SUN BREEZE II (PHASE-1), BBD GREEN CITY

UPRERARegistered

SUN BREEZE II (PHASE-1), BBD GREEN CITY is a RERA-registered residential project by VIRAJ CONSTRUCTIONS PVT. LTD. in Lucknow (RERA ID UPRERAPRJ5534). Registered with a completion deadline of 11 Feb 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5534
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Oct 2013
Original start1 Oct 2013
Project duration101 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address55, Babu Banarsi Das Nagar, Purana Quila, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 3 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Permit revalidated (2)

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Aug 2017
Original completion31 Mar 2020
Revised completion11 Feb 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,26,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors560 · 2 · 14 (units from plan)
  • 2 BHK328 59%
  • 3 BHK208 37%
  • PENTHOUSE24 4%
ConfigurationUnitsCarpet area
2 BHK32878-81
PENTHOUSE24148-200
3 BHK208110
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block-1 (T1-T4) · 2 BHK, PENTHOUSE1433678-148
Block-3 (T9-T12) · 3 BHK, PENTHOUSE14224110-200
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SIKKA ASSOCIATES ARCHITECT
License CA/94/168947
NEW DELHI
Engineer
CECON ENGG
NEW DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
Yes. As per detail drawing
3Road Work
Yes. As Internal Driveway as per design
4Footpaths
Yes. As per detail drawing
5Water Supply Including Drinking Water Facilities
Yes
6Sewer System
Yes
7Drain
Yes
8Parks
Yes. Green areas provided as per norms and design
9Tree Planting
Yes. As per norms
10Design For Electric Supply Including Street Lighting
Yes. Internal lighting as per requirement
11Community Buildings
Yes. Club with swimming pool provided
12Treatment and Disposal System of Sewage and Sullage water
Yes. STP provided with the use of treated waste
13Solid Waste Management And Disposal System
Yes. Provided
14Water Conservation System
Yes. Rain water harvesting provided as per norms
15Energy Management System Including Use of Renewable Energy
Yes. As per norms
16Fire Protection And Fire Safety System
Yes. As per norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Yes. Provided in Township
18Emergency Evacuation Services
Yes. As per norms
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

14 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Aman ChawlaUPRERAAGT11258
2ASA FINCAP ADVISORS LLPUPRERAAGT10926
3BAJRANG MISHRA C/O BASE INFRA SOLUTIONUPRERAAGT13635
4CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
5GOLDEN STAR REAL ESTATESUPRERAAGT10303
6GOVINDA SRIVASTAVAUPRERAAGT14123
7Hitesh KesarwaniUPRERAAGT11538
8INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
9INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
10Rajni DawraUPRERAAGT13519
11REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
12SANJEEV KUMAR BANKAUPRERAAGT10894
13SHREE SAI ASSOCIATESUPRERAAGT11846
14STRAIGHTEDGE REAL ESTATE PRIVATE LIMITEDUPRERAAGT10067
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 12 Aug 2018. 2 of them carry a revalidation, the latest valid to 12 Aug 2021.

Sanctioned by Lucknow Development Authority · 24,175 sqm of land · an approved plan of 2 blocks and 560 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
3526513 Aug 201312 Aug 201812 Aug 202131 Mar 2020—
3526513 Aug 201312 Aug 201812 Aug 202130 Sept 202015 Mar 2019
valid to 12 Aug 2021
3526513 Aug 201312 Aug 201812 Aug 202130 Sept 202015 Mar 2019
valid to 12 Aug 2021
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 11 Feb 2022.

#Granted fromExtended uptoNote
131 Mar 202030 Sept 2020Six months extension in view of force majeure caused by covid-19 pandemic
230 Sept 202012 Aug 2021—
312 Aug 202111 Feb 2022—

Land & documents

31 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SEMRA 88381—
SEMRA 8937—
SEMRA 2742938—
SEMRA 2758365—
SEMRA 27697—
SEMRA 277178—
SEMRA 2781190—
SEMRA 2796459—
SEMRA 2804528—
SEMRA 88381Khasra
SEMRA 8937Khasra
SEMRA 2742938Khasra
SEMRA 2758365Khasra
SEMRA 27697Khasra
SEMRA 277178Khasra
SEMRA 2781190Khasra
SEMRA 2796459Khasra
SEMRA 2804528Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

14 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 15 Mar 2004.

Registry no.DateTypeArea
977823 Oct 2007self—
977823 Oct 2007self—
160215 Feb 2007self—
807623 Aug 2007self—
643012 Jul 2006self—
643112 Jul 2006self—
340723 Mar 2011self—
340723 Mar 2011self—
935318 Jul 2011self—
951429 Oct 2005self—
119386 Jul 2012self—
596716 Jul 2004self—
596716 Jul 2004self—
241715 Mar 2004self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 9778
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1602
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6430
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3407
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9353
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4236
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9514
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5967
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4236
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceYES
Renewable energyYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameVIRAJ CONSTRUCTIONS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM1196
PANAACCV2888C
CIN / TANU45201UP2005PTC030895
Name of chairmanMR. RAVINDRA KUMAR AGARWAL
Registered address55, Babu Banarsi Das Nagar, Purana Quila, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
VIRAJ CONSTRUCTIONS PVT. LTD.BankPUNJAB NATIONAL BANKBranchASHOK MARGA/C no.IFSCPUNB0717700
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)210 (Under Registration - 2 ) → 210 (Under Registration - 1 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)209 (Under Registration - 2 ) → 210 (Under Registration - 2 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)208 (Under Registration - 1 ) → 209 (Under Registration - 2 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)207 (Under Registration - 3 ) → 208 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)207 (Under Registration - 4 ) → 207 (Under Registration - 3 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about SUN BREEZE II (PHASE-1), BBD GREEN CITY

Is SUN BREEZE II (PHASE-1), BBD GREEN CITY RERA registered?

Yes. SUN BREEZE II (PHASE-1), BBD GREEN CITY is registered with UPRERA under registration number UPRERAPRJ5534, registered on 8 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SUN BREEZE II (PHASE-1), BBD GREEN CITY?

The completion date filed with UPRERA is 11 Feb 2022. No completion certificate is on record yet.

Who is the builder of SUN BREEZE II (PHASE-1), BBD GREEN CITY?

VIRAJ CONSTRUCTIONS PVT. LTD. is the promoter entity that filed SUN BREEZE II (PHASE-1), BBD GREEN CITY with UPRERA (promoter RERA ID UPRERAPRM1196). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted SUN BREEZE II (PHASE-1), BBD GREEN CITY more time to complete?

UPRERA's record carries 3 completion extensions for SUN BREEZE II (PHASE-1), BBD GREEN CITY, the latest running to 11 Feb 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does SUN BREEZE II (PHASE-1), BBD GREEN CITY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SUN BREEZE II (PHASE-1), BBD GREEN CITY located?

SUN BREEZE II (PHASE-1), BBD GREEN CITY is registered in Lucknow, as filed with UPRERA.

What configurations are available in SUN BREEZE II (PHASE-1), BBD GREEN CITY?

The unit plan filed with UPRERA lists 2 BHK, PENTHOUSE and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SUN BREEZE II (PHASE-1), BBD GREEN CITY?

The approved unit plan filed with UPRERA runs from 78 to 200 m² of carpet area (about 835 to 2,152 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SUN BREEZE II (PHASE-1), BBD GREEN CITY?

The approved unit plan describes 2 blocks and 560 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SUN BREEZE II (PHASE-1), BBD GREEN CITY?

About 94 units per acre: 560 planned units across 5.97 acres (24,175 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗