Yamuna City Mall

UPRERARegistered

Yamuna City Mall is a RERA-registered commercial project by Wall Rock Developers LLP in Gautam Budh Nagar (RERA ID UPRERAPRJ892259). Registered with a completion deadline of 22 Sept 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
50.85%Q3'25
52.32%Q4'25
53%Q1'26
53.45%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ892259
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start1 Nov 2022
Project duration59 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typePartnership Firm
Applicant addressRegd. Office - B 33, Sector 63, NOIDA, Gautam Buddha Nagar, Uttar Pradesh 201301 Corporate Office- B 33, Sector 63, NOIDA, Gautam Buddha Nagar, Uttar Pradesh 201301 Site Office -C-14,Sector-Commercial Plot in Gaur Yamuna City( Pocket-3), at Mirzapur Site, (LFD-3), Sector -19,YEIDA,Greater Noida, Gautam Buddha Nagar, Uttar Pradesh,PIN-203201
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Y.E.A. /PLANNING/148/2022

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Nov 2022
Original completion22 Sept 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹60,000
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors560 · 1 · 6 (units from plan)
Homes · commercial units2 · 558 (shops and offices filed in the same plan)
  • SHOP558 100%
  • OTHER2 <1%
ConfigurationUnitsCarpet area
SHOP5582-34
OTHER2453
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Commercial · SHOP, OTHER65602-34
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 92.61 m² for a SHOP, 157.89 m² for a SHOP, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Kailash Chander Aggarwal
License CA/86/10069
J-16, Sector 41, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN -201303
Engineer
Piyush Agarwal
B-501, Sethi Max Royal, Sector 76, NOIDA, Gautam Buddha Nagar, Uttar Pradesh , PIN- 201301
Contractor
Manish Kumar- NEENV Infrastructures Pvt. Ltd.
145A, Ground Floor, N Block, Greater Kailash,-I, New Delhi South Delhi, Delhi, PIN- 110048
Sr.Development work declared to RERA
1Demarcation of Plots
Single Plot of 5,000 Sq. Mtrs. Separately identified Plot No. C- 14, Gaur Yamuna City, Pocket 3, Mirzapur Site, LFD-3, Sector 19, YEIDA, Greater NOIDA, Gautam Buddha Nagar, Uttar Pradesh.
2Boundary Wall
RCC Frame Structure with columns at 3 mm c/c ( approx. 1500 mm height ) with plinth beam and top beam, filled with brick work. MS railing of about 300 mm height.
3Road Work
No Internal Road in the Project. Ramps will be constructed for entry and exit from basement. set back Area is constructed with CC Concrete / Paver Blocks with Proper slopes and grade.
4Footpaths
Footpath outside the Project will be constructed by GYC township. Internal Footpath will be constructed with Heavy duty Tiles / Paver Blocks as per drawings.
5Water Supply Including Drinking Water Facilities
Supply to the Project will be Provided by Township / Municipal Authorities. Provision of Water supply in each unit through UPVC pipeline work. Overhead tanks will be constructed on the building unit for 24 hours water supply.
6Sewer System
internal Sewage system will be developed by the company with proper manholes at required intervals and external sewage connection will be connected to sewer of Township / Municipal Authorities through PVC/ cement pipes.
7Drain
Drain via Hanging PVC Lines will run from the roof and from every floor towards the Basement, External drainage will be provided along the internal roads with proper water harvesting pits.
8Parks
Not Applicable
9Tree Planting
Trees will be planted in front of the building as proposed by landscape consultant and mentioned in the approved maps by authority.
10Design For Electric Supply Including Street Lighting
Single Point Connection will be taken from UPPCL and electric supply will be provided to each unit through a separate meter installed at each floor. and common area lighting will be provided by the company at the necessary places,. Project integral Part of Township where street Lighting will be done by Township.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
STP Plant of approximate 80 KLD will be constructed at site and treated water from STP will be taken to a separate overhead tank through which consumers can use it for flushing and irrigation purposes.
13Solid Waste Management And Disposal System
Compost machine will be installed basement for solid waste management and out product will carried out by outsides agency. Also an Outside agency will be appointed for collection of Garbage.
14Water Conservation System
Roof Top Rain Water Harvesting systems and internal Road surface drainage with rain water Harvesting pits constructed at required intervals.
15Energy Management System Including Use of Renewable Energy
No
16Fire Protection And Fire Safety System
PA system , Fire Alarms, Fire Smoke Detection System, Sprinkles , Exhaust Fans will be provided in basement as per drawings of consultant
17Social Infrastructure And Other Public Amenities Including Public Health Services
Project part of Township.
18Emergency Evacuation Services
Fire extinguishers will be installed on each floor at required places, Signages will installed at the required places in the building for entry and exit purposes.
19Other Miscellaneous Work
Not Applicable.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Sept 2027.

Sanctioned by Yamuna Expressway Authority · 5,000 sqm of land · an approved plan of 1 block and 560 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Y.E.A. /PLANNING/148/202223 Sept 202222 Sept 202722 Sept 203222 Sept 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
C-14, Sector Commercial Plot in Gaur Yamuna City, ( Pocket-3) at Mirzapur Site, (LFD-3), Sector 19, YEIDA, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN- 2032015000Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 24469
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Land Title Search Report
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Affidavit ( Sale )
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · 11798
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Allotment letter from the authority · Concession Agreement dated 07.02.2003
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Request Letter Regarding Editing Mobile No. of Promoter
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New4 Oct 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New17 Oct 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New17 Oct 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New17 Oct 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New4 Oct 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New4 Oct 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New4 Oct 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New4 Oct 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New4 Oct 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Oct 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 Oct 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New4 Oct 2022 ↗

Quarterly progress reports

15 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

15 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2026-Q1.

QuarterConstructionCertificates
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q250.85%CA ↗ · Arch ↗ · Eng ↗
2025-Q352.32%CA ↗ · Arch ↗ · Eng ↗
2025-Q453%CA ↗ · Arch ↗ · Eng ↗
2026-Q153.45%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameWall Rock Developers LLP
RolePromoter · current
RERA IDUPRERAPRM199290
PANAADFW9335P
CIN / TANMRTW01241C
Registered addressRegd. Office - B 33, Sector 63, NOIDA, Gautam Buddha Nagar, Uttar Pradesh 201301 Corporate Office- B 33, Sector 63, NOIDA, Gautam Buddha Nagar, Uttar Pradesh 201301 Site Office -C-14,Sector-Commercial Plot in Gaur Yamuna City( Pocket-3), at Mirzapur Site, (LFD-3), Sector -19,YEIDA,Greater Noida, Gautam Buddha Nagar, Uttar Pradesh,PIN-203201
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Wall Rock Developers LLP Collection Account for Yamuna City MallBankICICI Bank LimitedBranchSector 61, NOIDABranch addressSupertech Shopprix, C 134 B, Sector 61, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201307Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000253
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Wall Rock Developers LLP Separate Bank Account for Yamuna City MallBankICICI Bank LimitedBranchSector 61, NOIDABranch addressSupertech Shopprix, C 134 B, Sector 61, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201307Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000253
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Wall Rock Developers LLP RERA Transaction Account for Yamuna City MallBankICICI Bank LimitedBranchSector 61, NOIDABranch addressSupertech Shopprix, C 134 B , Sector 61, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN 201307Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000253
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Yamuna City Mall

Is Yamuna City Mall RERA registered?

Yes. Yamuna City Mall is registered with UPRERA under registration number UPRERAPRJ892259, registered on 30 Nov 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Yamuna City Mall?

The completion date filed with UPRERA is 22 Sept 2027. No completion certificate is on record yet.

Who is the builder of Yamuna City Mall?

Wall Rock Developers LLP is the promoter entity that filed Yamuna City Mall with UPRERA (promoter RERA ID UPRERAPRM199290). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Yamuna City Mall have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Yamuna City Mall located?

Yamuna City Mall is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Yamuna City Mall?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Yamuna City Mall?

The approved unit plan filed with UPRERA runs from 2 to 453 m² of carpet area (about 18 to 4,879 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Yamuna City Mall?

The approved unit plan describes 1 block and 560 units of which 2 are homes and 558 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Yamuna City Mall?

About 453 units per acre: 560 planned units across 1.24 acres (5,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗