SAYA STATUS (Formerly OH MY GOD)

UPRERARegistered

SAYA STATUS (Formerly OH MY GOD) is a RERA-registered commercial project by Saya Cementation Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ11141). Registered with a completion deadline of 30 Nov 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ11141
Project categoryCommercial
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Sept 2017
Original start30 Apr 2015
Project duration87 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressB-7/45, IIND Floor, Safdarjung Enclave Extention Delhi-110029
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1425/781

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Permit revalidated

    2021/07/28/5252

  7. Building permit sanctioned

    2021/07/28/5252

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered15 Aug 2017
Original completion31 Aug 2022
Revised completion30 Nov 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,99,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors2,407 · 2 · 42 (units from plan)
Homes · commercial units719 · 1,688 (shops and offices filed in the same plan)
  • SHOP1,688 70%
  • STUDIO719 30%
ConfigurationUnitsCarpet area
SHOP1,6882-40
STUDIO7193-79
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · SHOP, STUDIO, OTHER422,3432-79
b · SHOP, OTHER76428
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Designplus Associates Services Private Limited
License CA/96/20846
E-145, Okhla Industrial Estate, Phase-III, New Delhi-110020, INDIA
Engineer
Baldridge & Associate Structural Engineering
1164 Bishop Street, Suite 600 Honolulu, Hawaii 96813
Sr.Development work declared to RERA
1Demarcation of Plots
as per Development plan attached
2Boundary Wall
as per Development plan attached
3Road Work
as per Development plan attached
4Footpaths
as per Development plan attached
5Water Supply Including Drinking Water Facilities
as per Development plan attached
6Sewer System
as per Development plan attached
7Drain
as per Development plan attached
8Parks
as per Development plan attached
9Tree Planting
as per Development plan attached
10Design For Electric Supply Including Street Lighting
as per Development plan attached
11Community Buildings
as per Development plan attached
12Treatment and Disposal System of Sewage and Sullage water
as per Development plan attached
13Solid Waste Management And Disposal System
as per Development plan attached
14Water Conservation System
as per Development plan attached
15Energy Management System Including Use of Renewable Energy
as per Development plan attached
16Fire Protection And Fire Safety System
as per Development plan attached
17Social Infrastructure And Other Public Amenities Including Public Health Services
as per Development plan attached
18Emergency Evacuation Services
as per Development plan attached
19Other Miscellaneous Work
as per Development plan attached
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

11 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
2FINDING HOMEUPRERAAGT14297
3Innovance Realty Private LimitedUPRERAAGT13354
4Naturetech Realty Private LimitedUPRERAAGT10282
5PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
6PVN Infrastructure Private LimitedUPRERAAGT10339
7Regrob Infrastructure Pvt LtdUPRERAAGT12681
8SMC Real Estate Advisors Private LimitedUPRERAAGT10113
9Vikas RanaUPRERAAGT11215
10WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
11yogender kumar rajputUPRERAAGT14666
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 8 Feb 2028. 1 of them carries a revalidation.

Sanctioned by Noida Authority · 18,898 sqm of land · an approved plan of 2 blocks and 2407 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
1425/78121 Apr 201515 Apr 202014 Apr 202331 Aug 2022—
2021/07/28/52528 Feb 20238 Feb 20288 Feb 203328 Feb 20238 Feb 2023
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Nov 2024.

#Granted fromExtended uptoNote
131 Aug 202228 Feb 2023Six months extension in view of force majeure caused by covid-19 pandemic
228 Feb 202330 Nov 2024—

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
554,577M,578M,579M,57618,898 sqm—
C3-A18898Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 30 Sept 2013.

Registry no.DateTypeArea
1211530 Sept 2013other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 12115
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 12115
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 12115
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2020 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old14 Aug 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old14 Aug 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old14 Aug 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old14 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old14 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old14 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old14 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old14 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes as per applicable laws
Fire safety (as filed with RERA)Yes as per applicable laws
Health serviceAs per applicable laws
Renewable energyAs per IGBC guidelines

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—Arch ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSaya Cementation Limited
RolePromoter · current
RERA IDUPRERAPRM214134
PANAADCD0032B
CIN / TANDELD11113E
Name of chairmanVikas Bhasin
Registered addressB-7/45, IIND Floor, Safdarjung Enclave Extention Delhi-110029
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameALISA INFRATECH PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressB-7/45,IIND FLOOR, SAFDARJUNG ENCLAVE EXTENSION, NEW DELHI-110029
RERA contact

Nearby projects

Gautam Budh Nagar

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S Alisa Infratech Pvt Ltd Collection Escrow AccountBankHDFC BANK Ltd.BranchWindsor Park 5, Vaibhav KhandBranch addressHDFC Bank Ltd, G 2 And 3, Windsor Park 5, Vaibhav Khand, Indirapuram, Ghaziabad-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Baya Weaver LimitedBankHDFCBranchAnsal Arcade, Sector-18, NoidaBranch addressAnsals Fortune Arcade, K Block, Near Atta Peer, Sector-18, NoidaBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC000088
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S Alisa Infratech Pvt. Ltd. Transaction Escrow AccountBankHDFC Bank Ltd.BranchWindsor Park 5, Vaibhav KhandBranch addressHDFC Bank Ltd, G 2 And 3, Windsor Park 5, Vaibhav Khand, Indirapuram, Ghaziabad-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC000590
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

12 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)446 (Under Registration - 5 ) → 446 (Under Registration - 2 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)446 (Under Registration - 6 ) → 446 (Under Registration - 5 )
changed in Estanzo’s record
3 Oct 2026
Promoter’s complaints tally (all their projects)446 (Under Registration - 7 ) → 446 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)444 (Under Registration - 5 ) → 446 (Under Registration - 7 )
changed in Estanzo’s record
27 Sept 2026
Promoter’s complaints tally (all their projects)444 (Under Registration - 8 ) → 444 (Under Registration - 5 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)345 (Under Registration - 8 ) → 444 (Under Registration - 8 )
changed in Estanzo’s record
21 Sept 2026
Promoter’s complaints tally (all their projects)345 (Under Registration - 10 ) → 345 (Under Registration - 8 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)344 (Under Registration - 9 ) → 345 (Under Registration - 10 )
changed in Estanzo’s record
11 Sept 2026
Promoter’s complaints tally (all their projects)344 (Under Registration - 10 ) → 344 (Under Registration - 9 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)343 (Under Registration - 9 ) → 344 (Under Registration - 10 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)339 (Under Registration - 8 ) → 343 (Under Registration - 9 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)336 (Under Registration - 7 ) → 339 (Under Registration - 8 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 12 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SAYA STATUS (Formerly OH MY GOD)

Is SAYA STATUS (Formerly OH MY GOD) RERA registered?

Yes. SAYA STATUS (Formerly OH MY GOD) is registered with UPRERA under registration number UPRERAPRJ11141, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SAYA STATUS (Formerly OH MY GOD)?

The completion date filed with UPRERA is 30 Nov 2024. No completion certificate is on record yet.

Who is the builder of SAYA STATUS (Formerly OH MY GOD)?

Saya Cementation Limited is the promoter entity that filed SAYA STATUS (Formerly OH MY GOD) with UPRERA (promoter RERA ID UPRERAPRM214134). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does SAYA STATUS (Formerly OH MY GOD) show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted SAYA STATUS (Formerly OH MY GOD) more time to complete?

UPRERA's record carries 2 completion extensions for SAYA STATUS (Formerly OH MY GOD), the latest running to 30 Nov 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SAYA STATUS (Formerly OH MY GOD) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SAYA STATUS (Formerly OH MY GOD) located?

SAYA STATUS (Formerly OH MY GOD) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SAYA STATUS (Formerly OH MY GOD)?

The unit plan filed with UPRERA lists SHOP, STUDIO and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SAYA STATUS (Formerly OH MY GOD)?

The approved unit plan filed with UPRERA runs from 2 to 79 m² of carpet area (about 26 to 852 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SAYA STATUS (Formerly OH MY GOD)?

The approved unit plan describes 2 blocks and 2,407 units of which 719 are homes and 1,688 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SAYA STATUS (Formerly OH MY GOD)?

About 515 units per acre: 2,407 planned units across 4.67 acres (18,898 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗