1 other unit like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
KAILASH AGGARWAL- APLUS DESIGN ASSOCIATES
License CA-86-10069
J-16, SECGTOR-41, NOIDA, UP-201303
Engineer
RD CHAUDHARY- RD CONSULTANTS
212 SHANKAR NIWAS LBS ROAD MULUND CHECK NAKA MUMBAI
Contractor
ASHISH KUMAR AND PRASHANT BHATI - AVENUE CONSTRUCTION PVT LTD
VILLAGE SHEORAJPUR, POST DADRI, GB NAGAR, UP-203207
Sr.Development work declared to RERA
1Demarcation of Plots
SINGLE PLOT OF 5000 METRES SEPERATELY IDENTIFIED PLOT NO C-18, POCKET-03, LFD-03, SECTOR-19, GYC, YAMUNA EXPRESSWAY IN TOWNSHIP GAUR YAMUNA CITY
2Boundary Wall
RCC FRAME STRUCTURE WITH COLUMN AT 3M C/C (APPROX 1500MM HEIGHT) WITH PLINTH BEAM AND TOP BEAM FILLED WITH BRICK WORK. MS RAILING OF ABOUT 300 MM HEIGHT
3Road Work
NO INTERNAL ROADS IN THE PROJECT. PROJECT IS PART OF THE TOWNSHIP "GAUR YAMUNA CITY" . RAMPS WILL BE CONSTRUCTED FOR ENTRY AND EXIT FROM THE BASEMENT. SET BACK AREA IS CONSTRUCTED WITH CC CONCRETE/PAVER BLOCKS /STONE WITH PROPER SLOPES AND GRADE
4Footpaths
FOOTHPATH OUTSIDE THE PROJECT WILL BE CONSTRUCTED BY GAUR YAMUNA TOWNSHIP. INTERNAL FOOTHPATH WILL BE CONSTRUCTED WITH HEAVY DUTY TILES/PAVER BLOCKS/ STONE AS PER DRAWINGS
5Water Supply Including Drinking Water Facilities
SUPPLY TO THE PROJECT WILL BE PROVIDED BY TOWNSHIP/MUNICIPAL AUTHORITIES. PROVISION OF WATER SUPPLY IN EACH UNIT THROUGH UPVC PIPELINE WORK. OVERHEAD TANKS WILL BE CONSTRUCTED ON THE BUILDING UNIT FOR 24 HOURS WATER SUPPLY
6Sewer System
INTERNAL SEWAGE SYSTEM WILL BE DEVELOPED BY THE COMPANY WITH PROPER MANHOLES AT THE REQUIRED INTERVALS AND EXTERNAL SEWAGE CONNECTION WILL BE CONNECTED TO SEWER OF TOWNSHIP/MUNICIPAL AUTHORITIES THROUGH PVC/CEMENT PIPES
7Drain
DRAIN VIA HANGING PVC LINES WILL RUN FROM THE ROOF AND FROM EVERY FLOOR TOWARDS THE BASEMENT. EXTERNAL DRAINAGE WILL BE PROVIDED ALONG THE INTERNAL ROADS WITH PROPER WATER HARVESTING PITS.
8Parks
NOT APPLICABLE FOR THIS PROJECT
9Tree Planting
TREES WILL BE PLANTED IN FRONT OF THE BUILDING AS PROPOSED BY THE LANSCAPE CONSULTANT AND MENTIONED IN THE APPROVED MAPS BY THE AUTHORITY
10Design For Electric Supply Including Street Lighting
SINGLE POINT CONNECTION WILL BE TAKEN FROM UPPCL AND ELECTRIC SUPPLY WILL BE PROVIDED TO EACH UNIT THROUGH A SEPERATE METER INSTALLED AT EACH FLOOR. AND COMMON AREA LIGHTING WILL BE PROVIDED BY THE COMPANY AT THE NECESSARY PLACES. PROJECT INTEGRAL PART OF TOWNSHIP WHERE STREET LIGHTING WILL BE DONE BY TOWNSHIP.
11Community Buildings
NOT APPLICABLE FOR THIS PROJECT
12Treatment and Disposal System of Sewage and Sullage water
STP PLANT OF APPROXIMATE 80KLD WILL BE CONSTRUCTED AT SITE AND TREATED WATER FROM THE STP WILL BE TAKEN TO A SEPERATE OVERHEAD TANK THROUGH WHICH CONSUMERS CAN USE IT FOR FLUSHING AND IRRIGATION PURPOSES.
13Solid Waste Management And Disposal System
COMPOST MACHINE WILL BE INSTALLED IN BASEMENT FOR SOLID WASTE MANAGEMENT AND OUTPRODUCT WILL BE CARRIED OUT BY OUTSIDE AGENCY. ALSO AN OUTSIDE AGENCY WILL BE APPOINTED FOR COLLECTION OF GARBAGE
14Water Conservation System
ROOF TOP RAIN WATER HARVESTING SYSTEM AND INTERNAL ROAD SURFACE DRAINAGE WITH RAIN WATER HARVESTING WITH HARVESTING PITS CONSTRUCTED AT REQUIRED INTERVALS
15Energy Management System Including Use of Renewable Energy
SOLAR ENERGY PANELS WILL BE INSTALLED AT THE ROOFTOP FOR THE PURPOSE OF COMMON AREA LIGHTENING
16Fire Protection And Fire Safety System
PA SYSTEM, FIRE ALARMS, FIRE SMOKE DETECTION SYSTEM, SPRINKLERS, EXHAUST FANS WILL BE PROVIDED IN BASEMENT AS PER DRAWINGS OF CONSULTANT
17Social Infrastructure And Other Public Amenities Including Public Health Services
PROJECT IS PART OF TOWNSHIP
18Emergency Evacuation Services
FIRE EXTINGUISHERS WILL BE INSTALLED ON EACH FLOOR AT REQUIRED PLACES. SIGNAGES WILL BE INSTALLED AT THE REQUIRED PLACES IN THE BUILDING FOR ENTRY AND EXIT PURPOSES. STAIRCASE WITH PROPER SIGNAGES WILL BE PROVIDED IN CASE OF EMERGENCY EVACUATION
19Other Miscellaneous Work
NOT APPLICABLE
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Global RealtyUPRERAAGT16138
2REAL HOMEZUPRERAAGT11572
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 5 Oct 2028.

Sanctioned by Yamuna Expressway Authority · 5,000 sqm of land · an approved plan of 1 block and 423 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
YEA/PLANNING/BP-143/1585/20236 Oct 20235 Oct 20285 Oct 202831 Dec 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
C-185000Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 14280
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Oct 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Oct 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New10 Oct 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Oct 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New10 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New10 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New10 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New28 Oct 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Nov 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Oct 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New10 Oct 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New10 Oct 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New21 Nov 2023 ↗

Quarterly progress reports

11 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

11 quarterly progress reports are on file with UPRERA, covering 2023-Q3 to 2026-Q1.

QuarterConstructionCertificates
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q138%CA ↗ · Arch ↗ · Eng ↗
2025-Q249%CA ↗ · Arch ↗ · Eng ↗
2025-Q354.56%CA ↗ · Arch ↗ · Eng ↗
2025-Q456.83%CA ↗ · Arch ↗ · Eng ↗
2026-Q162.97%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSAVIOUR INFRA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM168278
PANABGCS4739Q
CIN / TANU70109UP2021PTC149127
Name of chairmanNIRMAL GUPTA
Registered addressC-110, sector-65 noida-201301
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SAV INF PL SAVVIOUR MANOHARRAM COL A/CBankHDFC BANK LIMITEDBranchSTELLAR IT PARK NOIDABranch addressC-25, STELLAR IT PARK, NOIDA, SECTOR 62, 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649Branch emailkshitiz.bhardwaj1@hdfcbank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SAV INF PL SAVVIOUR MANOHARRAM SEP A/CBankHDFC BANK LIMITEDBranchSTELLAR IT PARK NOIDABranch addressC-25, STELLAR IT PARK, NOIDA SECTOR-62 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SAV INF PL SAVVIOUR MANOHARRAM TRAN A/CBankHDFC BANK LIMITEDBranchSTELLAR IT PARK NOIDABranch addressC-25, STELLAR IT PARK, SECTOR-62, NOIDA 201306Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCHDFC0002649
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)4 (Under Registration - 1 ) → 4 (Under Registration - 0 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)3 (Under Registration - 0 ) → 4 (Under Registration - 1 )
changed in Estanzo’s record
29 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SAVVIOUR MANOHARRAM

Is SAVVIOUR MANOHARRAM RERA registered?

Yes. SAVVIOUR MANOHARRAM is registered with UPRERA under registration number UPRERAPRJ633750, registered on 9 Jan 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SAVVIOUR MANOHARRAM?

The completion date filed with UPRERA is 31 Dec 2027. No completion certificate is on record yet.

Who is the builder of SAVVIOUR MANOHARRAM?

SAVIOUR INFRA PRIVATE LIMITED is the promoter entity that filed SAVVIOUR MANOHARRAM with UPRERA (promoter RERA ID UPRERAPRM168278). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SAVVIOUR MANOHARRAM have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SAVVIOUR MANOHARRAM located?

SAVVIOUR MANOHARRAM is registered in Mirzapur, Sector-19, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SAVVIOUR MANOHARRAM?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SAVVIOUR MANOHARRAM?

The approved unit plan filed with UPRERA runs from 5 to 46 m² of carpet area (about 51 to 492 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SAVVIOUR MANOHARRAM?

The approved unit plan describes 1 block and 423 units of which 69 are homes and 354 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SAVVIOUR MANOHARRAM?

About 342 units per acre: 423 planned units across 1.24 acres (5,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗