SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 is a RERA-registered residential project by ANSAL PROPERTIES & INFRASTRUCTURE LIMITED in Agra (RERA ID UPRERAPRJ5466). RERA status: Abeyance. Data as reported by UP-RERA. as reported by UPRERA
RERA status as reported: Abeyance.Basic details
Descriptive fields the promoter entered when registering. UP-RERA publishes them as filed and does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ5466 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | AbeyanceAbeyance“Held in suspension.” UP-RERA lists projects whose registration it has placed in abeyance.Read the full entry in the glossary |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 15 Apr 2010 |
| Original start | 26 Sept 2009 |
| Project duration | 117 |
| Address | Kiraoli, Agra |
| Tehsil | Kiraoli |
| Applicant type | Company |
| Applicant address | 115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001 |
| Applicant contact | 6389022190 · reraansalapi@gmail.com |
Registration & timeline
Dates on the registration itself. They do not describe the state of construction - the quarterly reports are where that is filed.
| RERA registered | 12 Aug 2017 |
| Promised completion | 31 Dec 2019 |
| Revised completion | — none granted |
| Completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹20,000 |
| Sanctioning authority | Agra Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: RERA publishes nothing about what is still unsold.
- 2 BHK32 67%
- 1 BHK16 33%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 16 | 38 |
| 2 BHK | 32 | 65 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| C1-C2, Aastha 2 BHK · 2 BHK | 4 | 32 | 65 |
| C6-C7, Aastha 1 BHK · 1 BHK | 4 | 16 | 38 |
Project team & development works
The filing names who was engaged and what was promised. It carries no status against any individual work, so none is shown.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Numbering |
| 2 | Boundary Wall Brick work and M S Railing |
| 3 | Road Work Bitumen roads |
| 4 | Footpaths CC / Pavers |
| 5 | Water Supply Including Drinking Water Facilities Deep borewell water through over head tank |
| 6 | Sewer System Concrete hume pipe network |
| 7 | Drain Concrete hume pipe network |
| 8 | Parks Lawn and children play area |
| 9 | Tree Planting Combination of ornamental and indigineous plants |
| 10 | Design For Electric Supply Including Street Lighting As per relevant codes and norms |
| 11 | Community Buildings N A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Connected through S T P |
| 13 | Solid Waste Management And Disposal System Door to Door collection system |
| 14 | Water Conservation System Ground water recharge system |
| 15 | Energy Management System Including Use of Renewable Energy As per prevailing laws |
| 16 | Fire Protection And Fire Safety System As per N B C norms |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Guard room, Parks, Parking |
| 18 | Emergency Evacuation Services As per N B C norms |
| 19 | Other Miscellaneous Work Parks, Pathways |
Registered agents
1 agent
Agents the promoter filed against this project. Being listed is a filing, not a recommendation, and RERA does not state here whether a registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | ADVENTURES ENTERPRISES PVT LTD | UPRERAAGT11208 |
Land & documents
5 filings
What the promoter placed on the record about how it holds the land. Not a title search - nothing here confirms the land is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 272, Atus | 6170 | — |
| 273, Atus | 10290 | — |
3 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 24 Jan 2007.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| 1003 | 24 Jan 2007 | self | — |
| 5213 | 28 Jun 2007 | self | — |
| 8353 | 30 Nov 2007 | self | — |
| Sale deed · 1003 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 8353 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5213 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 27 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 27 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 27 Jul 2018 ↗ |
Facilities
as declared to RERA
What the promoter declared at registration, in most cases a reference number for a filing made elsewhere such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | YES |
| Fire safety (as filed with RERA) | YES |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Data as reported by UPRERAPromoter (SPV) details
The legal entity carrying this project’s obligations under the Act. It may not be the brand the project is marketed under.
| Legal name | ANSAL PROPERTIES & INFRASTRUCTURE LIMITED |
| Role | primary · current |
| RERA ID | UPRERAPRM6378 |
| PAN | AAACA0006D |
| CIN / TAN | L45101DL1967PLC004759 |
| Name of chairman | SUSHIL ANSAL |
| Registered address | 115, ANSAL BHAWAN, 16, KG MARG, NEW DELHI-110001 |
| RERA contact | reraansalapi@gmail.com · 6389022190 |
| Registered since | 2017 |
RERA bank accounts
verify before payment
Not confirmation that any money is in these accounts, and account details change - verify against the official source before any payment.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | ANSAL PROPERTIES & INFRASTRUCTURE LTD.BankPUNJAB NATIONAL BANKBranchCONNAUGHT PLACEA/C no.4196002900001644IFSCPUNB0419600 |
What has changed on this record
nothing recorded yet
A row is when Estanzo first observed a difference, not proof that RERA’s record changed on that date.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
These are fields UP-RERA has not published for this project. The authority’s coverage is uneven and older registrations carry less of it, so an absence here is not evidence that anything is wrong - it is simply something this page cannot answer, and worth asking about.
- No sanctioning permit is published for this project.Ask which authority sanctioned the plans, for the permit number, and for the date it is valid to.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
Common questions about SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1
Is SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 RERA registered?
Yes. SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 is registered with UPRERA under registration number UPRERAPRJ5466, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?
The completion date filed with UPRERA is 31 Dec 2019. No completion certificate is on record yet.
Who is the builder of SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?
ANSAL PROPERTIES & INFRASTRUCTURE LIMITED is the promoter entity that filed SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 with UPRERA (promoter RERA ID UPRERAPRM6378). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 located?
SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1 is registered in Agra, as filed with UPRERA.
What configurations are available in SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?
The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?
The approved unit plan filed with UPRERA runs from 38 to 65 m² of carpet area (about 411 to 702 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?
The approved unit plan describes 2 blocks and 48 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is SUSHANT TAJ CITY AASTHA/KALPANA PHASE-1?
About 65 units per acre: 48 planned units across 0.74 acres (3,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 17 Aug 2026. official source ↗