SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1

UPRERAAbeyanceRERA data as of 17 Aug 2026

SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 is a RERA-registered residential project by ANSAL PROPERTIES & INFRASTRUCTURE LIMITED in Agra (RERA ID UPRERAPRJ5466). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA

RERA status as reported: Abeyance.
Project cost
4
Land area
3,000 0.74 acres
Units (from plan)
48
Density (derived)
65 /acre
Towers (from plan)
2
Config
1 BHK/2 BHK
Carpet
38-65
Registered
12 Aug 2017

Basic details

Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5466
Project categoryResidential
Registration typeOngoing
RERA statusAbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAgra Development Authority
Proposed start15 Apr 2010
Original start26 Sept 2009
Project duration117
AddressKiraoli, Agra
TehsilKiraoli
Applicant typeCompany
Applicant address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
Applicant contact6389022190 · reraansalapi@gmail.com

Registration & timeline

Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.

RERA registered12 Aug 2017
Promised completion31 Dec 2019
Revised completion— none granted
Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹20,000
Sanctioning authorityAgra Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.

Total units · towers · floors48 · 2 · 4 (units from plan)
  • 2 BHK32 67%
  • 1 BHK16 33%
ConfigurationUnitsCarpet area
1 BHK1638
2 BHK3265
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
C1-C2, Aastha 2 BHK · 2 BHK43265
C6-C7, Aastha 1 BHK · 1 BHK41638
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.

Architect
Rudrabhishek Enterprises (P) Ltd.
License CA/2008/43324
YMC Complex Rana Pratap Marg, Lucknow
Engineer
Rudrabhishek Enterprises (P) Ltd.
820, Antriksh Bhawan, New Delhi-1
Contractor
R.R. INFRASTRUCTURE
3L, 802 AWHO SOCITY, G. Noida G.B. Nagar
Sr.Development work declared to RERA
1Demarcation of Plots
Numbering
2Boundary Wall
Brick work and M S Railing
3Road Work
Bitumen roads
4Footpaths
CC / Pavers
5Water Supply Including Drinking Water Facilities
Deep borewell water through over head tank
6Sewer System
Concrete hume pipe network
7Drain
Concrete hume pipe network
8Parks
Lawn and children play area
9Tree Planting
Combination of ornamental and indigineous plants
10Design For Electric Supply Including Street Lighting
As per relevant codes and norms
11Community Buildings
N A
12Treatment and Disposal System of Sewage and Sullage water
Connected through S T P
13Solid Waste Management And Disposal System
Door to Door collection system
14Water Conservation System
Ground water recharge system
15Energy Management System Including Use of Renewable Energy
As per prevailing laws
16Fire Protection And Fire Safety System
As per N B C norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Guard room, Parks, Parking
18Emergency Evacuation Services
As per N B C norms
19Other Miscellaneous Work
Parks, Pathways
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. Being listed is a filing, not a recommendation, and RERA does not state here whether a registration is still valid.

Sr.AgentRERA registration
1ADVENTURES ENTERPRISES PVT LTDUPRERAAGT11208
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Land & documents

5 filings

What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
272, Atus6170
273, Atus10290
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

3 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 24 Jan 2007.

Registry no.DateTypeArea
100324 Jan 2007self
521328 Jun 2007self
835330 Nov 2007self
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 1003
The registered deed by which the promoter bought the land.
PDF
Sale deed · 8353
The registered deed by which the promoter bought the land.
PDF
Sale deed · 5213
The registered deed by which the promoter bought the land.
PDF
Document checklist
DocumentStatusUploaded
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New27 Jul 2018
Water supply plan
How the project proposed to supply water, as filed at registration.
New27 Jul 2018
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New27 Jul 2018

Facilities

as declared to RERA

What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Data as reported by UPRERA

Promoter (SPV) details

The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.

Legal nameANSAL PROPERTIES & INFRASTRUCTURE LIMITED
Roleprimary · current
RERA IDUPRERAPRM6378
PANAAACA0006D
CIN / TANL45101DL1967PLC004759
Name of chairmanSUSHIL ANSAL
Registered address115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001
RERA contactreraansalapi@gmail.com · 6389022190
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details - public record, shown as reported by UPRERA. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ANSAL PROPERTIES & INFRASTRUCTURE LTD.BankPUNJAB NATIONAL BANKBranchCONNAUGHT PLACEA/C no.4196002900001644IFSCPUNB0419600
Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.

  • No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1

Is SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 RERA registered?

Yes. SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 is registered with UPRERA under registration number UPRERAPRJ5466, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?

The completion date filed with UPRERA is 31 Dec 2019. No completion certificate is on record yet.

Who is the builder of SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?

ANSAL PROPERTIES & INFRASTRUCTURE LIMITED is the promoter entity that filed SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 with UPRERA (promoter RERA ID UPRERAPRM6378). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 located?

SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 is registered in Agra, as filed with UPRERA.

What configurations are available in SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?

The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?

The approved unit plan filed with UPRERA runs from 38 to 65 m² of carpet area (about 411 to 702 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?

The approved unit plan describes 2 blocks and 48 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?

About 65 units per acre: 48 planned units across 0.74 acres (3,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 17 Aug 2026. official source ↗