Shalimar Gallant West is a RERA-registered residential project by M/s Shalimar Corp Ltd. in Lucknow (RERA ID UPRERAPRJ569037). Registered with a completion deadline of 20 Oct 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ569037 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 20 Oct 2022 |
| Project duration | 49 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | A2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029. |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Group Housing/04818/LDA/BP/21-22/1508/15042022
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 19 Jul 2022 |
| Original completion | 20 Oct 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹46,000 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 4 BHK71 82%
- 1 BHK16 18%
| Configuration | Units | Carpet area |
|---|---|---|
| 4 BHK | 71 | 220 |
| 1 BHK | 16 | 29-30 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| EWS/LIG · 1 BHK | 4 | 16 | 29-30 |
| TOWER A · 4 BHK, OTHER | 19 | 36 | 220 |
| TOWER B · 4 BHK | 18 | 35 | 220 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved sanction plan.This is single plot L shaped , having total 1 no. of entry/Exit gate and 1no. of exit gate from the 18 mtr wide front road.Site is surronded by North & East with developers plot and other plot from West side. |
| 2 | Boundary Wall 1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary. |
| 3 | Road Work Trimix / asphalt road will be used as per deisgn suggested by the Architect for internal road. |
| 4 | Footpaths All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes as per landscape design. |
| 5 | Water Supply Including Drinking Water Facilities All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Clear water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water. |
| 6 | Sewer System Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatement. after treatement ,water shall be recycled and it will be used in gardening and flush tanks. oveflow from the STP shall be connected with the Municiple sewarage system. |
| 7 | Drain Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municiple drain line. |
| 8 | Parks There are significant green area beside building including green parks, play areas for childrens and different recretional activities. |
| 9 | Tree Planting The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view. |
| 10 | Design For Electric Supply Including Street Lighting We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc. |
| 11 | Community Buildings Fully centralised AC community center is proposed on ground floor in one tower and Club House comprising swimming pool, multiple facilities viz. gym facility, indoor playing areas etc is proposed at 18th floor in one tower. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatement, after treatement ,water shall be recycled and it will be used in gardening, flush tanks. Oveflow from the STP shall be connected with the Municiple sewarage system. |
| 13 | Solid Waste Management And Disposal System There are proper garbage collection area provided for the solid waste management. |
| 14 | Water Conservation System A well designed rain water harvesting system shall be provided for the whole building/villa complex to conserve water. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. |
| 16 | Fire Protection And Fire Safety System All the fire norms shall be followed as NBC and approval of fire department |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities. |
| 18 | Emergency Evacuation Services Fire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. Dedicated assembly areas defined in the campus.Adequate signage is also provided. |
| 19 | Other Miscellaneous Work Lush green shrubs at vacant space on ground etc. |
Registered agents
25 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Abhishek Kumar | UPRERAAGT17780 |
| 3 | Adish Jain | UPRERAAGT21672 |
| 4 | Anoop Shukla | UPRERAAGT20695 |
| 5 | ARVIND KUMAR | UPRERAAGT15927 |
| 6 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 7 | Asit Gupta C/O Dwelling Homes | UPRERAAGT20902 |
| 8 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 9 | BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITED | UPRERAAGT14759 |
| 10 | GOLDEN ESTATE | UPRERAAGT10397 |
| 11 | GOLDEN STAR REAL ESTATES | UPRERAAGT10303 |
| 12 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 13 | MOHAMMAD RASHID | UPRERAAGT15251 |
| 14 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 15 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 16 | Rohit Chandani | UPRERAAGT11546 |
| 17 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 18 | Saurabh Gupta | UPRERAAGT14655 |
| 19 | Shashank Shukla | UPRERAAGT17091 |
| 20 | SINAN REALTY LLP | UPRERAAGT11785 |
| 21 | Smart InfraReality Private Limited | UPRERAAGT10057 |
| 22 | VINAY KUMAR SINGH | UPRERAAGT11226 |
| 23 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
| 24 | VIVEK VERMA | UPRERAAGT18719 |
| 25 | Vivekanand Shukla | UPRERAAGT21638 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 22 Jun 2027.
Sanctioned by Lucknow Development Authority · 8,162 sqm of land · an approved plan of 3 blocks and 87 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Group Housing/04818/LDA/BP/21-22/1508/15042022 | 23 Jun 2022 | 22 Jun 2027 | 22 Jun 2030 | 20 Oct 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 182, 184, 202, 203 | 8162 | Khasra |
| Sale deed · 4557 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4558 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4562 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Land Area Chart - Gallant West An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 4907 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Reply to objection letter of RERA - Gallant West An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 29 Jun 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 29 Jun 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 29 Jun 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 29 Jun 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 29 Jun 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 29 Jun 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 29 Jun 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 29 Jun 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 29 Jun 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 1 Jul 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 1 Jul 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Jul 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 29 Jun 2022 ↗ |
Quarterly progress reports
15 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
15 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 46.5% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 49.17% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 63.15% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 63.15% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/s Shalimar Corp Ltd. |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4092 |
| PAN | AADCS9234L |
| CIN / TAN | U70100DL1988PLC390006 |
| Name of chairman | Mohd. Abdullah Masood |
| Registered address | A2/3, F.F., Safdarjung Enclave, south delhi Delhi India 110029. |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | SHALIMAR CORP LTD COLL A/C SHALIMAR GALLANT WESTBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH, GOKHLE MARG, LUCKNOWBranch addressCOMMERCIAL BRANCH, GOKHLE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | SHALIMAR CORP LTD SEP A/C SHALIMAR GALLANT WESTBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH, GOKHLE MARG, LUCKNOWBranch addressCOMMERCIAL BRANCH, GOKHLE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | SHALIMAR CORP LTD TRANS A/C SHALIMAR GALLANT WESTBankSTATE BANK OF INDIABranchCOMMERCIAL BRANCH, GOKHLE MARG, LUCKNOWBranch addressCOMMERCIAL BRANCH, GOKHLE MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Shalimar Gallant West
Is Shalimar Gallant West RERA registered?
Yes. Shalimar Gallant West is registered with UPRERA under registration number UPRERAPRJ569037, registered on 19 Jul 2022. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Shalimar Gallant West?
The completion date filed with UPRERA is 20 Oct 2026. No completion certificate is on record yet.
Who is the builder of Shalimar Gallant West?
M/s Shalimar Corp Ltd. is the promoter entity that filed Shalimar Gallant West with UPRERA (promoter RERA ID UPRERAPRM4092). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Shalimar Gallant West have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Shalimar Gallant West located?
Shalimar Gallant West is registered in Lucknow, as filed with UPRERA.
What configurations are available in Shalimar Gallant West?
The unit plan filed with UPRERA lists 4 BHK, OTHER and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Shalimar Gallant West?
The approved unit plan filed with UPRERA runs from 29 to 220 m² of carpet area (about 317 to 2,363 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Shalimar Gallant West?
The approved unit plan describes 3 blocks and 87 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Shalimar Gallant West?
About 43 units per acre: 87 planned units across 2.02 acres (8,162 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗