Shalimar Business District Tower 1 is a RERA-registered commercial project by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) in VILLAGE -BAGHAMAU , LUCKNOW, Lucknow (RERA ID UPRERAPRJ143786). Registered with a completion deadline of 15 Dec 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ143786 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 15 Jan 2024 |
| Project duration | 48 months |
| Address | COMMERCIAL BUILDING AT PLOT NO COMMERCIAL -1 , AT KHASRA NO- 570, 571, 572, 573, 574, 575, 576, 613, 625, 626, 631, 633, 635, 636, 569KA & 569 KHA, INTEGRATED TOWNSHIP AT VILLAGE -BAGHAMAU , LUCKNOW, VILLAGE -BAGHAMAU , LUCKNOW, Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | 11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Commercial Building/09702/LDA/BP/23-24/2375/11102023
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 Jan 2024 |
| Original completion | 15 Dec 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,21,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- OTHER160 99%
- SHOP2 1%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 2 | 91-121 |
| OTHER | 160 | 13-208 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower 1 · SHOP, OTHER | 24 | 162 | 13-208 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved sanction plan.This is single plot polygon shaped , having total 1 no. of entry gate and 1no. of exit gate. Site is surronded by 30 mtr road from North, 24 mtr road from South and other plots by East and West. |
| 2 | Boundary Wall 1.8 - 2.1m high and 200 mm thick Boundary wall designed or with MS Railing as per approved design. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates may of of MS Steel steel structure as per approved design are developed with boundary. |
| 3 | Road Work Trimix / asphalt road will be used as per design suggested by the Architect for internal road. |
| 4 | Footpaths All internal roads will have narrow footpath with tiles pavers or equivalent finishes as per landscape design. |
| 5 | Water Supply Including Drinking Water Facilities All floors must be equipped with domestic water for sanitary activities and STP (Sewage Treatment Plant) treated water for the flushing system. Individuals may utilize an RO (Reverse Osmosis) system as per their specific requirements for potable purposes. The STP treated water will also be made available for irrigation purposes. To facilitate this, water tanks are being constructed underground and on the terrace. Separate tanks are designated for fire water. |
| 6 | Sewer System The building is equipped with a centralized sewerage system, ensuring all sewage water is directed to the Sewage Treatment Plant (STP) for thorough treatment. Following treatment, the recycled water will be repurposed for gardening, flush tanks, and vehicle washing, contributing to the buildings environmentally friendly practices. Additionally, the building is designed to meet green building standards, targeting a gold certificate. As part of these efforts, the plan is to achieve zero sewage discharge, demonstrating a strong commitment to environmental sustainability. |
| 7 | Drain A stormwater system will be implemented to manage stormwater from roads and other landscaped areas. The stormwater will be directed to the stormwater drain channel, while rooftop stormwater will be channeled to a rainwater harvesting pit to recharge the groundwater. Any overflow will be connected to the municipal drain line to ensure proper drainage and water resource management. This approach effectively mitigates the impact of stormwater runoff and contributes significantly to sustainable water management practices |
| 8 | Parks There is a significant green area beside building for different recreational activities. |
| 9 | Tree Planting The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view. |
| 10 | Design For Electric Supply Including Street Lighting We have designed the system as per local electricity Board and consider centralized Transformer panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control, Pump room etc. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system. |
| 13 | Solid Waste Management And Disposal System Project shall have waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas and other waste shall be handed over to the government vendors for further disposal. |
| 14 | Water Conservation System A well designed rain water harvesting system as per green building codes shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits |
| 15 | Energy Management System Including Use of Renewable Energy The proposed project is envisioned as a green, sustainable building, committed to environmental responsibility and resource efficiency throughout the buildings entire life cycle. The project aims to conserve natural resources and implement optimized energy-efficient systems, aligning with sustainable building practices to promote a positive impact on the environment and long-term operational efficiency |
| 16 | Fire Protection And Fire Safety System All Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers, smoke detectors with pumps are provided as per norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Fire Staircase is provided in the each building, with fire resistant doors, basements have 1 (one) access and exit in case of emergency. Dedicated assembly areas are also defined in the campus. Adequate signage is also provided. |
| 19 | Other Miscellaneous Work NA |
Registered agents
22 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Abhishek Kumar | UPRERAAGT17780 |
| 3 | Anoop Shukla | UPRERAAGT20695 |
| 4 | Asit Gupta C/O Dwelling Homes | UPRERAAGT20902 |
| 5 | BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITED | UPRERAAGT14759 |
| 6 | GOLDEN ESTATE | UPRERAAGT10397 |
| 7 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 8 | MOHAMMAD RASHID | UPRERAAGT15251 |
| 9 | MOHSIN KHAN | UPRERAAGT22544 |
| 10 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 11 | RAMJI SINGH | UPRERAAGT23922 |
| 12 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 13 | Rohit Chandani | UPRERAAGT11546 |
| 14 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 15 | Shashank Shukla | UPRERAAGT17091 |
| 16 | SHINU GUPTA | UPRERAAGT18762 |
| 17 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 18 | SUNIL SINGH CHAUHAN | UPRERAAGT23321 |
| 19 | SUSHILA DEVI SRIVASTAVA | UPRERAAGT15738 |
| 20 | VINAY KUMAR SINGH | UPRERAAGT11226 |
| 21 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
| 22 | Vivekanand Shukla | UPRERAAGT21638 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 15 Nov 2028.
Sanctioned by Lucknow Development Authority · 11,058 sqm of land · an approved plan of 1 block and 162 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Commercial Building/09702/LDA/BP/23-24/2375/11102023 | 16 Nov 2023 | 15 Nov 2028 | 15 Nov 2031 | 15 Dec 2027 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 570, 571, 572, 573, 574, 575, 576, 613, 625, 626, 631, 633, 635, 636, 569Ka & 569 Kha | 36761 | Khasra |
| Sale deed · 687 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 4798 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5396 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Sale deed · 9039 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8785 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9010 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9011 The registered deed by which the promoter bought the land. | PDF ↗ |
| Lease deed · 9652 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1422-1427 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Land Area Chart An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · DemarcatedMap An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Address Proof of Directors An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Affidavit and Map for Leasehold Land An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · Affidavit An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Nov 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Nov 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 20 Nov 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 20 Nov 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 20 Nov 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 20 Nov 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 Nov 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Nov 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 2 Dec 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 20 Nov 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 Nov 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Nov 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 20 Nov 2023 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 20 Nov 2023 ↗ |
Quarterly progress reports
10 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 15.52% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 16.6% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 18.89% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 18.89% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) |
| Role | Promoter · current |
| RERA ID | UPRERAPRM10813 |
| PAN | AAFCA9848N |
| CIN / TAN | U70109DL2006PTC389838 |
| Name of chairman | Mr. Anwar Rizvi |
| Registered address | 11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SHALIMAR LAKECITY PVT LTD COLLECTION ACCOUNT SHALIMAR BUSINESS DISTRICT TOWER 1BankICICI BANKBranchVibhuti Khand, Gomti Nagar, LucknowBranch addressTC-13, V-IV, Vibhuti Khand, Gomti Nagar, Lucknow - 226010, Uttar PradeshBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004698Branch emaildeepak.singh31@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SHALIMAR LAKECITY PVT LTD SEPARATE ACCOUNT SHALIMAR BUSINESS DISTRICT TOWER 1BankICICI BANKBranchVibhuti Khand, Gomti Nagar, LucknowBranch addressTC-13, V-IV, Vibhuti Khand, Gomti Nagar, Lucknow - 226010, Uttar PradeshBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004698Branch emaildeepak.singh31@icicibank.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SHALIMAR LAKECITY PVT LTD TRANSACTION ACCOUNT SHALIMAR BUSINESS DISTRICT TOWER 1BankICICI BANKBranchVibhuti Khand, Gomti Nagar, LucknowBranch addressTC-13, V-IV, Vibhuti Khand, Gomti Nagar, Lucknow - 226010, Uttar PradeshBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004698Branch emaildeepak.singh31@icicibank.com |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 33 (Under Registration - 1 ) → 33 (Under Registration - 0 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 32 (Under Registration - 0 ) → 33 (Under Registration - 1 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 2 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Shalimar Business District Tower 1
Is Shalimar Business District Tower 1 RERA registered?
Yes. Shalimar Business District Tower 1 is registered with UPRERA under registration number UPRERAPRJ143786, registered on 27 Jan 2024. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Shalimar Business District Tower 1?
The completion date filed with UPRERA is 15 Dec 2027. No completion certificate is on record yet.
Who is the builder of Shalimar Business District Tower 1?
M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited) is the promoter entity that filed Shalimar Business District Tower 1 with UPRERA (promoter RERA ID UPRERAPRM10813). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Shalimar Business District Tower 1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Shalimar Business District Tower 1 located?
Shalimar Business District Tower 1 is registered in VILLAGE -BAGHAMAU , LUCKNOW, Lucknow, as filed with UPRERA.
What configurations are available in Shalimar Business District Tower 1?
The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Shalimar Business District Tower 1?
The approved unit plan filed with UPRERA runs from 13 to 208 m² of carpet area (about 137 to 2,236 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Shalimar Business District Tower 1?
The approved unit plan describes 1 block and 162 units of which 160 are homes and 2 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Shalimar Business District Tower 1?
About 59 units per acre: 162 planned units across 2.73 acres (11,058 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗