Spring view Heights is a RERA-registered residential project by Sare Saamag Realty Private Limited in Ghaziabad (RERA ID UPRERAPRJ3863). Registered with a completion deadline of 31 Dec 2023. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ3863 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Dec 2013 |
| Original start | 1 Dec 2013 |
| Project duration | 121 months |
| Address | Modinagar, Ghaziabad |
| Tehsil | Modinagar |
| Applicant type | Company |
| Applicant address | B-67, Sarita Vihar, New Delhi -44 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
178/MP/2017
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
- to
Extension granted
- to
Extension granted
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Jul 2017 |
| Original completion | 1 Feb 2020 |
| Revised completion | 31 Dec 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,15,500 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 2 BHK492 74%
- 3 BHK170 26%
| Configuration | Units | Carpet area |
|---|---|---|
| 2 BHK | 492 | 53-62 |
| 3 BHK | 170 | 84 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 2 BHK, 3 BHK | 14 | 110 | 53-84 |
| B · 2 BHK, 3 BHK | 14 | 112 | 53-84 |
| C · 2 BHK, 3 BHK | 14 | 110 | 53-84 |
| D · 2 BHK, 3 BHK | 14 | 110 | 53-84 |
| E · 2 BHK, 3 BHK | 14 | 110 | 53-84 |
| F · 2 BHK, 3 BHK | 14 | 110 | 53-84 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots "Situated at SAGA City NW 30m Wide Road NE 24m Wide Road SE 18m Wide Road SW 30m Wide master Plan Green & 45m Wide master Plan Road" |
| 2 | Boundary Wall Architectural Boundary Wall, mix of R.C.C & Brick work Finished with Cement Plaster and Paint |
| 3 | Road Work External road bitumen asphalt finish, internal --- mix of trimix & Cement Paver. |
| 4 | Footpaths Mix of Cement Paver & Stone |
| 5 | Water Supply Including Drinking Water Facilities Dual water supply piping for domestic and flushing and providing soft water for drinking treatment plant Plant |
| 6 | Sewer System 360KLD stp plant with MBBR technology. |
| 7 | Drain Recharge Pit System with Ring Main System and balance to drain into Nala(Govt. Open Drain) |
| 8 | Parks Organized green with low height hedge / ground cover /tot lots and walkways |
| 9 | Tree Planting timbers / evergreen /flowering and ornamental trees |
| 10 | Design For Electric Supply Including Street Lighting 33KV/11KV Main Sub-station and Further distribution indivisualy with 11KV/ 415V to all socity and Street Light with Poles |
| 11 | Community Buildings NA -- As already provided in SAGA City |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP Plant with MBBR Technology and reuse treated water in Flushing, road washing and car washing & Gardening etc. |
| 13 | Solid Waste Management And Disposal System Home to Home Collection by Facility management team and put into different garbage sections providing into SAGA City. |
| 14 | Water Conservation System We Take the water from borewells and collect into underground tanks. After treatment we consume the water for drinking, Bathing, cloth washing etc. |
| 15 | Energy Management System Including Use of Renewable Energy Govt. Electricity Supply distribution system with own Sub-station,we are using. |
| 16 | Fire Protection And Fire Safety System We are Providing Internal FHC with Hydrant, External Hydrant, Sprinkler in basement, stilt floor and lift lobby. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA -- As already provided in SAGA City |
| 18 | Emergency Evacuation Services As per NBC |
| 19 | Other Miscellaneous Work .. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 11 May 2022.
Sanctioned by Ghaziabad Development Authority · 22,085 sqm of land · an approved plan of 6 blocks and 662 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 178/MP/2017 | 12 May 2017 | 11 May 2022 | 9 May 2025 | 31 Jan 2021 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
UPRERA’s record carries 5 completion extensions for this project, the latest running to 31 Dec 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Feb 2020 | 31 Jan 2021 | — |
| 2 | 31 Jan 2021 | 30 Jul 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 3 | 30 Jul 2021 | 29 Apr 2022 | — |
| 4 | 29 Apr 2022 | 31 Dec 2022 | — |
| 5 | 31 Dec 2022 | 31 Dec 2023 | — |
Land & documents
121 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 2865 | 2128 | — |
| 2865 | 61.382 | — |
| 2866 | 2365.208 | — |
| 2867 | 2696.239 | — |
| 2868 | 2113.196 | — |
| 2869 | 2331.715 | — |
| 2870 | 3.85 | — |
| 2876 | 1473.101 | — |
| 3010 | 1.5271 | — |
| 3014 | 1254.3737 | — |
| 3015 | 1535.553 | — |
| 3016 | 1465.6616 | — |
| 3020 | 418.1856 | — |
| 2864 | 620.957 | — |
| 2873 | 187.988 | — |
| 2874 | 1590.773 | — |
| 2875 | 1837.21 | — |
| 2865 | 2189.382 | Khasra |
| 2866 | 2365.208 | Khasra |
| 2867 | 2696.239 | Khasra |
| 2868 | 2113.196 | Khasra |
| 2869 | 2331.715 | Khasra |
| 2870 | 3.85 | Khasra |
| 2876 | 1473.101 | Khasra |
| 3010 | 1.5271 | Khasra |
| 3014 | 1254.3737 | Khasra |
| 3015 | 1535.553 | Khasra |
| 3016 | 1465.6616 | Khasra |
| 3020 | 418.1856 | Khasra |
| 2864 | 620.957 | Khasra |
| 2873 | 187.988 | Khasra |
| 2874 | 1590.773 | Khasra |
| 2875 | 1837.21 | Khasra |
19 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 3 May 2006.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 5546 | 18 May 2007 | others | — |
| 3994 | 3 May 2006 | self | — |
| 1972 | 18 May 2007 | others | — |
| 5491 | 18 May 2007 | others | — |
| 5546 | 18 May 2007 | others | — |
| 4075 | 5 May 2006 | self | — |
| 4079 | 5 May 2006 | self | — |
| 4952 | 13 Jul 2007 | others | — |
| 4077 | 5 May 2006 | self | — |
| 4952 | 13 Aug 2007 | others | — |
| 4952 | 13 Aug 2007 | others | — |
| 4952 | 13 Aug 2007 | others | — |
| 4957 | 29 May 2007 | others | — |
| 4955 | 29 Sept 2007 | others | — |
| 4949 | 29 Sept 2007 | others | — |
| 6179 | 12 Jul 2006 | self | — |
| 4957 | 13 Aug 2007 | others | — |
| 6179 | 12 Jul 2006 | self | — |
| 6055 | 10 Jul 2006 | others | — |
| Registry document · 3994,5546 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1972 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5491 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5546 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4075 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4079 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4077,4952 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4952 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4952 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4952,4957 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4955 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4949 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6179 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4957 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6179 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6055 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · POA The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 18 Jul 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 18 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 18 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 18 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 18 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 18 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 18 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 18 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 18 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 28 Jul 2017 ↗ |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | Old | 28 Jul 2017 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | Old | 28 Jul 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 28 Jul 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Agreement for other land The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title. | Old | 28 Jul 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 24 Oct 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 24 Oct 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 24 Oct 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Treated Potable water |
| Fire safety (as filed with RERA) | sprinklar, hydrant |
| Health service | Sewer & Storm water line with recharge pits |
| Renewable energy | as per norms |
| Other facilities | club |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
4 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
4 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Sare Saamag Realty Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM9243 |
| PAN | AAJCS4931L |
| CIN / TAN | U45201DL2005PTC142482 |
| Name of chairman | DEEPAK JYOTI |
| Registered address | B-67, Sarita Vihar, New Delhi -44 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | SARE SAAMAG REALTY PRIVATE LIMITED-Project Spring view Heights - Designated AccountBankBank of IndiaBranchLarge Corporate BranchA/C no.IFSCBKID0006059 |
What has changed on this record
6 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 244 (Under Registration - 4 ) → 245 (Under Registration - 5 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 244 (Under Registration - 5 ) → 244 (Under Registration - 4 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 243 (Under Registration - 5 ) → 244 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 242 (Under Registration - 4 ) → 243 (Under Registration - 5 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 241 (Under Registration - 3 ) → 242 (Under Registration - 4 ) changed in Estanzo’s record | 31 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 241 (Under Registration - 4 ) → 241 (Under Registration - 3 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 13 Oct 2026 · 6 movements on record |
Common questions about Spring view Heights
Is Spring view Heights RERA registered?
Yes. Spring view Heights is registered with UPRERA under registration number UPRERAPRJ3863, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Spring view Heights?
The completion date filed with UPRERA is 31 Dec 2023. No completion certificate is on record yet.
Who is the builder of Spring view Heights?
Sare Saamag Realty Private Limited is the promoter entity that filed Spring view Heights with UPRERA (promoter RERA ID UPRERAPRM9243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Why does Spring view Heights show "default on QPR"?
UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.
Has UPRERA granted Spring view Heights more time to complete?
UPRERA's record carries 5 completion extensions for Spring view Heights, the latest running to 31 Dec 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Spring view Heights have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Spring view Heights located?
Spring view Heights is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in Spring view Heights?
The unit plan filed with UPRERA lists 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in Spring view Heights?
The approved unit plan filed with UPRERA runs from 53 to 84 m² of carpet area (about 568 to 903 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in Spring view Heights?
The approved unit plan describes 6 blocks and 662 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is Spring view Heights?
About 121 units per acre: 662 planned units across 5.46 acres (22,085 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗