Shri Krishna Ratan

UPRERARegistered

Shri Krishna Ratan is a RERA-registered residential project by RATAN HOUSING DEVELOPMENT LIMITED in Sambharpur & Bairi Akbarpur Kachhar, Kanpur, Kanpur Nagar (RERA ID UPRERAPRJ890175). Registered with a completion deadline of 21 Sept 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
7%Q3'25
7%Q4'25
11%Q1'26
22%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ890175
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryKanpur Development Authority
Proposed start22 Sept 2025
Project duration60 months
AddressPlot No. 6,7 & 8 (Part of Arazi No. 214), Plot No. 9 (Part of Arazi No. 215), Part of Arazi No. 221, Part of Arazi No. 222, 223 and 224 At Sambharpur, Kanpur. Part of Arazi No. 793, Bairi Akbarpur Kachhar, Kanpur., Sambharpur & Bairi Akbarpur Kachhar, Kanpur, Kanpur, Kanpur Nagar
TehsilKanpur
Applicant typeCompany
Applicant address113/70, SWAROOP NAGAR, KANPUR
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing /08050/KDA/BP/23-24/1399/21072025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Dec 2025
Original completion21 Sept 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹38,500
Sanctioning authorityKanpur Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors181 · 2 · 24 (units from plan)
Homes · commercial units176 · 5 (shops and offices filed in the same plan)
  • 3 BHK167 92%
  • PENTHOUSE8 4%
  • SHOP5 3%
  • 2 BHK1 1%
ConfigurationUnitsCarpet area
SHOP515-27
3 BHK167104-112
PENTHOUSE8165-187
2 BHK190
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower 1 · SHOP, 3 BHK, PENTHOUSE, 2 BHK2418115-187
Tower 2 (Club House) · OTHER40—
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Yusuf Rahman
License CA/2018/101061
16/17, 1(B), Civil Lines, Kanpur
Engineer
Santosh Kumar
Kanpur
Contractor
Kanti Infrabuild Private Limited
112/281, Gopala Kriti Apartment, Swaroop Nagar, Kanpur
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation has been completed as per layout.
2Boundary Wall
The project will be secured with a robust boundry wall, comprising a 5.0 m deep RCC M25 diaphragm substructure for structural stability. The visible portion of the wall shall have a height of 3.6 m, providing security, privacy, and a defined project perimeter. The design ensures long-term durability, resistance to lateral soil pressures, and compliance with structural safety standards.
3Road Work
The internal roads are design and constructed to comply with NBC, suitable for carrying fire tenders. The payment structure is engineered with adequate sub-base, base and wearing course thicknesses to ensure durability, stability, and long service life under sustained load conditions.
4Footpaths
The project will be provided with durable footpaths with PCC base.
5Water Supply Including Drinking Water Facilities
Water will be sourced from the bore well and pumped to the Over Head Tanks (OHT) via underground storage for distribution. An exclusive RCC storage tank is provided for domestic water supply, ensuring adequate capacity, reliable storage, and unintrrupted supply to all units within the project.
6Sewer System
The development is equipped with a well-planned sewer network comprising wastewater pipes and soil waste pipes. These pipelines are connected to strategically located inspection chambers, ensuring ease of maintenance and monitoring. The entire network leads to the STP, where wastewater is treated to prescribed standards. The treated water is then stored in an RCC storage tank and reused for garden.
7Drain
The project shall be provided with surface drainage. These drains are designed for efficient collection and discharge of surface runoff. Thereby facilitating smooth disposal of stormwater and preventing surface waterlogging within the premises.
8Parks
Provided
9Tree Planting
The landscape development includes plantation of Polyalthiya longifolia (Ashoka/ Mast Tree), a vertical evergreen species with non-invasive roots, planted at such spacing to form a uniform green avenue and act as a natural screen. To enhance the ground cover and provided a lush visual effect, Alternanthera shrubs shall be planted underneath, creating a layered planting scheme that adds color, texture, and density to the landscape.
10Design For Electric Supply Including Street Lighting
The project will be equiped with high street lighting poles, fabricated from hot-dip galvanized steel for enhanced durability and corrosion resistance. Each pole will be fitted with energy-efficient LED street lights. The network will include evenly spaced inspection chambers for ease of maintenance. c/c as per requirments.
11Community Buildings
The ground floor of the clubhouse is dedicated entirely to a community building, designed to serve as a central space for social interaction, gatherings and recreational activities for residents. The layout ensures accessibility, functional utility, and a welcomoing environment, fostering a sense of community within development.
12Treatment and Disposal System of Sewage and Sullage water
The development is equipped with a well-planned sewer network of wastewater pipes and soil waste pipes. These pipelines are connected to strategically located inspection chambers, ensuring ease of maintenance and monitoring. The entire network leads to the STP, where wastewater is treated to prescribed standards. The treated water is then stored in an RCC storage tank and reused for garden irrigation thereby promoting sustainability and reducing fresh water consumption.
13Solid Waste Management And Disposal System
Garbage generated within the project will be manually collected from each floor and transported to a designated garbage processing area. After segregation and temporary processing, the waste shall be removed from the site by the Municiple Corporation, ensuring hygienic handling, compliance with local regulations and maintenance of a clean and healthy environment within the premises.
14Water Conservation System
The treated water is then stored in an RCC storage tank and reused for garden irrigation and drip irrigation along the roadside, thereby promoting sustainability and reducing fresh water consumption.
15Energy Management System Including Use of Renewable Energy
The project shall be equipped with a solar water heating system for kitchens designed to comply with the Energy Management System (EMS) requirments. The system utilizes renewable solar energy to reduce conventional energy consumption, enhance sustainability, and support efficient energy management across the development.
16Fire Protection And Fire Safety System
The project shall be equipped with a comprehensive fire protection and fire safety system in compliance with applicable fire safety regulations and the fire approval. Key components include- Fire extinguishers for localised fire control. Hose reels and wet risers for immediate fire fighting access. Yard hydrants for outdoor fire suppression. Automatic sprinkler system for continuous area protection. Manually operated electric fire systems and electrically operated fire system for emergency intervention. Automatic detection and alarm system for early warning and safety monitoring. Underground static water storage tank and terrace tanks to ensure adequate water supply for firefighting. Pump near UG tank to maintain pressure and facilitate rapid water delivery to all firefighting systems. This integrated system ensures efficient fire response, occupant safety, and compliance with statutory fire safety standards throughout the development.
17Social Infrastructure And Other Public Amenities Including Public Health Services
The ground floor of the clubhouse is dedicated entirely to a community building, designed to serve as a central space for social interaction, gatherings, and recreational activities for residents. The layout ensures accessibility, functional utility, and a welcoming environment, fostering a sense of community within the development.
18Emergency Evacuation Services
A dedicated refuge area has been provided on the 18th floor, adjacent to Staircase-1, to ensure the safety of occupants in the event of a fire or emergency. The space is designed to comply with fire safety regulations, offering a protected and easily accessible safe zone where residents can temporarily assemble while awaiting evacuation or rescue.
19Other Miscellaneous Work
Club House with recreational activities.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 9 Sept 2030.

Sanctioned by Kanpur Development Authority · 6,672 sqm of land · an approved plan of 2 blocks and 181 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing /08050/KDA/BP/23-24/1399/2107202510 Sept 20259 Sept 20306 Jan 203321 Sept 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
793695Khasra
2212715Khasra
224890Khasra
214367.88Khasra
222900Khasra
223900Khasra
215257.10Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · X 521156
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · M 844246
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · A 662330
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · Y 783406
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · B 906456
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · AK 605411
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · G 196925
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · IN-UP22306574108610V
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · IN-UP86679594461593V
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · IN-UP73330505930985V
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · IN-UP73328824008532V
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · Certified khatauni (all)
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · GY 877215
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · IN-UP73327766448456V
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Land Area Statement
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · Updated Khatauni
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New27 Sept 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New25 Sept 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New25 Sept 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New25 Sept 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New25 Sept 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New25 Sept 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New25 Sept 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New25 Sept 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New25 Sept 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New27 Sept 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New27 Sept 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New27 Sept 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New15 Oct 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New25 Sept 2025 ↗

Quarterly progress reports

4 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

4 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q1.

QuarterConstructionCertificates
2025-Q27%CA ↗ · Arch ↗ · Eng ↗
2025-Q37%CA ↗ · Arch ↗ · Eng ↗
2025-Q411%CA ↗ · Arch ↗ · Eng ↗
2026-Q122%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameRATAN HOUSING DEVELOPMENT LIMITED
RolePromoter · current
RERA IDUPRERAPRM15031
PANAACCR6099R
CIN / TANU17117UP1998PLC023288
Name of chairmanMR ATMA RAM KHATRI
Registered address113/70, SWAROOP NAGAR, KANPUR
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameANUBHAV MEHROTRA
RoleCo-promoter
Applicant typeIndividual
Address15/265, Civil Lines, Kanpur Nagar, Kanpur Nagar, Uttar Pradesh 208001
RERA contact
Legal nameSUDHIR KUMAR MEHROTRA
RoleCo-promoter
Applicant typeIndividual
Address15/265, Civil Lines, Ajyori, PO- Kanpur, Dist- Kanpur Nagar, Uttar Pradesh 208001
RERA contact
Legal nameANURADHA MEHROTRA
RoleCo-promoter
Applicant typeIndividual
Address15/265, Civil Lines, Ajyori, Kanpur Nagar, Uttar Pradesh 208001
RERA contact

Nearby projects

Kanpur Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
RATAN HOUSING DEVELOPMENT LIMITED COLLECTION ACCOUNT FOR SHRI KRISHNA RATANBankPUNJAB NATIONAL BANKBranchMALL ROAD KANPURBranch addressKANPUR, UTTAR PRADESH, 280001Branch districtKanpur NagarA/C no.IFSCPUNB0025500Branch emailb00255@pnb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
RATAN HOUSING DEVELOPMENT LIMITED SEPARATE ACCOUNT FOR SHRI KRISHNA RATANBankPUNJAB NATIONAL BANKBranchMALL ROAD KANPURBranch addressKANPUR, UTTAR PRADESH, 280001Branch districtKanpur Nagar, Uttar PradeshA/C no.IFSCPUNB0025500
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
RATAN HOUSING DEVELOPMENT LIMITED TRANSACTION ACCOUNT FOR SHRI KRISHNA RATANBankPUNJAB NATIONAL BANKBranchMALL ROAD, KANPURBranch addressKANPUR, UTTAR PRADESH 280001Branch districtKanpur Nagar, Uttar PradeshA/C no.IFSCPUNB0025500
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Shri Krishna Ratan

Is Shri Krishna Ratan RERA registered?

Yes. Shri Krishna Ratan is registered with UPRERA under registration number UPRERAPRJ890175, registered on 3 Dec 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Shri Krishna Ratan?

The completion date filed with UPRERA is 21 Sept 2030. No completion certificate is on record yet.

Who is the builder of Shri Krishna Ratan?

RATAN HOUSING DEVELOPMENT LIMITED is the promoter entity that filed Shri Krishna Ratan with UPRERA (promoter RERA ID UPRERAPRM15031). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Shri Krishna Ratan have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Shri Krishna Ratan located?

Shri Krishna Ratan is registered in Sambharpur & Bairi Akbarpur Kachhar, Kanpur, Kanpur Nagar, as filed with UPRERA.

What configurations are available in Shri Krishna Ratan?

The unit plan filed with UPRERA lists SHOP, 3 BHK, PENTHOUSE, 2 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Shri Krishna Ratan?

The approved unit plan filed with UPRERA runs from 15 to 187 m² of carpet area (about 161 to 2,014 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Shri Krishna Ratan?

The approved unit plan describes 2 blocks and 181 units of which 176 are homes and 5 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Shri Krishna Ratan?

About 110 units per acre: 181 planned units across 1.65 acres (6,672 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗