Suncity Vrindavan is a RERA-registered residential project by SUNCITY HI-TECH PROJECTS PRIVATE LIMITED in Mathura (RERA ID UPRERAPRJ722234). Registered with a completion deadline of 31 Jan 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ722234 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mathura-Vrindavan Development Authority |
| Proposed start | 1 Feb 2023 |
| Project duration | 36 months |
| Address | Mathura, Mathura |
| Tehsil | Mathura |
| Applicant type | Company |
| Applicant address | LGF-10,Vasant square ,Plot-A, Sector-B, Pocket-V, community centre ,Vasant kunj, New Delhi-110070 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
Plotted Residevelopment/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 22 Jul 2023 |
| Original completion | 31 Jan 2026 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 22 Oct 2024 |
| Registration fee | ₹18,04,000 |
| Sanctioning authority | Mathura-Vrindavan Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Residential Plots of different sizes, commercial plots and PSP plots as approved by the authority are demarcated on ground |
| 2 | Boundary Wall No Boundary wall is being provided by the developer for the individual plots. |
| 3 | Road Work All the main arteries will have flexible payments with different thicknesses depends upon the CBR value of the soil underneath |
| 4 | Footpaths All the main artery roads and sub artery roads will have footpaths in the shoulder and these footpaths will be finished with the material which will allow rainwater percolation into the soil below |
| 5 | Water Supply Including Drinking Water Facilities Till the time UP Jal Nigam will be in position to spare water from their sources for this township, underground water will be drawn for supplying to consumer |
| 6 | Sewer System Sub mains with provision to link the disposal of each and every plot through chambers/manholes will be laid in front of all the plots and these sub mains will be connected to the manholes of main trunk line laid in the service corridors. The main trunkline will ultimately terminate to the STP where sewerage will be treated and the residual water recycled into the township through a separate line. |
| 7 | Drain Dual network, one for the rooftop rain water connected to the rainwater harvesting pit and the overflow of rainwater harvesting pit will be connected to the external drainage network |
| 8 | Parks All parks are proposed in the layout will be developed |
| 9 | Tree Planting Trees of different species will be planted on the perifery of the site and along the roads |
| 10 | Design For Electric Supply Including Street Lighting The electric network design for the township is as per the Indian Electricity Act and Rule, guidelines and the regulations of UP Electricity Supply code and regulation of UP Electricity Regulatory Commission for electrical distribution network in Private builders township |
| 11 | Community Buildings Plots for various community buildings are required as per byelaws based on the density norms have been provided in the township |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewerage will be treated in STP and PHYTORID technology STP is proposed in the township |
| 13 | Solid Waste Management And Disposal System Door-to-door collection of solid waste arrangement will be made in the township through a maintenance agency |
| 14 | Water Conservation System Rainwater harvesting pits, number, and sizes based on the design at different locations will be provided in the township |
| 15 | Energy Management System Including Use of Renewable Energy LED Lumenaires will be used in the township. |
| 16 | Fire Protection And Fire Safety System As it is a township development, provision has been made as per NBC |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Schools, highschools, and aganwadi will be developed in the township by the private players |
| 18 | Emergency Evacuation Services As it is a township development with reasonably sized open areas so evacuation is not a problem |
| 19 | Other Miscellaneous Work the township is developed with a reasonably sized green area with having sports activity center. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 28 Nov 2027. 1 of them carries a revalidation.
Sanctioned by Mathura-Vrindavan Development Authority · 3,59,730 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Plotted Resi development/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022 | 29 Nov 2022 | 28 Nov 2027 | 28 Nov 2027 | 31 Jan 2026 | — | |
| Plotted Residevelopment/Plotted Housing/02550/MVDA/LD/22-23/0520/15102022 | 29 Nov 2022 | 28 Nov 2027 | 28 Nov 2028 | 31 Jan 2026 | 29 Nov 2022 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
56 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 585 | 11940 | Khasra |
| 595min | 46430 | Khasra |
| 597min | 16006 | Khasra |
| 602 | 3320 | Khasra |
| 603min | 13040 | Khasra |
| 619 | 12340 | Khasra |
| 680 | 3750 | Khasra |
| 683 | 5830 | Khasra |
| 684 | 4810 | Khasra |
| 704 | 2890 | Khasra |
| 705 | 1470 | Khasra |
| 706 | 1490 | Khasra |
| 719min | 3090 | Khasra |
| 724A | 400 | Khasra |
| 724V | 750 | Khasra |
| 725A | 400 | Khasra |
| 725G | 750 | Khasra |
| 726min | 2370 | Khasra |
| 730 | 4970 | Khasra |
| 2144 | 14530 | Khasra |
| 2216 | 13360 | Khasra |
| 2218 | 6570 | Khasra |
| 2220 | 12200 | Khasra |
| 2221 | 19130 | Khasra |
| 2273min | 18800 | Khasra |
| 2289min | 2400 | Khasra |
| 2290min | 2400 | Khasra |
| 2299 | 440 | Khasra |
| 2302min | 18800 | Khasra |
| 2305min | 33720 | Khasra |
| 2307 | 7870 | Khasra |
| 2308min | 4300 | Khasra |
| 2312 | 19680 | Khasra |
| 2314 | 6880 | Khasra |
| 2316 | 6860 | Khasra |
| 2320min | 11480 | Khasra |
| 477min | 24264 | Khasra |
| Sale deed · 5200 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2336/2644/2688 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 799/11414 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12921 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2247 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10054 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9061 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1172/1173 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2058/1343/3210/803 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2339 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2335 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5049 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9877 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7313 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3427 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1701 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9301 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5387/3425 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2281 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9796 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 2723 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1195 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4052 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3407/13603/12438/15622 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3653/8657 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 3857 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4051 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 4260 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · NA The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 12 Jul 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 12 Jun 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 12 Jun 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 12 Jun 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 12 Jun 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 12 Jun 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 12 Jun 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 30 Jun 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 12 Jul 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 7 Jul 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 12 Jun 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 12 Jun 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 12 Jul 2023 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2025-Q4.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | SUNCITY HI-TECH PROJECTS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM1698 |
| PAN | AAJCS5668Q |
| CIN / TAN | U4501DL2005PTC143613 |
| Name of chairman | ANKIT GOEL |
| Registered address | LGF-10,Vasant square ,Plot-A, Sector-B, Pocket-V, community centre ,Vasant kunj, New Delhi-110070 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Mathura
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Suncity Hi-tech Projects Pvt Ltd - Collection Account for Suncity VrindavanBankICICI Bank LimitedBranchVrindavanBranch addressICICI Bank Ltd. Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001017 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Suncity Hi-tech Projects Pvt Ltd - Separate Account for Suncity VrindavanBankICICI Bank LimitedBranchVrindavanBranch addressICICI Bank Ltd, Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001017 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Suncity Hi-tech Projects Pvt Ltd - RERA Transaction Account for Suncity VrindavanBankICICI Bank LimitedBranchVrindavanBranch addressICICI Bank Ltd, Common Building, Near Balaji Ashram, Raman Reti Road, Vrindavan - 281121Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001017 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Suncity Vrindavan
Is Suncity Vrindavan RERA registered?
Yes. Suncity Vrindavan is registered with UPRERA under registration number UPRERAPRJ722234, registered on 22 Jul 2023. Estanzo reproduces that filing; it does not verify the work behind it.
Has Suncity Vrindavan been completed?
UPRERA still lists Suncity Vrindavan as Registered, so it is not shown as completed here. A completion certificate dated 22 Oct 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Suncity Vrindavan?
SUNCITY HI-TECH PROJECTS PRIVATE LIMITED is the promoter entity that filed Suncity Vrindavan with UPRERA (promoter RERA ID UPRERAPRM1698). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Suncity Vrindavan have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Suncity Vrindavan located?
Suncity Vrindavan is registered in Mathura, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗