Signature Park Sector 2 & 3 is a RERA-registered residential project by SWASTIK MULTITRADE PRIVATE LIMITED in Lucknow (RERA ID UPRERAPRJ422497). Registered with a completion deadline of 31 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ422497 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2022 |
| Project duration | 60 months |
| Address | Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Company |
| Applicant address | 1/51, Vivek Khand Gomti Nagar Lucknow UP 226010 IN |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
103/Integrated/Layout/2021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 1 Apr 2022 |
| Original completion | 31 Dec 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹6,03,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots To be done by CC pillers. |
| 2 | Boundary Wall NA |
| 3 | Road Work From the main entrance gate we have RCC road through out the project of width 7.5m,9m,12m,18m,24m respectively. |
| 4 | Footpaths Interlocking tiles and green grass. |
| 5 | Water Supply Including Drinking Water Facilities We will provide 2 Nos of pump for the requirement of blocks through underground pipelines, borewell, 3Nos of capacity. |
| 6 | Sewer System Modular sewerage system shall be provided. All sewerage water shall go to the STP and overflow from the STP shall go to the sewerage system provided by the municipality. |
| 7 | Drain Storm water tank shall be provided. Storm water from roads and other landscapes shall go to rain water harvesting pit for recharge of ground water level through storm water drain channel. Overflow from this pit will go to Municipal drain line. |
| 8 | Parks We will provide green area with different activities and the green area will have gaming facilities for kids. |
| 9 | Tree Planting We will provide many types of trees all along the divider and footpaths. |
| 10 | Design For Electric Supply Including Street Lighting We will design and implement the system as per the local electricity board and will consider centralized transformer, HT panel, LT panel, Feeder pillar and DG back for common services like external lighting, STP, Pump room, etc. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Modular Sewerage system shall be provided. All the water will go to STP and overflow from STP will go to municipal drain. |
| 13 | Solid Waste Management And Disposal System There is a proper garbage collection area provided for solid waste management. |
| 14 | Water Conservation System We will suggest individuals to use low flow fixtures as well as dual flush cisterns and raw water harvesting system to reduce water consumption and improve ground water level. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fittings in the external areas as well as solar lights. In the pump room also we will use energy efficient motors. We will also suggest Individuals to use energy efficient lights and electrical equipments. |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 30 Aug 2026.
Sanctioned by Lucknow Development Authority · 1,19,523 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 103/Integrated/Layout/2021 | 31 Aug 2021 | 30 Aug 2026 | 30 Aug 2029 | 31 Dec 2026 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
122 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 1862 | 820 | Khasra |
| 1840 | 1620 | Khasra |
| 1839 | 210 | Khasra |
| 1841 | 480 | Khasra |
| 1856 | 510 | Khasra |
| 1845 MI | 1800 | Khasra |
| 1845 MI | 1800 | Khasra |
| 1847 | 3160 | Khasra |
| 1849 ka | 380 | Khasra |
| 1850 | 1010 | Khasra |
| 1852 | 380 | Khasra |
| 1542 | 760 | Khasra |
| 1944 | 250 | Khasra |
| 1952 | 510 | Khasra |
| 1955 | 130 | Khasra |
| 1968 | 130 | Khasra |
| 1861 | 250 | Khasra |
| 1865 | 190 | Khasra |
| 1853 | 757.5 | Khasra |
| 1873 | 2370 | Khasra |
| 1706 | 1300 | Khasra |
| 1870 | 1570 | Khasra |
| 1853 | 252 | Khasra |
| 1873 | 790 | Khasra |
| 1859 | 1260 | Khasra |
| 1854 | 1520 | Khasra |
| 1855 | 1260 | Khasra |
| 1821 | 65 | Khasra |
| 1808 | 65 | Khasra |
| 1858 | 1140 | Khasra |
| 1857 | 4670 | Khasra |
| 1860 | 890 | Khasra |
| 1871 | 1320 | Khasra |
| 1735 | 298 | Khasra |
| 1828 | 76 | Khasra |
| 1829 | 101 | Khasra |
| 1830 | 101 | Khasra |
| 1832 | 101 | Khasra |
| 1833 | 63 | Khasra |
| 1862 | 164 | Khasra |
| 1827 | 76 | Khasra |
| 1863 | 225 | Khasra |
| 1802 | 250 | Khasra |
| 1862 | 492 | Khasra |
| 1916 | 526.6 | Khasra |
| 1870 | 1570 | Khasra |
| 1868 | 130 | Khasra |
| 1869 | 510 | Khasra |
| 1864 | 370 | Khasra |
| 1872 MI | 1520 | Khasra |
| 1901 | 1640 | Khasra |
| 1874KA | 505 | Khasra |
| 1721 | 510 | Khasra |
| 1874 KHA | 2304 | Khasra |
| 1874 KHA | 3455 | Khasra |
| 1874 KHA | 1151 | Khasra |
| 1874 KHA | 505 | Khasra |
| 1946 | 2610 | Khasra |
| 1957 | 510 | Khasra |
| 1875 | 1706 | Khasra |
| 1878 | 1360 | Khasra |
| 1882 KA | 630 | Khasra |
| 1916 | 260 | Khasra |
| 1875 | 568 | Khasra |
| 1877 | 190 | Khasra |
| 1880 | 740 | Khasra |
| 1881 | 7005 | Khasra |
| 1888 | 1010 | Khasra |
| 1881 | 2335 | Khasra |
| 1881 | 1167 | Khasra |
| 1883 | 273.3 | Khasra |
| 1884 | 440 | Khasra |
| 1883 | 546.6 | Khasra |
| 1884 | 880 | Khasra |
| 1879 | 970 | Khasra |
| 1885 | 630 | Khasra |
| 1886 | 1640 | Khasra |
| 1847 MI | 560 | Khasra |
| 910 | 950 | Khasra |
| 913 | 2940 | Khasra |
| 913 | 2940 | Khasra |
| 916 | 2850 | Khasra |
| 917 | 2350 | Khasra |
| 921 | 860 | Khasra |
| 923 | 2950 | Khasra |
| 923 | 2950 | Khasra |
| 926 | 2530 | Khasra |
| 926 | 12110 | Khasra |
| 930 | 4216 | Khasra |
| 931 MI | 2530 | Khasra |
| 933 MI | 1010 | Khasra |
| 932 | 2280 | Khasra |
| 933 MI | 760 | Khasra |
| 938 | 1640 | Khasra |
| 931 JHA | 2150 | Khasra |
| 933 MI | 380 | Khasra |
| 937 | 341 | Khasra |
| 936 | 170 | Khasra |
| 933 MI | 2530 | Khasra |
| 936 | 170 | Khasra |
| 931 JHA MI | 1260 | Khasra |
| 933 MI | 1260 | Khasra |
| 931 MI | 1260 | Khasra |
| 944 CHHA MI | 1260 | Khasra |
| Sale deed · 9040 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9041 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8832 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4990 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 19657 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12401 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1329 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 19220 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 18083 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1600 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 16095 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3375 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4099 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 16515 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 21223 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 16448 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6839 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1048 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12341 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14316 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 341 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6588 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5665 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1024 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 90 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7416 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17977 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7609 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3356 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15346 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15344 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5045 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 11926 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4363 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3780 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 14362 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1772 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 991 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5341 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8256 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1325 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3903 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4337 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 873 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5619 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3777 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2054 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 19 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1427-1432 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 17 Feb 2022 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 24 Jan 2022 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 24 Jan 2022 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 24 Jan 2022 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 24 Jan 2022 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 24 Jan 2022 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 24 Jan 2022 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 24 Jan 2022 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 25 Jan 2022 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 25 Jan 2022 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 24 Jan 2022 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 24 Jan 2022 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 25 Jan 2022 ↗ |
Quarterly progress reports
18 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
18 quarterly progress reports are on file with UPRERA, covering 2021-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 15.37% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 16.22% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 17% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 17.78% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SWASTIK MULTITRADE PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM38806 |
| PAN | AAPCS8001F |
| CIN / TAN | U74900UP2011PTC044734 |
| Name of chairman | SIDDHARTH SHARMA |
| Registered address | 1/51, Vivek Khand Gomti Nagar Lucknow UP 226010 IN |
| RERA contact | |
| Registered since | 2018 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Swastik Multitrade Private Limited - Signature Park Sector 2 and 3 RERA Collection A/cBankICICI BankBranchAlambag LucknowBranch addressICICI Bank Alambag LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000318 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Swastik Multitrade Private Limited - Signature park sector 2 and 3 RERA Retention A/cBankICICI BankBranchAlambag LucknowBranch addressICICI Bank Alambag LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000318 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Swastik Multitrade Private Limited Transaction Account for Signature park sector 2 and 3BankICICI BankBranchAlambag LucknowBranch addressICICI Bank Alambag LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCICIC0000318 |
What has changed on this record
3 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 104 (Under Registration - 2 ) → 104 (Under Registration - 1 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 104 (Under Registration - 3 ) → 104 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 104 (Under Registration - 4 ) → 104 (Under Registration - 3 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 13 Oct 2026 · 3 movements on record |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Signature Park Sector 2 & 3
Is Signature Park Sector 2 & 3 RERA registered?
Yes. Signature Park Sector 2 & 3 is registered with UPRERA under registration number UPRERAPRJ422497, registered on 1 Apr 2022. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Signature Park Sector 2 & 3?
The completion date filed with UPRERA is 31 Dec 2026. No completion certificate is on record yet.
Who is the builder of Signature Park Sector 2 & 3?
SWASTIK MULTITRADE PRIVATE LIMITED is the promoter entity that filed Signature Park Sector 2 & 3 with UPRERA (promoter RERA ID UPRERAPRM38806). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Signature Park Sector 2 & 3 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Signature Park Sector 2 & 3 located?
Signature Park Sector 2 & 3 is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗