Shri Krishna Ratan is a RERA-registered residential project by RATAN HOUSING DEVELOPMENT LIMITED in Sambharpur & Bairi Akbarpur Kachhar, Kanpur, Kanpur Nagar (RERA ID UPRERAPRJ890175). Registered with a completion deadline of 21 Sept 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ890175 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Kanpur Development Authority |
| Proposed start | 22 Sept 2025 |
| Project duration | 60 months |
| Address | Plot No. 6,7 & 8 (Part of Arazi No. 214), Plot No. 9 (Part of Arazi No. 215), Part of Arazi No. 221, Part of Arazi No. 222, 223 and 224 At Sambharpur, Kanpur. Part of Arazi No. 793, Bairi Akbarpur Kachhar, Kanpur., Sambharpur & Bairi Akbarpur Kachhar, Kanpur, Kanpur, Kanpur Nagar |
| Tehsil | Kanpur |
| Applicant type | Company |
| Applicant address | 113/70, SWAROOP NAGAR, KANPUR |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Group Housing /08050/KDA/BP/23-24/1399/21072025
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 3 Dec 2025 |
| Original completion | 21 Sept 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹38,500 |
| Sanctioning authority | Kanpur Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK167 92%
- PENTHOUSE8 4%
- SHOP5 3%
- 2 BHK1 1%
| Configuration | Units | Carpet area |
|---|---|---|
| SHOP | 5 | 15-27 |
| 3 BHK | 167 | 104-112 |
| PENTHOUSE | 8 | 165-187 |
| 2 BHK | 1 | 90 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Tower 1 · SHOP, 3 BHK, PENTHOUSE, 2 BHK | 24 | 181 | 15-187 |
| Tower 2 (Club House) · OTHER | 4 | 0 | — |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation has been completed as per layout. |
| 2 | Boundary Wall The project will be secured with a robust boundry wall, comprising a 5.0 m deep RCC M25 diaphragm substructure for structural stability. The visible portion of the wall shall have a height of 3.6 m, providing security, privacy, and a defined project perimeter. The design ensures long-term durability, resistance to lateral soil pressures, and compliance with structural safety standards. |
| 3 | Road Work The internal roads are design and constructed to comply with NBC, suitable for carrying fire tenders. The payment structure is engineered with adequate sub-base, base and wearing course thicknesses to ensure durability, stability, and long service life under sustained load conditions. |
| 4 | Footpaths The project will be provided with durable footpaths with PCC base. |
| 5 | Water Supply Including Drinking Water Facilities Water will be sourced from the bore well and pumped to the Over Head Tanks (OHT) via underground storage for distribution. An exclusive RCC storage tank is provided for domestic water supply, ensuring adequate capacity, reliable storage, and unintrrupted supply to all units within the project. |
| 6 | Sewer System The development is equipped with a well-planned sewer network comprising wastewater pipes and soil waste pipes. These pipelines are connected to strategically located inspection chambers, ensuring ease of maintenance and monitoring. The entire network leads to the STP, where wastewater is treated to prescribed standards. The treated water is then stored in an RCC storage tank and reused for garden. |
| 7 | Drain The project shall be provided with surface drainage. These drains are designed for efficient collection and discharge of surface runoff. Thereby facilitating smooth disposal of stormwater and preventing surface waterlogging within the premises. |
| 8 | Parks Provided |
| 9 | Tree Planting The landscape development includes plantation of Polyalthiya longifolia (Ashoka/ Mast Tree), a vertical evergreen species with non-invasive roots, planted at such spacing to form a uniform green avenue and act as a natural screen. To enhance the ground cover and provided a lush visual effect, Alternanthera shrubs shall be planted underneath, creating a layered planting scheme that adds color, texture, and density to the landscape. |
| 10 | Design For Electric Supply Including Street Lighting The project will be equiped with high street lighting poles, fabricated from hot-dip galvanized steel for enhanced durability and corrosion resistance. Each pole will be fitted with energy-efficient LED street lights. The network will include evenly spaced inspection chambers for ease of maintenance. c/c as per requirments. |
| 11 | Community Buildings The ground floor of the clubhouse is dedicated entirely to a community building, designed to serve as a central space for social interaction, gatherings and recreational activities for residents. The layout ensures accessibility, functional utility, and a welcomoing environment, fostering a sense of community within development. |
| 12 | Treatment and Disposal System of Sewage and Sullage water The development is equipped with a well-planned sewer network of wastewater pipes and soil waste pipes. These pipelines are connected to strategically located inspection chambers, ensuring ease of maintenance and monitoring. The entire network leads to the STP, where wastewater is treated to prescribed standards. The treated water is then stored in an RCC storage tank and reused for garden irrigation thereby promoting sustainability and reducing fresh water consumption. |
| 13 | Solid Waste Management And Disposal System Garbage generated within the project will be manually collected from each floor and transported to a designated garbage processing area. After segregation and temporary processing, the waste shall be removed from the site by the Municiple Corporation, ensuring hygienic handling, compliance with local regulations and maintenance of a clean and healthy environment within the premises. |
| 14 | Water Conservation System The treated water is then stored in an RCC storage tank and reused for garden irrigation and drip irrigation along the roadside, thereby promoting sustainability and reducing fresh water consumption. |
| 15 | Energy Management System Including Use of Renewable Energy The project shall be equipped with a solar water heating system for kitchens designed to comply with the Energy Management System (EMS) requirments. The system utilizes renewable solar energy to reduce conventional energy consumption, enhance sustainability, and support efficient energy management across the development. |
| 16 | Fire Protection And Fire Safety System The project shall be equipped with a comprehensive fire protection and fire safety system in compliance with applicable fire safety regulations and the fire approval. Key components include- Fire extinguishers for localised fire control. Hose reels and wet risers for immediate fire fighting access. Yard hydrants for outdoor fire suppression. Automatic sprinkler system for continuous area protection. Manually operated electric fire systems and electrically operated fire system for emergency intervention. Automatic detection and alarm system for early warning and safety monitoring. Underground static water storage tank and terrace tanks to ensure adequate water supply for firefighting. Pump near UG tank to maintain pressure and facilitate rapid water delivery to all firefighting systems. This integrated system ensures efficient fire response, occupant safety, and compliance with statutory fire safety standards throughout the development. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services The ground floor of the clubhouse is dedicated entirely to a community building, designed to serve as a central space for social interaction, gatherings, and recreational activities for residents. The layout ensures accessibility, functional utility, and a welcoming environment, fostering a sense of community within the development. |
| 18 | Emergency Evacuation Services A dedicated refuge area has been provided on the 18th floor, adjacent to Staircase-1, to ensure the safety of occupants in the event of a fire or emergency. The space is designed to comply with fire safety regulations, offering a protected and easily accessible safe zone where residents can temporarily assemble while awaiting evacuation or rescue. |
| 19 | Other Miscellaneous Work Club House with recreational activities. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 9 Sept 2030.
Sanctioned by Kanpur Development Authority · 6,672 sqm of land · an approved plan of 2 blocks and 181 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Group Housing /08050/KDA/BP/23-24/1399/21072025 | 10 Sept 2025 | 9 Sept 2030 | 6 Jan 2033 | 21 Sept 2030 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 793 | 695 | Khasra |
| 221 | 2715 | Khasra |
| 224 | 890 | Khasra |
| 214 | 367.88 | Khasra |
| 222 | 900 | Khasra |
| 223 | 900 | Khasra |
| 215 | 257.10 | Khasra |
| Sale deed · X 521156 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · M 844246 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · A 662330 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · Y 783406 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · B 906456 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · AK 605411 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · G 196925 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · IN-UP22306574108610V The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · IN-UP86679594461593V The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · IN-UP73330505930985V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP73328824008532V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Certified khatauni (all) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · GY 877215 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · IN-UP73327766448456V The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Land Area Statement The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Updated Khatauni An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 27 Sept 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Sept 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 25 Sept 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Sept 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 25 Sept 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 25 Sept 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 25 Sept 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 25 Sept 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Sept 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 27 Sept 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 27 Sept 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 27 Sept 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 15 Oct 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 25 Sept 2025 ↗ |
Quarterly progress reports
4 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
4 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 7% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 7% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 11% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 22% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | RATAN HOUSING DEVELOPMENT LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM15031 |
| PAN | AACCR6099R |
| CIN / TAN | U17117UP1998PLC023288 |
| Name of chairman | MR ATMA RAM KHATRI |
| Registered address | 113/70, SWAROOP NAGAR, KANPUR |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ANUBHAV MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 15/265, Civil Lines, Kanpur Nagar, Kanpur Nagar, Uttar Pradesh 208001 |
| RERA contact |
| Legal name | SUDHIR KUMAR MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 15/265, Civil Lines, Ajyori, PO- Kanpur, Dist- Kanpur Nagar, Uttar Pradesh 208001 |
| RERA contact |
| Legal name | ANURADHA MEHROTRA |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | 15/265, Civil Lines, Ajyori, Kanpur Nagar, Uttar Pradesh 208001 |
| RERA contact |
Nearby projects
Kanpur Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | RATAN HOUSING DEVELOPMENT LIMITED COLLECTION ACCOUNT FOR SHRI KRISHNA RATANBankPUNJAB NATIONAL BANKBranchMALL ROAD KANPURBranch addressKANPUR, UTTAR PRADESH, 280001Branch districtKanpur NagarA/C no.IFSCPUNB0025500Branch emailb00255@pnb.co.in |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | RATAN HOUSING DEVELOPMENT LIMITED SEPARATE ACCOUNT FOR SHRI KRISHNA RATANBankPUNJAB NATIONAL BANKBranchMALL ROAD KANPURBranch addressKANPUR, UTTAR PRADESH, 280001Branch districtKanpur Nagar, Uttar PradeshA/C no.IFSCPUNB0025500 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | RATAN HOUSING DEVELOPMENT LIMITED TRANSACTION ACCOUNT FOR SHRI KRISHNA RATANBankPUNJAB NATIONAL BANKBranchMALL ROAD, KANPURBranch addressKANPUR, UTTAR PRADESH 280001Branch districtKanpur Nagar, Uttar PradeshA/C no.IFSCPUNB0025500 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Shri Krishna Ratan
Is Shri Krishna Ratan RERA registered?
Yes. Shri Krishna Ratan is registered with UPRERA under registration number UPRERAPRJ890175, registered on 3 Dec 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Shri Krishna Ratan?
The completion date filed with UPRERA is 21 Sept 2030. No completion certificate is on record yet.
Who is the builder of Shri Krishna Ratan?
RATAN HOUSING DEVELOPMENT LIMITED is the promoter entity that filed Shri Krishna Ratan with UPRERA (promoter RERA ID UPRERAPRM15031). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Shri Krishna Ratan have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Shri Krishna Ratan located?
Shri Krishna Ratan is registered in Sambharpur & Bairi Akbarpur Kachhar, Kanpur, Kanpur Nagar, as filed with UPRERA.
What configurations are available in Shri Krishna Ratan?
The unit plan filed with UPRERA lists SHOP, 3 BHK, PENTHOUSE, 2 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Shri Krishna Ratan?
The approved unit plan filed with UPRERA runs from 15 to 187 m² of carpet area (about 161 to 2,014 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Shri Krishna Ratan?
The approved unit plan describes 2 blocks and 181 units of which 176 are homes and 5 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Shri Krishna Ratan?
About 110 units per acre: 181 planned units across 1.65 acres (6,672 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗