Suncity Anantam Vrindavan

UPRERARegistered

Suncity Anantam Vrindavan is a RERA-registered residential project by SUNCITY HI-TECH PROJECTS PRIVATE LIMITED in Mathura (RERA ID UPRERAPRJ541853). Registered with a completion deadline of 13 Feb 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ541853
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMathura-Vrindavan Development Authority
Proposed start16 Aug 2019
Project duration54 months
AddressMathura, Mathura
TehsilMathura
Applicant typeCompany
Applicant addressLGF-10,Vasant square ,Plot-A, Sector-B, Pocket-V, community centre ,Vasant kunj, New Delhi-110070
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    10/V/16-17

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Extension granted (2)

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Permit revalidated (2)

  7. 2 building permits sanctioned

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Aug 2019
Original completion15 Aug 2022
Revised completion13 Feb 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary22 Oct 2024
Registration fee₹17,88,000
Sanctioning authorityMathura-Vrindavan Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MEENAKSHI KAPUR
License CA/2005/36433
224, Suncity Business Tower, Second Floor, Sector-54, Golf Course Road, Gurugram (Haryana) 122002
Engineer
Mahesh Singhal
Triangle Chambers 232 Himmat Nagar Tonk Road Jaipur Rajasthan
Contractor
VANSH CONSTRUCTION AND DEVELOPERS
20, TEACHER COLONY, GOVINDGARH, DEHRADUN, UTTARAKHAND
Sr.Development work declared to RERA
1Demarcation of Plots
Residential plots of different sizes, group housing plots, commercial plots and public and semi-public use plots as approved by the authority and detailed in the annexure are demarcated on ground.
2Boundary Wall
No boundary wall is being provided by the developer for the individual plots. The boundary wall will be constructed by the buyers.
3Road Work
All the main arteries will have flexible pavements with different thicknesses of base and sub-base courses depending upon the CBR value of the soil underneath. All sub-arteries with required design thickness based on CBR value will be either flexible or rigid pavements.
4Footpaths
All main artery roads and sub-artery roads will have footpaths in the shoulders and these footpaths will be finished with the material which will allow rain water percolation into the soil below.
5Water Supply Including Drinking Water Facilities
Till the time UP Jal Nigam will be in a position to spare water from their sources for this township, underground water will be drawn for supplying to consumers, The water demand is calculated as per the water supply manual of Ministry of housing and urban development Govt. of India. The per capita consumption of water is considered as 135 lpcd. and based on this demand and estimated population water requirement has been worked out. the town ship is divided in to 3 water zones and each Zone will have its Underground Service reservoir adequate to store 2/3rd of the 24 hr water demand, in addition to this 1/3 rd storage will be in an overhead service reservoir with a staging height which will ensure a terminal pressure adequate for a 15 mtr high building. pumps of adequate capacity will be installed in each underground water reservoir to lift the water to overhead water reservoir, arrangement of standby pumps will also be made in every underground service reservoir. The desired treatment to ensure potability of water for human consumption will be done before water is lifted to O.H. S.R for distribution. The water distribution in township will be under gravity only. and HPDE/MDPE pipes will be used for distribution, Ferrules will be provided for each house connection and a water meter will be installed on service line of each dwelling unit, Bulk supply will be provided to bigger plots of group Housing/ commercial/PSP plots. The permission to draw water will be taken from CGWB.
6Sewer System
Sub-mains with provisions to link the disposal of each and every plot through chambers/ manholes will be laid infront of all the plots and these sub-mains will be connected to the manholes of trunk mains laid in the service corridors of the arterial and sub-arterial roads. The trunk mains will ultimately terminate into the STP where the sewerage will be treated and the residual water recycled into the township through a separate line and this water will be used for horticulture purposes and flushing purposes of high rise buildings. The total network will be of RCC spun pipes of NP2/NP3 grade.
7Drain
Dual network, one for roof top rain water connected to Rainwater Harvesting Pits provided at different locations as per the design, and the overflow of Rainwater Harvesting Pits will be connected to the external drainage network. The external drainage network will be provided to carry the road and plot run-offs and finally disposed off into the natural storm drains connected to river Yamuna passing adjacent to the area. Both the networks will be underground and RCC spun pipes of NP2/ NP3 grade will be used to carry the storm water.
8Parks
All the parks as proposed in the layout will be developed with provision for tot-lot areas, sports activity areas, lawns, jogging tracks and shrubs & shady trees as per the design.
9Tree Planting
Trees of different species will be planted on the periphery of the site and along roads. The species of the trees will be almost of the similar types which are already existing in the surrounding areas of our township. Big leaf trees will also be provided on the periphery.
10Design For Electric Supply Including Street Lighting
The electrical network designed for the township is as per Indian Electricity Act and rules, guide lines and regulations of UP electricity supply code 2005 and guide lines, and regulations of Uttar Pradesh Electricity regulatory Commission for electrical distribution networks in Private builders Townships. The source of supply for township will be from UP Power Corporation Ltd, and network within the township will be laid by the developer, the network will be mainly underground both for H.T as well as LT, The distribution will be 33/11/.4 KVA, the transforming of voltage will be at 11/.4 and for this electrical sub stations as per design will be erected in the town ship. As far as possible LED electrical fixtures will be used on s wedged poles along all the roads in township, the distance between poles and height of poles will be regulated by the uniform desired Lux levels without and dark spots on the roads, the Lux level of each road will be guided by the norms of relevant codes for street lighting and carriage way widths of roads.
11Community Buildings
Plots for various community buildings required as per the bye laws based on the density norms have been provided in the township and have been approved by the authorities. These community plots will be sold to various interested parties for developing buildings over them. However, the plots for police chowki, police station and telephone exchanges will be handed over to the government free of cost for development.
12Treatment and Disposal System of Sewage and Sullage water
As explained above the sewerage and sullage water will be treated in STPs and PHYTORID technology STP is proposed in the township. The recycle water will be used for irrigation purposes, car washing purposes and flushing purposes of high rise buildings.
13Solid Waste Management And Disposal System
Door to door collection of solid waste arrangement will be made in township through the maintenance agency which will be assigned maintenance of this town ship, besides this garbage bins and collection points have been proposed in the township. A tie up with the local municipality for organizing solid waste disposal of this township along with its other municipal areas will be entered in to.
14Water Conservation System
Rainwater Harvesting Pit numbers and size based on the design at different locations will be provided in the township and only the overflow of these pits will be drained into natural nalahs. The recycled water from STPs will be used for irrigation purposes, car washing purposes and flushing purposes of high rise buildings to decrease the fresh water requirement of the township.
15Energy Management System Including Use of Renewable Energy
LED luminaires will be used in the township and solar energy will be used for charging the energy accumulators and lighting of roads and parks will be done with these accumulators as source for energy.
16Fire Protection And Fire Safety System
As it is a township development, provisions have been made as per the National Building Code in the underground water tanks for the water required for fire fighting. Also, fire hydrants will be provided on recycled water line so that in the event of emergency water can be drawn from these hydrants by the fire department.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Schools from anganwadi to high school level will be developed in the township by the private players and plots as per the bye law requirements have been provided for the same. Besides these schools, community centre, health centres, bal kalyan centres and blood bank plots have been provided for.
18Emergency Evacuation Services
As it is a township development with parks and reasonably sized open areas so evacuation will not be a problem.
19Other Miscellaneous Work
The township is been developed with reasonably sized greens having Neighbourhood Sports activities centre.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 28 Nov 2027. 2 of them carry a revalidation.

Sanctioned by Mathura-Vrindavan Development Authority · 3,56,590 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
10/V/16-1727 May 201726 May 202226 May 202215 Aug 2022—
Plotted Residevelopment/Plotted Housing/02550/MVDA/LD/22-23/0520/1510202229 Nov 202228 Nov 202728 Nov 202714 Feb 202329 Nov 2022
Plotted Residevelopment/Plotted Housing/02550/MVDA/LD/22-23/0520/1510202229 Nov 202228 Nov 202728 Nov 202714 Feb 202329 Nov 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 13 Feb 2024.

#Granted fromExtended uptoNote
115 Aug 202213 Feb 2024Six months extension in view of force majeure caused by covid-19 pandemic
215 Aug 202214 Feb 2023Six months extension in view of force majeure caused by covid-19 pandemic
314 Feb 202313 Feb 2024—

Land & documents

25 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
227362120Khasra
22899470Khasra
22909480Khasra
229121170Khasra
230258820Khasra
230514160Khasra
230683630Khasra
230749420Khasra
230818210Khasra
23093940Khasra
232026170Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 4052
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5194
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 9796
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10044
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 1195
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 2723
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3746
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4260
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4227
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5925
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3068
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3068
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10494
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 15466
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3470
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 8657
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 13603
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3653
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jul 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Jul 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Jul 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Jul 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Jul 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Jul 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Jul 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Jul 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Jul 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 Aug 2019 ↗

Quarterly progress reports

16 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

16 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSUNCITY HI-TECH PROJECTS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM1698
PANAAJCS5668Q
CIN / TANU4501DL2005PTC143613
Name of chairmanANKIT GOEL
Registered addressLGF-10,Vasant square ,Plot-A, Sector-B, Pocket-V, community centre ,Vasant kunj, New Delhi-110070
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Mathura

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Suncity Hi Tech Projects Pvt Ltd Suncity Anantam Vrindavan RERA A/CBankYes BankBranchFortune Global GurgaonA/C no.IFSCYESB0000002
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Revised completion date on file2023-02-14 → 2024-02-13
changed in Estanzo’s record
3 Sept 2026
Completion extension
no. 3
extension 3 to 2024-02-13
newly filed with RERA
3 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 3 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Suncity Anantam Vrindavan

Is Suncity Anantam Vrindavan RERA registered?

Yes. Suncity Anantam Vrindavan is registered with UPRERA under registration number UPRERAPRJ541853, registered on 31 Aug 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has Suncity Anantam Vrindavan been completed?

UPRERA still lists Suncity Anantam Vrindavan as Registered, so it is not shown as completed here. A completion certificate dated 22 Oct 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Suncity Anantam Vrindavan?

SUNCITY HI-TECH PROJECTS PRIVATE LIMITED is the promoter entity that filed Suncity Anantam Vrindavan with UPRERA (promoter RERA ID UPRERAPRM1698). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Suncity Anantam Vrindavan more time to complete?

UPRERA's record carries 3 completion extensions for Suncity Anantam Vrindavan, the latest running to 13 Feb 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Suncity Anantam Vrindavan have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Suncity Anantam Vrindavan located?

Suncity Anantam Vrindavan is registered in Mathura, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗