SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL)

UPRERARegistered

SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) is a RERA-registered residential project by PINK CITY PROPERTIES PRIVATE LIMITED in Mathura (RERA ID UPRERAPRJ702557). Registered with a completion deadline of 18 Nov 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Oct–Dec 2024
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q1'23
—Q2'23
100%Q3'23
100%Q4'23
100%Q1'24
100%Q2'24
100%Q3'24
100%Q4'24

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ702557
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMathura-Vrindavan Development Authority
Proposed start20 May 2019
Project duration66 months
AddressMathura, Mathura
TehsilMathura
Applicant typeCompany
Applicant address19 B KALA BAGH AJMER RAJASTHAN
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    20181006130858087

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion certificate filed

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Jul 2019
Original completion19 May 2024
Revised completion18 Nov 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 May 2023
Registration fee₹38,500
Sanctioning authorityMathura-Vrindavan Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
BAJAJ CONSTRUCTIONS
License CA/19742/96
ANUPAMA BAJAJ A 8/7 KRISHNA NAGAR MATHURA 281004
Engineer
BAJAJ CONSTRUCTIONS
SUNDEEP BAJAJ A 8/7 KRISHNA NAGAR MATHURA 281004
Contractor
SUKHDEV GOLA
SANT COLONY VRINDAVAN
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER MVDA APPROVED MAP UPLOADED HEREWITH
2Boundary Wall
10 FEET HEIGHT BOUNDARY WORK WITH RCC COLUMN AND BEAM WITH FENCING HAS BEEN STARTED
3Road Work
THE WORK WILL START AFTER THE COMPLETION OF BOUNDARY WALL WORK
4Footpaths
THE WORK WILL START AFTER THE COMPLETION OF BOUNDARY WALL WORK
5Water Supply Including Drinking Water Facilities
WATER SUPPLY WILL BE MADE FROM THE BORING OF BOREWELL AND WILL BE ACCUMULATED IN UNDERGROUND STORAGE TANK AT SITE AND THEREUPON WILL BE PROVIDED TWO TIMES IN MORNING AND EVENING FOR SET HOURS THROUGH PUMP STATION. THE WORK WILL BE COMPLETED AFTER THE COMPLETION OF CONSTRUCTION OF UNDERGROUND WATER TANK ALONG WITH ROAD WORK TO ALLOCATE SEPARATE WATER CONNECTION FOR EACH PLOT
6Sewer System
THE WORK WILL START ALONG WITH THE CONSTRUCTION OF ROAD WORK
7Drain
THE WORK WILL START ALONG WITH THE CONSTRUCTION OF ROAD WORK
8Parks
DEVELOPMENT OF PARK AND LANDSCAPING WILL START AFTER COMPLETION OF BOUNDARY WALL AND DEMARCATION OF EACH PLOT
9Tree Planting
DEVELOPMENT OF PARK AND LANDSCAPING WILL START AFTER COMPLETION OF BOUNDARY WALL AND DEMARCATION OF EACH PLOT
10Design For Electric Supply Including Street Lighting
THE WORK WILL BE STARTED ALONG WITH THE ROAD WORK
11Community Buildings
NO COMMUNITY BUILDING WILL BE PROVIDED AS PER APPROVED MAP
12Treatment and Disposal System of Sewage and Sullage water
SEPTIC TANKS WILL BE CONSTRUCTED FOR THE DISPOSAL OF SEWAGE AND SULLAGE WATER
13Solid Waste Management And Disposal System
DUSTBINS WILL BE INSTALLED
14Water Conservation System
RAINWATER HARVESTING SYSTEM WILL BE INSTALLED
15Energy Management System Including Use of Renewable Energy
STREET LIGHT WITH SOLAR PANEL WILL BE INSTALLED
16Fire Protection And Fire Safety System
NOT APPLICABLE
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
NOT APPLICABLE
19Other Miscellaneous Work
AS PER APPROVALS
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 19 May 2024.

Sanctioned by Mathura-Vrindavan Development Authority · 6,616 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2018100613085808720 May 201919 May 202419 May 202719 May 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 18 Nov 2024.

#Granted fromExtended uptoNote
119 May 202418 Nov 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

48 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
985334.44Khasra
984167.22Khasra
98441.8Khasra
985 -995167.22Khasra
98489.18Khasra
984104.51Khasra
984334.44Khasra
98483.61Khasra
98483.61Khasra
985120.5Khasra
986-98791.85Khasra
984122.5Khasra
986-992418.05Khasra
984418.05Khasra
986150.49Khasra
98483.61Khasra
985-990334.44Khasra
98481.87Khasra
985-986193.55Khasra
986 999 1002167.22Khasra
986 999 1002501.66Khasra
986 999 1002501.66Khasra
988 99283.61Khasra
986 992476.58Khasra
984167.22Khasra
992167.22Khasra
984125.41Khasra
991-99263.17Khasra
986-99941.8Khasra
986-992102.18Khasra
986 991 992588.3Khasra
98483.61Khasra
984125.41Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 8532
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13177
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2936
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2771
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8340
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15008
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9547
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6525
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6524
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6523
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9497
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8881
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 43
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1703
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15265
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13916
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6018
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8105
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7853
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12666
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7630
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 9032
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8414
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7632
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2772
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 14364
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 278
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12665
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 6761
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8626
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7410
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 7411
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 8474
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Jun 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New12 Jun 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 May 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 May 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New22 Jun 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New12 Jun 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 May 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 May 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New31 May 2019 ↗

Quarterly progress reports

19 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

19 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2100%CA ↗ · Arch ↗ · Eng ↗
2023-Q3100%CA ↗ · Arch ↗ · Eng ↗
2023-Q4100%CA ↗ · Arch ↗ · Eng ↗
2024-Q1100%CA ↗ · Arch ↗ · Eng ↗
2024-Q2100%CA ↗ · Arch ↗ · Eng ↗
2024-Q3100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2024-Q3. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePINK CITY PROPERTIES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM86272
PANAACCP2468E
CIN / TANJPRP02469F
Name of chairmanKRISHNA KUMAR ARORA
Registered address19 B KALA BAGH AJMER RAJASTHAN
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Mathura

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PINK CITY PROPERTIES PRIVATE LIMITEDBankHDFC BANK LIMITEDBranchVRINDAVANA/C no.IFSCHDFC0000942
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL)

Is SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) RERA registered?

Yes. SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) is registered with UPRERA under registration number UPRERAPRJ702557, registered on 2 Jul 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) been completed?

UPRERA still lists SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) as Registered, so it is not shown as completed here. A completion certificate dated 29 May 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL)?

PINK CITY PROPERTIES PRIVATE LIMITED is the promoter entity that filed SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) with UPRERA (promoter RERA ID UPRERAPRM86272). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) more time to complete?

UPRERA's record carries 1 completion extension for SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL), the latest running to 18 Nov 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) located?

SHRI KRISHNA SHARNAM EXTENSION (RESIDENTIAL) is registered in Mathura, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗