SAYA STATUS (Formerly OH MY GOD) is a RERA-registered commercial project by Saya Cementation Limited in Gautam Budh Nagar (RERA ID UPRERAPRJ11141). Registered with a completion deadline of 30 Nov 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ11141 |
| Project category | Commercial |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 1 Sept 2017 |
| Original start | 30 Apr 2015 |
| Project duration | 87 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | B-7/45, IIND Floor, Safdarjung Enclave Extention Delhi-110029 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1425/781
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
2021/07/28/5252
Building permit sanctioned
2021/07/28/5252
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Aug 2017 |
| Original completion | 31 Aug 2022 |
| Revised completion | 30 Nov 2024 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,99,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP1,688 70%
- STUDIO719 30%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 1,688 | 2-40 |
| STUDIO | 719 | 3-79 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · SHOP, STUDIO, OTHER | 42 | 2,343 | 2-79 |
| b · SHOP, OTHER | 7 | 64 | 28 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots as per Development plan attached |
| 2 | Boundary Wall as per Development plan attached |
| 3 | Road Work as per Development plan attached |
| 4 | Footpaths as per Development plan attached |
| 5 | Water Supply Including Drinking Water Facilities as per Development plan attached |
| 6 | Sewer System as per Development plan attached |
| 7 | Drain as per Development plan attached |
| 8 | Parks as per Development plan attached |
| 9 | Tree Planting as per Development plan attached |
| 10 | Design For Electric Supply Including Street Lighting as per Development plan attached |
| 11 | Community Buildings as per Development plan attached |
| 12 | Treatment and Disposal System of Sewage and Sullage water as per Development plan attached |
| 13 | Solid Waste Management And Disposal System as per Development plan attached |
| 14 | Water Conservation System as per Development plan attached |
| 15 | Energy Management System Including Use of Renewable Energy as per Development plan attached |
| 16 | Fire Protection And Fire Safety System as per Development plan attached |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services as per Development plan attached |
| 18 | Emergency Evacuation Services as per Development plan attached |
| 19 | Other Miscellaneous Work as per Development plan attached |
Registered agents
11 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | BOP REALTY PRIVATE LIMITED | UPRERAAGT10206 |
| 2 | FINDING HOME | UPRERAAGT14297 |
| 3 | Innovance Realty Private Limited | UPRERAAGT13354 |
| 4 | Naturetech Realty Private Limited | UPRERAAGT10282 |
| 5 | PC MANTRA INFOSYSTEM PVT. LTD. | UPRERAAGT10580 |
| 6 | PVN Infrastructure Private Limited | UPRERAAGT10339 |
| 7 | Regrob Infrastructure Pvt Ltd | UPRERAAGT12681 |
| 8 | SMC Real Estate Advisors Private Limited | UPRERAAGT10113 |
| 9 | Vikas Rana | UPRERAAGT11215 |
| 10 | WEALTH CLINIC PRIVATE LIMITED | UPRERAAGT10521 |
| 11 | yogender kumar rajput | UPRERAAGT14666 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 8 Feb 2028. 1 of them carries a revalidation.
Sanctioned by Noida Authority · 18,898 sqm of land · an approved plan of 2 blocks and 2407 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 1425/781 | 21 Apr 2015 | 15 Apr 2020 | 14 Apr 2023 | 31 Aug 2022 | — | |
| 2021/07/28/5252 | 8 Feb 2023 | 8 Feb 2028 | 8 Feb 2033 | 28 Feb 2023 | 8 Feb 2023 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 30 Nov 2024.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Aug 2022 | 28 Feb 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 28 Feb 2023 | 30 Nov 2024 | — |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 554,577M,578M,579M,576 | 18,898 sqm | — |
| C3-A | 18898 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 30 Sept 2013.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 12115 | 30 Sept 2013 | other | — |
| Lease deed · 12115 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 12115 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 12115 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 31 Jul 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 31 Jul 2020 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 14 Aug 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 14 Aug 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 14 Aug 2017 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | Old | 14 Aug 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 14 Aug 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 14 Aug 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 14 Aug 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 14 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Yes as per applicable laws |
| Fire safety (as filed with RERA) | Yes as per applicable laws |
| Health service | As per applicable laws |
| Renewable energy | As per IGBC guidelines |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
12 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
12 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | Arch ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Saya Cementation Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM214134 |
| PAN | AADCD0032B |
| CIN / TAN | DELD11113E |
| Name of chairman | Vikas Bhasin |
| Registered address | B-7/45, IIND Floor, Safdarjung Enclave Extention Delhi-110029 |
| RERA contact | |
| Registered since | 2023 |
| Legal name | ALISA INFRATECH PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | B-7/45,IIND FLOOR, SAFDARJUNG ENCLAVE EXTENSION, NEW DELHI-110029 |
| RERA contact |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/S Alisa Infratech Pvt Ltd Collection Escrow AccountBankHDFC BANK Ltd.BranchWindsor Park 5, Vaibhav KhandBranch addressHDFC Bank Ltd, G 2 And 3, Windsor Park 5, Vaibhav Khand, Indirapuram, Ghaziabad-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Baya Weaver LimitedBankHDFCBranchAnsal Arcade, Sector-18, NoidaBranch addressAnsals Fortune Arcade, K Block, Near Atta Peer, Sector-18, NoidaBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC000088 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/S Alisa Infratech Pvt. Ltd. Transaction Escrow AccountBankHDFC Bank Ltd.BranchWindsor Park 5, Vaibhav KhandBranch addressHDFC Bank Ltd, G 2 And 3, Windsor Park 5, Vaibhav Khand, Indirapuram, Ghaziabad-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC000590 |
What has changed on this record
12 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 446 (Under Registration - 5 ) → 446 (Under Registration - 2 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 446 (Under Registration - 6 ) → 446 (Under Registration - 5 ) changed in Estanzo’s record | 3 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 446 (Under Registration - 7 ) → 446 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 444 (Under Registration - 5 ) → 446 (Under Registration - 7 ) changed in Estanzo’s record | 27 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 444 (Under Registration - 8 ) → 444 (Under Registration - 5 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 345 (Under Registration - 8 ) → 444 (Under Registration - 8 ) changed in Estanzo’s record | 21 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 345 (Under Registration - 10 ) → 345 (Under Registration - 8 ) changed in Estanzo’s record | 13 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 344 (Under Registration - 9 ) → 345 (Under Registration - 10 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 344 (Under Registration - 10 ) → 344 (Under Registration - 9 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 343 (Under Registration - 9 ) → 344 (Under Registration - 10 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 339 (Under Registration - 8 ) → 343 (Under Registration - 9 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 336 (Under Registration - 7 ) → 339 (Under Registration - 8 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 12 movements on record |
Common questions about SAYA STATUS (Formerly OH MY GOD)
Is SAYA STATUS (Formerly OH MY GOD) RERA registered?
Yes. SAYA STATUS (Formerly OH MY GOD) is registered with UPRERA under registration number UPRERAPRJ11141, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SAYA STATUS (Formerly OH MY GOD)?
The completion date filed with UPRERA is 30 Nov 2024. No completion certificate is on record yet.
Who is the builder of SAYA STATUS (Formerly OH MY GOD)?
Saya Cementation Limited is the promoter entity that filed SAYA STATUS (Formerly OH MY GOD) with UPRERA (promoter RERA ID UPRERAPRM214134). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does SAYA STATUS (Formerly OH MY GOD) show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted SAYA STATUS (Formerly OH MY GOD) more time to complete?
UPRERA's record carries 2 completion extensions for SAYA STATUS (Formerly OH MY GOD), the latest running to 30 Nov 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SAYA STATUS (Formerly OH MY GOD) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SAYA STATUS (Formerly OH MY GOD) located?
SAYA STATUS (Formerly OH MY GOD) is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in SAYA STATUS (Formerly OH MY GOD)?
The unit plan filed with UPRERA lists SHOP, STUDIO and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SAYA STATUS (Formerly OH MY GOD)?
The approved unit plan filed with UPRERA runs from 2 to 79 m² of carpet area (about 26 to 852 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SAYA STATUS (Formerly OH MY GOD)?
The approved unit plan describes 2 blocks and 2,407 units of which 719 are homes and 1,688 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SAYA STATUS (Formerly OH MY GOD)?
About 515 units per acre: 2,407 planned units across 4.67 acres (18,898 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗