SOLITAIRIAN CITY - (PARY) PHASE-2

UPRERARegistered

SOLITAIRIAN CITY - (PARY) PHASE-2 is a RERA-registered residential project by PARY DEVELOPERS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ6856). Registered with a completion deadline of 29 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
40%Q3'25
43%Q4'25
50%Q1'26
53%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6856
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryYamuna Expressway Authority
Proposed start8 Sept 2014
Original start8 Sept 2014
Project duration146 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressB-22, 6TH FLOOR POCKET, 9-A, JASOLA, DELHI-110025
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    YEA/PLANNING/BP-27/1035

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Permit revalidated (2)

  5. 2 building permits sanctioned

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. to

    Extension granted

  9. valid to

    Permit revalidated

    Y.E.A./NIYOJAN/98/2024

  10. Building permit sanctioned

    Y.E.A./NIYOJAN/98/2024

  11. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  12. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion31 Dec 2021
Revised completion29 Oct 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹27,500
Sanctioning authorityYamuna Expressway Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors273 · 2 · 26 (units from plan)
ConfigurationUnitsCarpet area
2 BHK27359-73
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T2 · OTHER, 2 BHK2613659-73
T3 · OTHER, 2 BHK2613759-73
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VISHAL SHARMA
License CA-98/23261
NEW DELHI
Engineer
VINTECH CONSULTANAT
NEW DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
Green Belts plus 40 Meter Double road at front Plot & Right hand side 32 meter road and 32 meter back side road.
2Boundary Wall
2.1 Meter Height Boundary wall on total plot area.
3Road Work
6 meter Front 22 Meter Wide roads plus 30 Meter wide internal road.
4Footpaths
4 feet wide foot path surrounding the green area.
5Water Supply Including Drinking Water Facilities
There are 3 under ground reservoir.
6Sewer System
External Sewerage System with STP.
7Drain
External & Internal Drain with Rain Water Harvesting.
8Parks
Total Landscape area including Roads is 50258 Sq. Meter.
9Tree Planting
There is Total 544 Trees including Evergreen tree 304.
10Design For Electric Supply Including Street Lighting
2 way poles around the Entire inside circular roads.
11Community Buildings
Double Story Club House of 22000 Sqft Area.
12Treatment and Disposal System of Sewage and Sullage water
STP & Provision of Effulant Water for the Greens.
13Solid Waste Management And Disposal System
it`s plan as per environmental Norms.
14Water Conservation System
Rain Water Harvesting 8 nos. 4.25 m Dia X 4.5 m Depth.
15Energy Management System Including Use of Renewable Energy
As per the Minister of Renewal of Energy
16Fire Protection And Fire Safety System
Sprinklers and Alarm Systems are proposed for all Units.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Main Club and Roof top Club.
18Emergency Evacuation Services
As per the Norms and Fire NOC already Received.
19Other Miscellaneous Work
Swimming Pool, Tennis club, Badminton Court ETC.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
2PROPSHOPUPRERAAGT10129
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

4 permits

An approval and the date it runs to - not proof the work matching it was done.

4 sanctioning permits are on record with UPRERA, the latest valid to 10 Jul 2028. 3 of them carry a revalidation, the latest valid to 10 Jul 2028.

Sanctioned by Yamuna Expressway Authority · 4,457 sqm of land · an approved plan of 2 blocks and 273 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
YEA/PLANNING/BP-27/10358 Sept 201421 Feb 201921 Feb 202431 Dec 2021—
YEA/Niyojan/BP-27/843/202030 Sept 202010 Jul 202310 Jul 202830 Jun 202230 Sept 2020
valid to 10 Jul 2028
Y.E.A./NIYOJAN/BP-27/843/202030 Sept 202010 Jul 202310 Jul 202830 Jun 202630 Sept 2020
valid to 10 Jul 2028
Y.E.A./NIYOJAN/98/202428 Jun 202410 Jul 202810 Jul 202830 Jun 202628 Jun 2024
valid to 10 Jul 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 29 Oct 2026.

#Granted fromExtended uptoNote
131 Dec 202129 Oct 2026Six months extension in view of force majeure caused by covid-19 pandemic
230 Jun 202229 Oct 2026—
330 Jun 202629 Oct 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

13 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-B-121622.60Plot
GH-B-245389Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 23 Jul 2014.

Registry no.DateTypeArea
2405423 Jul 2014other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 24054
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 32715
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · Application for Extension of Registration of Project Pary Phase-2
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · RA-3 ( Application for Change Bank Accounts) with Bank Statements
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old31 Jul 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old31 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterUGT AND OHT
Fire safety (as filed with RERA)FIRE TANK, FHC AND SPRINKLER
Health serviceSTP
Renewable energyNO
Other facilitiesCLUB, GARDEN, POWER BACK UP

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q240%CA ↗ · Arch ↗ · Eng ↗
2025-Q343%CA ↗ · Arch ↗ · Eng ↗
2025-Q450%CA ↗ · Arch ↗ · Eng ↗
2026-Q153%Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePARY DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM7796
PANAADCP4564C
CIN / TANU45201DL2004PTC127656
Registered addressB-22, 6TH FLOOR POCKET, 9-A, JASOLA, DELHI-110025
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Pary Developers Pvt Ltd Collection A/c for Solitairian City (Pary) Phase-2BankICICI BankBranchShakti Khand-2 , Indirapuram , GhaziabadBranch addressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram , Ghaziabad, Uttar Pradesh, PIN-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0001654Branch emailshipra.mendiratta [at] icici.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Pary Developers Pvt. Ltd. RERA Designated A/c Solitairian City (Pary) Phase-2BankICICI BankBranchShakti Khand 2, Indirapuram, GhaziabadBranch addressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand 2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0001654
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Pary Developers Pvt Ltd RERA Transaction A/c for Solitairian City (Pary) Phase-2BankICICI BankBranchShakti Khand-2, Indirapuram, GhaziabadBranch addressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0001654Branch emailshipra.mendiratta [at] icici.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

9 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)67 (Under Registration - 0 ) → 68 (Under Registration - 1 )
changed in Estanzo’s record
13 Oct 2026
Revised completion date on file2026-10-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 3 — extended upto
2026-10-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2026-06-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2022-06-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-06-30 → 2026-10-30
changed in Estanzo’s record
5 Sept 2026
Completion extension
no. 3
extension 3 to 2026-10-30
newly filed with RERA
5 Sept 2026
Sanctioning permit
no. 4
Y.E.A./NIYOJAN/98/2024
newly filed with RERA
16 Aug 2026
Sanctioning permit
no. 3
Y.E.A./NIYOJAN/BP-27/843/2020
newly filed with RERA
16 Aug 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SOLITAIRIAN CITY - (PARY) PHASE-2

Is SOLITAIRIAN CITY - (PARY) PHASE-2 RERA registered?

Yes. SOLITAIRIAN CITY - (PARY) PHASE-2 is registered with UPRERA under registration number UPRERAPRJ6856, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SOLITAIRIAN CITY - (PARY) PHASE-2?

The completion date filed with UPRERA is 29 Oct 2026. No completion certificate is on record yet.

Who is the builder of SOLITAIRIAN CITY - (PARY) PHASE-2?

PARY DEVELOPERS PRIVATE LIMITED is the promoter entity that filed SOLITAIRIAN CITY - (PARY) PHASE-2 with UPRERA (promoter RERA ID UPRERAPRM7796). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SOLITAIRIAN CITY - (PARY) PHASE-2 more time to complete?

UPRERA's record carries 3 completion extensions for SOLITAIRIAN CITY - (PARY) PHASE-2, the latest running to 29 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SOLITAIRIAN CITY - (PARY) PHASE-2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SOLITAIRIAN CITY - (PARY) PHASE-2 located?

SOLITAIRIAN CITY - (PARY) PHASE-2 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in SOLITAIRIAN CITY - (PARY) PHASE-2?

The unit plan filed with UPRERA lists OTHER and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SOLITAIRIAN CITY - (PARY) PHASE-2?

The approved unit plan filed with UPRERA runs from 59 to 73 m² of carpet area (about 631 to 780 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SOLITAIRIAN CITY - (PARY) PHASE-2?

The approved unit plan describes 2 blocks and 273 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SOLITAIRIAN CITY - (PARY) PHASE-2?

About 248 units per acre: 273 planned units across 1.10 acres (4,457 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗