SOLITAIRIAN CITY - (PARY) PHASE-3 is a RERA-registered residential project by PARY DEVELOPERS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ6887). Registered with a completion deadline of 30 Jun 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ6887 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Yamuna Expressway Authority |
| Proposed start | 1 Jan 2017 |
| Original start | 1 Jan 2017 |
| Project duration | 138 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | B-22, 6TH FLOOR POCKET, 9-A, JASOLA, DELHI-110025 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
YEA/PLANNING/BP-27/1035
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- valid to
Permit revalidated
YEA/PLANNING/BP-27/1035
Building permit sanctioned
YEA/PLANNING/BP-27/1035
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 31 Dec 2022 |
| Revised completion | 30 Jun 2028 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹42,500 |
| Sanctioning authority | Yamuna Expressway Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK277 78%
- 3 BHK50 14%
- 4 BHK27 8%
- OTHER2 1%
| Configuration | Units | Carpet area |
|---|---|---|
| OTHER | 2 | 312-966 |
| 4 BHK | 27 | 315 |
| 2 BHK | 277 | 66-148 |
| 3 BHK | 50 | 171 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| S1 · OTHER, 4 BHK, 2 BHK, 3 BHK | 30 | 79 | 148-315 |
| S5 · OTHER, 2 BHK | 33 | 277 | 66-75 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Green Belts plus 40 Meter Double road at front Plot & Right hand side 32 meter road and 32 meter back side road. |
| 2 | Boundary Wall 2.1 Meter Height Boundary wall on total plot area |
| 3 | Road Work 6 meter Front 22 Meter Wide roads plus 30 Meter wide internal road. |
| 4 | Footpaths 4 feet wide foot path surrounding the green area. |
| 5 | Water Supply Including Drinking Water Facilities 3 under ground reservoir. |
| 6 | Sewer System External Sewerage System with STP. |
| 7 | Drain External & Internal Drain with Rain Water Harvesting. |
| 8 | Parks Total Landscape area including Roads is 50258 Sq. Meter. |
| 9 | Tree Planting There is Total 544 Trees including Evergreen tree 304. |
| 10 | Design For Electric Supply Including Street Lighting 2 way poles around the Entire inside circular roads. |
| 11 | Community Buildings Double Story Club House of 22000 Sqft Area. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP & Provision of Effulant Water for the Greens. |
| 13 | Solid Waste Management And Disposal System it`s plan as per environmental Norms. |
| 14 | Water Conservation System Rain Water Harvesting 8 nos. 4.25 m Dia X 4.5 m Depth. |
| 15 | Energy Management System Including Use of Renewable Energy As per the Minister of Renewal of Energy. |
| 16 | Fire Protection And Fire Safety System Sprinklers and Alarm Systems are proposed for all Units. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Main Club and Roof top Club |
| 18 | Emergency Evacuation Services As per the Norms and Fire NOC already Received. |
| 19 | Other Miscellaneous Work Swimming Pool, Tennis club, Badminton Court ETC. |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | INVESTORS CLINIC INFRATECH PRIVATE LIMITED | UPRERAAGT10052 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 10 Jul 2023. 1 of them carries a revalidation, valid to 10 Jul 2028.
Sanctioned by Yamuna Expressway Authority · 7,449 sqm of land · an approved plan of 2 blocks and 356 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| YEA/PLANNING/BP-27/1035 | 8 Sept 2014 | 21 Feb 2019 | 21 Feb 2024 | 31 Dec 2022 | — | |
| YEA/PLANNING/BP-27/1035 | 30 Sept 2020 | 10 Jul 2023 | 10 Jul 2028 | 30 Jun 2023 | 30 Sept 2020 valid to 10 Jul 2028 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Jun 2028.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2022 | 30 Jun 2023 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2023 | 31 Mar 2025 | — |
| 3 | 31 Mar 2025 | 30 Jun 2028 | — |
Land & documents
13 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-B-1 | 21622.60 | Plot |
| GH-B-2 | 45389 | Plot |
1 registry or lease-deed filing is on this project’s record with UPRERA, dated 23 Jul 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 24054 | 23 Jul 2014 | other | — |
| Registry document · 24054 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 32715 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · Application to YEIDA for Maps with Challan copy The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Application to YEIDA for Maps with Challan copy The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Application to YEIDA for Maps with Challan copy The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Application to YEIDA for Maps with Challan copy The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Affidavit for Extension of Project Pary 3 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Affidavit for Extension of Registration of Solitairian City(Pary) Phase-3 Project The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Reply of Objection Letter for Extension of Solitairian City (Pary) Phase-3 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · RA-3 Application for Change Bank Accounts with Bank Statements The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 31 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 31 Jul 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | UGT AND OHT |
| Fire safety (as filed with RERA) | fire tank and sprinkler |
| Health service | STP |
| Renewable energy | NO |
| Other facilities | CLUB, GARDEN, POWER BACK UP |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 58% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 60% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 62% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 67% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PARY DEVELOPERS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM7796 |
| PAN | AADCP4564C |
| CIN / TAN | U45201DL2004PTC127656 |
| Registered address | B-22, 6TH FLOOR POCKET, 9-A, JASOLA, DELHI-110025 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Pary Developers Pvt. Ltd. Collection Account for Solitairian City (Pary) Phase-3BankICICI Bank Ltd.BranchShakti Khand-2, Indirapuram, GhaziabadBranch addressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0001654Branch emailshipra.mendiratta[at]icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | PARY DEVELOPERS PVT LTD RERA DESIGNATED A/C SOLITAIRIAN CITY (PARY) PHASE 3BankICICI BankBranchShakti Khand 2, Indirapuram, GhaziabadBranch addressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand 2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0001654 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Pary Developers Pvt Ltd. RERA Transaction Account for Solitairian City (Pary) Phase-3BankICICI Bank Ltd.BranchShakti Khand-2, Indirapuram, GhaziabadBranch addressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0001654Branch emailshipra.mendiratta[at]icicibank.com |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 67 (Under Registration - 0 ) → 68 (Under Registration - 1 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 13 Oct 2026 |
Common questions about SOLITAIRIAN CITY - (PARY) PHASE-3
Is SOLITAIRIAN CITY - (PARY) PHASE-3 RERA registered?
Yes. SOLITAIRIAN CITY - (PARY) PHASE-3 is registered with UPRERA under registration number UPRERAPRJ6887, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SOLITAIRIAN CITY - (PARY) PHASE-3?
The completion date filed with UPRERA is 30 Jun 2028. No completion certificate is on record yet.
Who is the builder of SOLITAIRIAN CITY - (PARY) PHASE-3?
PARY DEVELOPERS PRIVATE LIMITED is the promoter entity that filed SOLITAIRIAN CITY - (PARY) PHASE-3 with UPRERA (promoter RERA ID UPRERAPRM7796). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted SOLITAIRIAN CITY - (PARY) PHASE-3 more time to complete?
UPRERA's record carries 3 completion extensions for SOLITAIRIAN CITY - (PARY) PHASE-3, the latest running to 30 Jun 2028. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does SOLITAIRIAN CITY - (PARY) PHASE-3 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SOLITAIRIAN CITY - (PARY) PHASE-3 located?
SOLITAIRIAN CITY - (PARY) PHASE-3 is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in SOLITAIRIAN CITY - (PARY) PHASE-3?
The unit plan filed with UPRERA lists OTHER, 4 BHK, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SOLITAIRIAN CITY - (PARY) PHASE-3?
The approved unit plan filed with UPRERA runs from 66 to 966 m² of carpet area (about 715 to 10,400 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SOLITAIRIAN CITY - (PARY) PHASE-3?
The approved unit plan describes 2 blocks and 356 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SOLITAIRIAN CITY - (PARY) PHASE-3?
About 193 units per acre: 356 planned units across 1.84 acres (7,449 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗